An Energy from Waste facility located in Cheshire. The Facility will utilise conventional mass-burn technology which is the most proven Energy from Waste technology currently available. The process will consist …
Inactive -
2022-23 (T-4)
New Build Energy from Waste Plant
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-3)
An Energy from Waste facility located in Leicestershire. The facility will utilise conventional mass-burn technology which is the most proven Energy from Waste technology currently available. The process will consist …
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4)
The CMU Component is power generation based on Port Talbot Steelworks and using waste gases as the primary fuel . Please see Letter of Clarification attached to the prequalification submission.
Inactive -
2023-24 (T-1)
-
• Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and a …
(3)
-
• Twin stream Energy from Waste plant with a connection capacity of 37.216MW, a construction export guarantee of 34.1MW and a …
-
• Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and an …
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
Energy from waste Facility
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
Energy from Waste facility
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2021-22 (T-4)
Energy From Waste facility
(2)
Inactive -
2023-24 (T-4),
2021-22 (T-4)
FM1 is a twin boiler, single steam turbine energy from waste plant exporting at 132kV to the NPG area network.
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
Energy from Waste Facility
(5)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 3 more)
Energy from Waste facility
Active -
2024-25 (T-4)
Energy from Waste facility
Active -
2024-25 (T-4)
Energy pellet generating unit to be installed on the designated land at Uskmouth Power station, West Nash Road Nash. Newport. NP18 2BZ
Active -
2024-25 (T-4)
Energy from waste plant
Active -
2024-25 (T-1)
Twin boiler, single steam turbine energy from waste plant exporting at 132kV
Active -
2024-25 (T-4)
Single stream energy from waste plant exporting at 66kV.
Active -
2024-25 (T-4)
-
• Dunbar ERF, Energy from Waste
-
• Twin stream Energy from Waste plant with a connection capacity of 36MW and an expected export of 34MW. Located in …
Inactive -
2020-21 (T-4),
2019-20 (T-1)
Energy from Waste facility
Active -
2024-25 (T-4)
An Energy from Waste facility located in Cheshire. The Facility will utilise conventional mass burn technology which is the most proven Energy from Waste technology currently available. The process will …
(2)
Inactive -
2024-25 (T-4),
2023-24 (T-4)
-
• 2 stream municipal waste incinerator generating electricity through one turbine generator. Electricity is used on site with the excess being …
(3)
-
• 2 stream municipal waste incinerator
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 3 more)
VIT301 - 18MW Steam Turbine at Drakelow Energy Generation Facility, Walton Road, Burton upon Trent, DE15 9UA
(2)
Active -
2025-26 (T-4),
2024-25 (T-4)
Twin boiler, single steam turbine energy from waste plant exporting at 33kV
(2)
Inactive -
2024-25 (T-4),
2023-24 (T-4)
Energy Recovery Facility burning waste
(3)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
Energy from Waste facility for the combustion of waste and the generation of energy, comprising the main EfW facility, a Bottom Ash processing facility and Education/Visitor Centre, together with Associated/Ancillary …
(3)
Inactive -
2022-23 (T-4),
2022-23 (T-3),
2020-21 (T-1)
(and 1 more)
-
• 2 stream Municipal waste incinerator: Total installed capacity 7.3MW, DNC 6.2MW
(2)
-
• 2 stream Municipal waste incinerator: Total installed capacity 7.4MW, DNC 6.3MW. We have added covering letters on the following, change …
Inactive -
2021-22 (T-4),
2019-20 (T-1),
2018-19 (T-1)
Municipal waste incineration plant located in Wolverhampton, Staffordshire. It is based on boilers supplying steam to a turbine-generator.
Inactive -
2021-22 (T-1)
-
• 2 stream municipal waste incinerator. Total Installed capacity 8.7MW, DNC 8.35MW
(2)
-
• 2 stream municipal waste incinerator. Total Installed capacity 8.7MW, DNC 7.3MW. We have added covering letters on the following, change …
Inactive -
2021-22 (T-4),
2019-20 (T-1),
2018-19 (T-1)
Twin stream Energy from Waste plant with a maximum connection capacity of 27MW and an expected export of at least 24MW, located in Beddington Lane, Croydon.
Inactive -
2019-20 (T-1)
Energy from Waste facility
Active -
2024-25 (T-4)
Energy from waste facility
2.2 MW
Active -
2025-26 (T-1)
-
• Existing Generating CMU comprising of a gas fuelled reciprocating engine and gas delivery plant.
(2)
-
• New Build Generating CMU comprising of a CHP asset producing energy from waste.
(2)
-
• Generating CMU comprising of a CHP asset producing energy from waste
3.3 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 1 more)
New Build Municipal waste incineration plant located in Perthshire, Scotland. It is based on one boiler supplying steam to a single turbine-generator. The CMU is connected to the Distribution Network
6.9 MW
Active -
2028-29 (T-4)
Energy from Waste plant fuelled by biomass
(3)
8.4 MW
Inactive -
2028-29 (T-4),
2024-25 (T-4),
2023-24 (T-1)
-
• energy from waste unit
-
• generating gas unit
9.9 MW
Active -
2027-28 (T-4)
-
• Energy from Waste Facility which exports at between 3 MW and 4 MW subject to calorific value of waste and …
(3)
-
• Energy from Waste Facility located in Grace Road, Exeter.
(2)
10.1 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Inclined grate residual Waste-to-Energy facility comprising 5-boilers and 4-turbines.
(5)
17.6 MW
Inactive -
2025-26 (T-1),
2024-25 (T-4),
2023-24 (T-4)
(and 7 more)
Existing Energy from Waste Plant
(5)
18.9 MW
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 7 more)
On-site CHP - existing generating unit
(5)
19.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Municipal waste incineration plant located in Chineham Hampshire. It is based on one boiler supplying steam to a turbine-generator.
(5)
19.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
Existing Energy from Waste Plant
(12)
27.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 10 more)
Existing Energy from Waste Plant
(5)
28.1 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Energy-from-Waste plant fuelled by refuse derived fuel (waste).
(2)
29.8 MW
Active -
2028-29 (T-4),
2025-26 (T-1)
Steam turbine powered by heat recovery steam generator using municipal and commercial waste as a fuel source.
(2)
38.0 MW
Active -
2026-27 (T-4),
2025-26 (T-4)
-
• On-Site Generating CMU.
(2)
-
• On-Site Generating Steam Turbine, utilising heat recovery waste as a 'fuel input' and generating electricity w/o fossil fuel emissions.
(2)
-
• On-Site Generating Steam Turbine, utilising high pressure steam waste from on-site refinery processes as a 'fuel input' and generating electricity …
38.0 MW
Active -
2025-26 (T-1),
2024-25 (T-4),
2024-25 (T-1)
Municipal waste incineration plant located in Portsmouth Hampshire. It is based on boilers supplying steam to a turbine-generator.
(5)
38.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
-
• New CMU ID due to updated Grid Connection Agreement FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with …
(5)
-
• FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not …
(3)
-
• FCC (E+M) Limited, New build 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load …
(3)
38.6 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 8 more)
Municipal waste incineration plant located in Marchwood Hampshire. It is based on boilers supplying steam to a turbine-generator.
(5)
40.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
New Build Energy from waste facility
43.9 MW
Active -
2028-29 (T-4)
An Energy from Waste facility located in Walsall, Staffordshire. The facility will utilise conventional mass-burn technology which is the most proven Energy from Waste technology currently available. The process will …
44.2 MW
Active -
2027-28 (T-4)
Steam turbine at energy from waste facility located in Newhaven East Sussex
(7)
44.6 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 5 more)