Gordonbush Wind Farm, Brora, Sutherland, KW9 6LX (3 components)

Wind Farm with 11 Wind turbines (3)

SSE GENERATION LIMITED Onshore Wind
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1)
Crossdykes Wind Farm, Langholm, Lockerbie, DG11 2QL (8 components)
  • • 23.000MW of Wind Generation (2)
  • • Wind Turbines to be installed at Crossdykes Wind Farm
CROSSDYKES WF LIMITED Onshore Wind
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1) (and 1 more)
Watson Head Farm Watson Head Road Allanton Wishaw ML2 9PL (2 components)

1 x Wind Turbine Generating Unit (2)

WATSON HEAD WIND FARM LIMITED Onshore Wind
0.3 MW
Inactive - 2026-27 (T-4), 2023-24 (T-1)
Watson Head Farm Watson Head Road Allanton Wishaw ML2 9PL (2 components)

1 x 4.2MW Onshore Wind Turbine Generator (2)

WATSON HEAD WIND FARM LIMITED Onshore Wind
0.3 MW
Inactive - 2026-27 (T-4), 2023-24 (T-1)
Dalquhandy Wind Farm, Dalquhandy Opencast Coal Site, Middlemuir Road, Coalburn, ML11 0EL (3 components)

New build onshore wind farm. (3)

DALQUHANDY WIND FARM LIMITED Onshore Wind
2.8 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2023-24 (T-1)
Harting Rig Wind Farm, Lambhill Road, Nr Strathaven, South Lanarkshire, ML106XF (3 components)

Wind Turbine Generators x 15 (3)

KYPE EXTENSION WIND FARM LIMITED Onshore Wind
4.1 MW
Inactive - 2026-27 (T-4), 2024-25 (T-1), 2023-24 (T-1)
Cumberhead Wind Farm, Douglas, Lanark, ML11 0SY (4 components)
  • • Existing generation windfarm. (2)
  • • New build windfarm.
CUMBERHEAD WIND ENERGY LIMITED Onshore Wind
7.2 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 1 more)
C35, DG7 3UF, Castle Douglas , Scotland (5 components)

12-turbine wind farm located in Scotland with the installed capacity of 43.200MW (3)

ENERSYST LIMITED Onshore Wind
9.4 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
Aikengall IIa Wind Farm Innerwick EH42 1SG (5 components)

Existing Generation CMU - Onshore Wind. Connected at WesterDod 132kV substation. (3)

AIK2A SUSTAINABLE ENERGY LTD Onshore Wind
17.5 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-1) (and 2 more)
Showing locations 1 - 9 of 9