Theme

Onshore Wind

9 unique locations 29 components 0 companies Page 1 of 1
Map View
Hazelside, Glespin, Lanark, Scotland, ML11 0RL (8 components)

13-turbine wind farm located in Lanark, Scotland with the installed capacity of 45.000MW (5)

DOUGLAS WEST WIND FARM LTD Onshore Wind
9.2 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 5 more)
Dalquhandy Wind Farm, Dalquhandy Opencast Coal Site, Middlemuir Road, Coalburn, ML11 0NN (3 components)
  • • 10 turbine onshore wind farm with a gross installed capacity of 42 MW in Lanarkshire, Scotland (2)
  • • New build onshore wind farm.
DALQUHANDY WIND FARM LIMITED Onshore Wind
3.2 MW
Active - 2025-26 (T-1), 2024-25 (T-4), 2024-25 (T-1)
Gordonbush Wind Farm, Brora, Sutherland, KW9 6LX (3 components)

Wind Farm with 11 Wind turbines (3)

SSE GENERATION LIMITED Onshore Wind
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1)
Kennoxhead WF 132kV Substation, South Lanarkshire, Scotland (2 components)

New build onshore wind farm project. 13 no. wind turbine generator wind farm with an installed capacity of 62.4MW located in South Lanarkshire, Southern Scotland (2)

ORSTED ONSHORE UK LIMITED Onshore Wind
Inactive - 2024-25 (T-4), 2022-23 (T-1)
The site is located next to A836, Crask, Highland, Scotland (2 components)
  • • 22 wind turbines new built with expected capacity installed of 79.2 MW
  • • 22 wind turbines new built with expected capacity installed of 92.4 MW
CREAG RIABHACH WIND FARM LTD Onshore Wind
Inactive - 2024-25 (T-4), 2022-23 (T-3)
Crossdykes Wind Farm, Langholm, Lockerbie, DG11 2QL (8 components)
  • • 23.000MW of Wind Generation (2)
  • • Wind Turbines to be installed at Crossdykes Wind Farm (2)
CROSSDYKES WF LIMITED Onshore Wind
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1) (and 1 more)
60-70 Reach Road Burwell CB25 0AH (3 components)
  • • 10MW of onshore wind generation
  • • 40MW of solar generation covering lower Portland Farm and land off Newnam Drove.
  • • 49.900MW storage installation
East Anglia Grid Storage One Limited Onshore Wind Solar Photovoltaic Storage (Duration 1h)
Active - 2024-25 (T-4)
Showing locations 1 - 9 of 9