• Aberthaw 7 OCGT fuel type distillate
-
• Aberthaw 8 Coal fired
-
• Aberthaw 8 OCGT fuel is distillate
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
4 x reciprocating engines
(3)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 2 more)
Energy facility comprising of reciprocating engine sets and ancillary equipment.
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
-
• A new 299MW Open Cycle Gas Turbine peaking plant
(2)
-
• A new Open Cycle Gas Turbine peaking plant
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
Multiple gas engines capable of exporting electricity.
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
-
• Existing CCGT Baglan Unit 1
(2)
-
• Existing BAGE-1 CCGT repowered with new gas turbine and substantial BOP improvements
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
-
• The CMU will be formed of multiple individual diesel reciprocating generating units controlled centrally and exporting to the distribution system.
-
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
-
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
-
• Gas fired reciprocating engines.
(2)
-
• Reciprocating Engines
Inactive -
2024-25 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 2 more)
-
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
(2)
-
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
6 x reciprocating engines
(3)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 2 more)
Energy facility comprising of reciprocating engine sets and ancillary equipment.
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
-
• The CMU will be formed of multiple individual diesel reciprocating generating units controlled centrally and exporting to the distribution system.
-
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
-
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
-
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines
-
• New build power station comprised of multiple reciprocating engines
Inactive -
2024-25 (T-4),
2021-22 (T-4)
New build power station comprised of multiple reciprocating engines.
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
4 x reciprocating engines
(3)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 2 more)
-
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
-
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
-
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
Gas Fired Generating Station
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 1 more)
-
• A new 299MW Open Cycle Gas Turbine (OCGT) power peaking plant
(2)
-
• A new Open Cycle Gas Turbine (OCGT) power peaking plant
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
-
• Generating Unit 1
-
• Generating Unit 2
-
• Generating Unit 3
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 2 more)
-
• Aux. load separately metered
-
• GT5
-
• GT8
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 2 more)
CMU will be formed of multiple individual gas reciprocating engine units
(3)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 2 more)
Gas peaking reciprocating engine
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
Gas Peaking Reciprocating Engine
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
Centrica Peterborough Power Station (PPS) is an Open Cycle Gas Turbine (OCGT) electricity generating station.
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
A Prospective New Build Gas reciprocating energy reserve facility
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2020-21 (T-4)
(and 2 more)
Existing Gas Engine
(3)
4.8 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
A generating station consisting on multiple reciprocating engines and alternators located on a single site
(3)
5.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 2 more)
Gas reciprocating engines
(3)
6.0 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 2 more)
Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear
(3)
8.1 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 2 more)
Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW
(3)
9.5 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 2 more)
Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW.
(3)
9.5 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 2 more)
The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(3)
9.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
Operational reciprocating gas engines
(3)
11.3 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
Gas reciprocating engines
(3)
11.4 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
Gas reciprocating engines.
(3)
13.7 MW
Inactive -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 2 more)
The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(3)
14.9 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 2 more)
The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(3)
16.9 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 2 more)
The CMU component comprises of three 2MW Reciprocating Gas Engines
(3)
16.9 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear
(3)
21.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW.
(3)
22.6 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Operational gas reciprocating engine.
(2)
-
• Operational Reciprocating Engine
22.6 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(3)
27.3 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(3)
27.9 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(3)
28.3 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(3)
28.3 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(3)
28.3 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(3)
28.3 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(3)
28.3 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
(2)
-
• 16MW Power plant comprising reciprocating engines.The Power plant is connected to the local distribution and gas network.
44.4 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
(2)
-
• 16 MW power plant comprising reciprocating engines. The power plant is connected to the local distribution network and local gas …
44.5 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)