75 unique locations 161 components 0 companies Page 1 of 2
Map View
Kennoxhead WF 132kV Substation, South Lanarkshire, Scotland (2 components)

New build onshore wind farm project. 13 no. wind turbine generator wind farm with an installed capacity of 62.4MW located in South Lanarkshire, Southern Scotland (2)

ORSTED ONSHORE UK LIMITED Onshore Wind
Inactive - 2024-25 (T-4), 2022-23 (T-1)
Chirmorie Wind Farm C72 FROM Gowland Terrace Barrhill, South of Chirmorie from Barrhill South Ayrshire Scotland (2 components)

This CMU will be formed of multiple wind turbine generator units controlled centrally & exporting to the Transmission system. (2)

CHIRMORIE WIND FARM LIMITED Onshore Wind
Inactive - 2023-24 (T-4), 2022-23 (T-3)
3km south of Tweedsmuir, Scottish Borders, ML12 6QR (nearest) (2 components)

New build onshore wind farm. (2)

WHITELAW BRAE WINDFARM LIMITED Onshore Wind
Inactive - 2023-24 (T-4), 2022-23 (T-3)
Farr and Glenkyllachy Estate, Inverness-shire. IV13 7YA (2 components)

20 turbine Onshore wind farm. (2)

GLEN KYLLACHY WIND FARM LIMITED Onshore Wind
Inactive - 2023-24 (T-4), 2022-23 (T-3)
Land to the south of Elvanfoot, South Lanarkshire, ML12 6RL (nearest) (3 components)

New Build Onshore Wind Farm. (2)

PEAK GEN POWER LIMITED Onshore Wind
Inactive - 2023-24 (T-4), 2022-23 (T-3)
Halsary Windfarm, Off A9, Halkirk, Caithness, Scotland KW12 6UW (3 components)

An onshore windfarm consisting of 15 x 2MW Wind Turbine Generators (WTGs) in northern Scotland, Caithness (3)

SCOTTISHPOWER RENEWABLES (UK) LIMITED Onshore Wind
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2021-22 (T-1)
Land west of the B788, Auchenfoil Road, Inverclyde, PA13 4TL (nearest) (2 components)

New build onshore wind farm. (2)

INVERCLYDE RENEWABLES LLP Onshore Wind
Inactive - 2023-24 (T-4), 2022-23 (T-3)
*Please see cover letter regarding postcode Aberarder Wind Farm, Aberarder Estate, Strathnairn, Highland Scotland (2 components)

New build wind farm at Aberarder consisting of 12 wind turbines. (2)

Aberarder Wind Farm LLP Onshore Wind
Inactive - 2023-24 (T-4), 2022-23 (T-3)
Kirk Hill Wind Farm Kirk Hill nr Kirkoswald South Ayrshire Scotland KA26 9SP (2 components)

This CMU (KHWF01) will be formed of multiple wind turbine generator units controlled centrally & exporting to the Distribution system. (2)

KIRK HILL WIND FARM LIMITED Onshore Wind
Inactive - 2023-24 (T-4), 2022-23 (T-3)
*Please see cover letter regarding postcode Blary Hill wind farm, Off C20 road (Barr Glen Road), Glenbarr, Tarbert, Scotland, UK (2 components)

New build wind farm at Blary Hill consisting of 14 wind turbines. (2)

BLARY HILL ENERGY LIMITED Onshore Wind
Inactive - 2023-24 (T-4), 2022-23 (T-3)
Land north west of Gilston Farm, Heriot, Scottish Borders, EH37 5TF (2 components)

New build onshore wind farm. (2)

Gilston Hill Windfarm Limted Onshore Wind
Inactive - 2023-24 (T-4), 2022-23 (T-3)
Beinn An Tuirc 3 Wind Farm, Kintyre Peninsula, Campbeltown, Argyll, PA28 6QY (3 components)

An onshore windfarm consisting of 11 x 3.6MW and 3 x 3.45MW Wind Turbine Generators (WTGs) on the Kintyre Peninsula. (3)

SCOTTISHPOWER RENEWABLES (UK) LIMITED Onshore Wind
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2021-22 (T-1)
Crossdykes Wind Farm, Langholm, Lockerbie, DG11 2QL (8 components)
  • • 23.000MW of Wind Generation (2)
  • • Wind Turbines to be installed at Crossdykes Wind Farm (2)
CROSSDYKES WF LIMITED Onshore Wind
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1) (and 1 more)
Stokeford Farm, East Stoke, Wareham, Dorset, BH20 7NU, England (1 components)

4 x 2MW wind turbine generators to be installed on the lands of Stokeford Farm, East Stoke, Dorset, England.

ALASKA WIND FARM LIMITED LIABILITY PARTNERSHIP Onshore Wind
Active - 2025-26 (T-4)
Lochluichart Estate, Garve, Ross-shire, Scotland IV23 2PQ (1 components)

5 x 4.2 wind turbine generators to be installed on Lochluichart Estate, Ross-shire, Scotland

BLUEBELL WIND FARM LIMITED Onshore Wind
Active - 2025-26 (T-4)
Limekiln Estate, Reay, Caithness, Scotland, KW14 7SD (1 components)

21 x 4.2MW wind turbine generators to be installed on Limekiln Estate, Caithness, Scotland

LIMEKILN WIND LIMITED Onshore Wind
Active - 2025-26 (T-4)
60-70 Reach Road Burwell CB25 0AH (3 components)
  • • 10MW of onshore wind generation
  • • 40MW of solar generation covering lower Portland Farm and land off Newnam Drove.
  • • 49.900MW storage installation
East Anglia Grid Storage One Limited Onshore Wind Solar Photovoltaic Storage (Duration 1h)
Active - 2024-25 (T-4)
Nr Elvanfoot, South Lanarkshire (1 components)

Onshore wind farm

Harryburn Wind Farm Limited Onshore Wind
Inactive - 2023-24 (T-4)
Broubster and Achaveilan North Forests, Reay, Caithness, Scotland, KW14 7RD (1 components)

5 x 4.2MW wind turbine generators to be installed on the lands of Broubster Forest and Achaveilan North Forest, Caithness, Scotland.

LIMEKILN EXTENSION LIMITED Onshore Wind
Active - 2025-26 (T-4)
Gordonbush Wind Farm, Brora, Sutherland, KW9 6LX (3 components)

Wind Farm with 11 Wind turbines (3)

SSE GENERATION LIMITED Onshore Wind
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1)
The site is located next to A836, Crask, Highland, Scotland (2 components)
  • • 22 wind turbines new built with expected capacity installed of 79.2 MW
  • • 22 wind turbines new built with expected capacity installed of 92.4 MW
CREAG RIABHACH WIND FARM LTD Onshore Wind
Inactive - 2024-25 (T-4), 2022-23 (T-3)
Kennoxhead Wind Farm Glentaggart Road, Glespin, South Lanarkshire, ML11 0SH (1 components)

22 no. wind turbine generator wind farm with an installed capacity of ~112 MW located in South Lanarkshire, Southern Scotland

ORSTED ONSHORE UK LIMITED Onshore Wind
Active - 2025-26 (T-4)
Watson Head Farm Watson Head Road Allanton Wishaw ML2 9PL (2 components)

1 x Wind Turbine Generating Unit (2)

WATSON HEAD WIND FARM LIMITED Onshore Wind
0.3 MW
Inactive - 2026-27 (T-4), 2023-24 (T-1)
Watson Head Farm Watson Head Road Allanton Wishaw ML2 9PL (2 components)

1 x 4.2MW Onshore Wind Turbine Generator (2)

WATSON HEAD WIND FARM LIMITED Onshore Wind
0.3 MW
Inactive - 2026-27 (T-4), 2023-24 (T-1)
Lambrigg Wind Farm, Kendal, Cumbria, LA8 0AP (1 components)

Lambrigg wind farm

BEAUFORT WIND LIMITED Onshore Wind
0.5 MW
Active - 2028-29 (T-4)
Bryn Meurig, Cemmaes, Machynileth, Wales, SY20 9PR (1 components)

Cemmaes: MPAN 1 ID: 1300038004491 MPAN 2 ID: 1300052122859 The CMU is an onshore windfarm connected to the distribution system

ROWAN ONSHORE WINDFARMS LIMITED Onshore Wind
0.5 MW
Active - 2028-29 (T-4)
Brownhill Farm, West Benhar Road, Eastfield, Harthill, Shotts, North Lanarkshire, ML7 5TG (2 components)
  • • 1 Wind Turbine Generator
  • • 1 x Wind Turbine Generator
BROWNHILL WIND FARM LTD Onshore Wind
0.6 MW
Active - 2026-27 (T-4)
Coldham Wind Farm - A, E Coldham Peterborough March Cambridgeshire PE14 0LX England (1 components)

An onshore windfarm consisting of 8 x 2MW wind turbine generators and a maximum export capacity of 14MW.

COLDHAM WINDFARM LIMITED Onshore Wind
0.9 MW
Active - 2028-29 (T-4)
Bryn Meurig, Cemmaes, Machynlleth, Wales, SY20 9PR (1 components)

"Cemmaes: MPAN 1 ID: 1300038004491 MPAN 2 ID: 1300052122859 The CMU is an onshore windfarm connected to the distribution system"

ROWAN ONSHORE WINDFARMS LIMITED Onshore Wind
1.0 MW
Active - 2027-28 (T-4)
Strathallan Wind Farm Land at Greenscares Plantation Langside Road Braco Perth FK15 9LN (2 components)

4x Enercon E70 E4 / 2300kW - curtailed to meet the grid connection export agreement of 8.000 MW. (2)

ZEPHYRUS GREEN ENERGY LTD Onshore Wind
1.1 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
North of Moniaive A702, Dumfries & Galloway DG7 3UG (1 components)

An onshore windfarm of 14x1.3 MW Wind Turbine Generator with an exports capacity of 18.2 MW.

SCOTTISHPOWER RENEWABLES (UK) LIMITED Onshore Wind
1.2 MW
Active - 2028-29 (T-4)
Pwlldraenllwyn, Llangwyryfon, Wales, SY23 4SR (2 components)

Llangwyryfon MPAN ID: 1300050649070 The CMU is an onshore windfarm connected to the distribution system (2)

ROWAN ONSHORE WINDFARMS LIMITED Onshore Wind
1.3 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Pearie Law, West Calder, West Lothian, EH55 8LT (4 components)

1 x Wind Turbine Generator

PEARIE LAW II WIND FARM LTD Onshore Wind
1.4 MW
Active - 2026-27 (T-4)
Glendevon, Glendevon forest, A823, Perth and Kinross FK14 7JY (1 components)

An onshore windfarm of 18x1.5 MW Wind Turbine Generators with an export capacity of 27 MW.

SCOTTISHPOWER RENEWABLES (UK) LIMITED Onshore Wind
1.8 MW
Active - 2028-29 (T-4)
High Swainston Farm, Wolviston, Billingham, England, TS22 5NS (2 components)

Walkway MPAN 1 ID: 1574000280390 MPAN 2 ID: 1574000280405 The CMU is an onshore windfarm connected to the distribution system (2)

ROWAN ONSHORE WINDFARMS LIMITED Onshore Wind
1.9 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Artfield Fell Wind Farm, Glenluce, Wigtonshire, DG8 0PD (1 components)

Wind farm consisting of 15 wind turbines

SSE GENERATION LIMITED Onshore Wind
1.9 MW
Active - 2028-29 (T-4)
Mynydd Clogau, Tegynon, Nr Adfa, Newtown, Powys, SY21 0AJ (2 components)

This CMU is Mynydd Clogau, an onshore wind farm situated in wales (2)

MYNYDD CLOGAU WINDFARM LIMITED Onshore Wind
2.0 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Artfield Fell Wind Farm, Glenluce, Wigtonshore, DG8 0PD (1 components)

Wind farm consisting of 15 wind turbines

SSE GENERATION LIMITED Onshore Wind
2.0 MW
Active - 2027-28 (T-4)
Mill Rig Wind Farm Waterhead Peelhill and Linbank Highway ML10 6RQ Scotland United Kingdom (1 components)

6 turbine onshore wind farm located in South Lanarkshire, Scotland.

MILL RIG WIND FARM LLP Onshore Wind
2.2 MW
Active - 2028-29 (T-4)
Alva, Clackmannanshire, Scotland, FK14 7JZ (4 components)
  • • Burnfoot East MPAN ID: 1800061120345 The CMU is an onshore windfarm connected to the distribution system (2)
  • • Burnfoot East MPAN ID: 1800061120345 The CMU is an onshore windfarm connected to the distribution system. (2)
ROWAN ONSHORE WINDFARMS LIMITED Onshore Wind
2.3 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-1) (and 1 more)
Greengairs Wind Farm, Greengairs, ML6 7TY (3 components)

Onshore Wind Farm at Greengairs (3)

KIWI POWER LTD Onshore Wind
2.5 MW
Inactive - 2027-28 (T-4), 2024-25 (T-1), 2023-24 (T-4)
Llanbabo Wind Farm (Llyn Alaw), Llanbabo, Amlwch, Anglesey, LL68 0TB (2 components)

This CMU is Llyn Alaw (Llanbabo) wind farm, an onshore wind farm situated in wales (2)

BEAUFORT WIND LIMITED Onshore Wind
2.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Dalquhandy Wind Farm, Dalquhandy Opencast Coal Site, Middlemuir Road, Coalburn, ML11 0EL (3 components)

New build onshore wind farm. (3)

DALQUHANDY WIND FARM LIMITED Onshore Wind
2.8 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2023-24 (T-1)
Priestgill Wind Farm, Little Gill Farm, Abington ML12 6RW (1 components)

Wind farm consisting of 7 of 6.6MW wind turbines

PRIESTGILL WIND FARM LIMITED Onshore Wind
3.1 MW
Active - 2027-28 (T-4)
Showing locations 1 - 50 of 75