The CMU component is a combined cycle gas turbine
(5)
2492.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• Killingholme Module 1 converted to open cycle operation
(8)
-
• Killingholme Module 2 converted to open cycle operation
(8)
-
• Killingholme Module 1 converted to open cycle operation please see letter uploaded in metering section that explains determination of three …
(3)
-
• ... and 3 more unique descriptions
1775.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 10 more)
1 x OCGT
(5)
177.1 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor.
(3)
-
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
-
• Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator …
119.6 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• 21MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas …
(6)
-
• 21 MW power plant comprising 11 gas reciprocating engines. Power plant will be connected to the local distribution network and …
(2)
58.9 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 5 more)
-
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local …
(3)
-
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
(2)
44.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
(5)
44.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 4 more)
-
• 16 MW power plant comprising reciprocating engines. The power plant is connected to the local distribution network and local gas …
(3)
-
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
(2)
44.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• 16MW Power plant comprising 8x2MW gas reciprocating engines.The Power plant is connected to the local distribution and gas network.
(4)
-
• 16MW Power plant comprising reciprocating engines.The Power plant is connected to the local distribution and gas network.
(3)
-
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connectd to the WPD distribution …
(2)
-
• ... and 2 more unique descriptions
44.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 11 more)
-
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(5)
-
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
(5)
28.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 8 more)
The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(5)
28.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(5)
28.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(5)
28.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(5)
-
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
(5)
-
• The CMU will be formed of multiple individual gas units controlled centrally and exporting to the distribution system.
28.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 8 more)
The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(5)
27.9 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(5)
-
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
(5)
27.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 8 more)
Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW.
(5)
22.6 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear
(5)
21.2 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
The CMU component comprises of three 2MW Reciprocating Gas Engines
(5)
16.9 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(4)
-
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
16.9 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
-
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(4)
-
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
14.9 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
-
• Gas reciprocating engines.
(4)
-
• Gas reciprocating engines
13.7 MW
Inactive -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
Gas reciprocating engines
(5)
11.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 4 more)
-
• Reciprocating gas engines running on natural gas
(4)
-
• Additional reciprocating gas engines running on natural gas returned to service
10.2 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 5 more)
-
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(3)
-
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
(2)
9.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 6 more)
Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW
(5)
9.5 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW.
(5)
9.5 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
-
• 10 x 2MW OCGT gas reciprocating engines
-
• 3 x 2MW OCGT gas reciprocating engines
-
• 4 x 2MW OCGT gas reciprocating engines
-
• ... and 2 more unique descriptions
9.4 MW
Inactive -
2027-28 (T-4),
2021-22 (T-4),
2020-21 (T-4)
Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear
(5)
8.1 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
Gas reciprocating engines
(5)
6.0 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 6 more)
-
• A generating station consisting on multiple reciprocating engines and alternators located on a single site
(10)
-
• CMU consisting of multiple reciprocating engines and alternators
5.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 10 more)
Existing Gas Engine
(5)
4.8 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• Gas fired reciprocating engines
-
• New Build Generating CMU comprising of battery storage and associated plant.
2.8 MW
Inactive -
2026-27 (T-4),
2021-22 (T-4)
Gas reciprocating engines
(5)
1.9 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
Gas fired generating sets
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2018-19 (T-1)
New reciprocating genset in acoustic enclosure
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
Gas reciprocating engines
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
Gas fired reciprocating engines.
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
A 20MW new build gas generating station..
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
A 8MW New Build gas fuelled generating station.
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
-
• A 20MW New Build gas fuelled generating station.
-
• A New Build gas fuelled generating station.
Inactive -
2022-23 (T-4),
2021-22 (T-4)
-
• 20 MWs of reciprocating engine generation connecting into existing 33kV substation
-
• 20 MWs of reciprocating engine generation connecting into existing 33kv substation
-
• 20 MWs of reciprocating generator units to be installed on designated land at Thornton Lane, near Markfield.
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
-
• New reciprocating genset in acoustic enclosure
(2)
-
• New containerised battery storage equipment
-
• New reciprocating genset in acoustic enclosure
Inactive -
2022-23 (T-4),
2018-19 (T-1)
-
• New reciprocating genset in acoustic enclosure
-
• New reciprocating engine in acoustic enclosure.
Inactive -
2022-23 (T-4),
2018-19 (T-1)
-
• 20 MWs of multiple reciprocating generator units to be installed on designated land at Fordbridge Lane, Blackwell.
-
• 20 MWs of reciprocating engine generation connecting into existing 33kV substation
-
• 20 MWs of reciprocating engine generation connecting into existing 33kv substation
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
-
• 20 MWs of multiple reciprocating generator units to be installed on designated land off main Road, Weston.
-
• 20 MWs of reciprocating engine generation connecting into existing 33kV substation
-
• 20 MWs of reciprocating engine generation connecting into existing 33kv substation
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
New build power station comprised of multiple reciprocating engines.
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2018-19 (T-1)
NEW BUILD GAS FUELLED GENERATING STATION
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
Gas fired reciprocating engines.
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
Aux Load subtracted prior to the metering point
Inactive -
2021-22 (T-4)