• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(2)
-
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
-
• The CMU Component is made up of brand new gas-fired engines.
(2)
-
• The CMU Component is made up of reciprocating diesel engines.
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
-
• 20MW of containerised, gas-fired generation together with transformers, switchgear and associated control gear
(2)
-
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control …
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
A generating station consisting of multiple reciprocating engines and alternators located on a single site.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
A generating station consisting of multiple reciprocating engines and alternators located on a single site
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
Gas reciprocating engines
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
-
• The CMU Component is made of brand new gas-fired engines.
(2)
-
• The CMU Component is made up of gas-fired engines.
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
-
• Gas fired reciprocating engines
(2)
-
• Gas reciprocating engines
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
-
• Gas fired reciprocating engines
(2)
-
• Gas reciprocating engines
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
-
• 17.5MW of containerised, gas-fired generating capacity together with transformers, switchgear and associated control gear
(2)
-
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control …
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
Gas reciprocating engines
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
-
• 10 MW power plant comprising of 5x2MW gas fired reciprocating engines. The power plant is connected to the local distribution …
(2)
-
• 10 MW power plant comprising of 5x2MW gas fired reciprocating engines. The power plant will be connected to the local …
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
10 gas reciprocating engines used for power generation, with associated infrastructure.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
-
• Gas generating unit(s)
(2)
-
• Gas fired generating sets.
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2019-20 (T-1)
(and 1 more)
Gas reciprocating engines
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
Gas fired reciprocating engines.
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
-
• A 20MW New Build gas fuelled generating station.
-
• A 8MW New Build gas fuelled generating station.
-
• a new build gas generating station
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
NEW BUILD GAS GENERATION STATION
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2019-20 (T-1)
-
• Battery Storage Plant
-
• Gas peaking reciprocating engine
-
• Gas peaking reciprocating engines
Inactive -
2022-23 (T-4),
2021-22 (T-4)
Gas fired reciprocating engines.
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
-
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(2)
-
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
10 gas reciprocating engines used for power generation, with associated infrastructure.
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
-
• 5 MW of demand reduction
(2)
-
• NEW BUILD GAS FUELLED GENERATION STATION
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
A Prospective New Build Gas reciprocating energy reserve facility
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
-
• 16 MW power plant comprising 8x2MW gas reciprocating engines. The power plant is connected to the local distribution network and …
(2)
-
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution …
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
Gas fired generating sets
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2018-19 (T-1)
Two gas turbines (CX501-KB7) rated at 5.3MW each.
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2019-20 (T-1)
(and 1 more)
New reciprocating genset in acoustic enclosure
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
Centrica Brigg Power Station is an Open Cycle Gas Turbine (OCGT) electricity generating station.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
Gas reciprocating engines
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
-
• A 8MW New Build gas fuelled generating station.
(2)
-
• A 20MW New Build gas fuelled generating station.
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
Gas fired reciprocating engines.
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
A 20MW new build gas generating station..
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2018-19 (T-1)
Gas generation peaking plant comprising of 9 x 2MW engines
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
A 8MW New Build gas fuelled generating station.
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
-
• A 20MW New Build gas fuelled generating station.
-
• A New Build gas fuelled generating station.
Inactive -
2022-23 (T-4),
2021-22 (T-4)
-
• New reciprocating genset in acoustic enclosure
-
• New containerised battery storage equipment
-
• New reciprocating genset in acoustic enclosure
Inactive -
2022-23 (T-4),
2018-19 (T-1)
-
• New reciprocating genset in acoustic enclosure
-
• New reciprocating engine in acoustic enclosure.
Inactive -
2022-23 (T-4),
2018-19 (T-1)
-
• 20 MWs of multiple reciprocating generator units to be installed on designated land off main Road, Weston.
-
• 20 MWs of reciprocating engine generation connecting into existing 33kV substation
-
• 20 MWs of reciprocating engine generation connecting into existing 33kv substation
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
Gas reciprocating engines
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
New build power station comprised of multiple reciprocating engines.
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2018-19 (T-1)
-
• Gas engines in a peaking plant environment
-
• New gas engines in a peaking plant environment, servicing power generation and DSR.
Inactive -
2022-23 (T-4),
2021-22 (T-4)
The CMU is a new reciprocating engine based gas fuelled generating unit.
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
-
• 3 gas reciprocating engines used for power generation, with associated infrastructure.
(2)
-
• Battery storage and associated infrastructure
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
NEW BUILD GAS FUELLED GENERATING STATION
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
Gas fired reciprocating engines.
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)