Search Map View Statistics Support Us Help Login Register

Energy from Waste

7 unique locations 51 components 0 companies Page 1 of 1
Lakeside EFW, Lakeside Road, Colnbrook, SL3 0FE (8 components)
  • • Energy From Waste plant located in Colnbrook, capable of generating 40.5MW and exporting over 36 MW to the distribution network. (2)
  • • Energy From Waste plant located in Colnbrook, capable of generating 40.5MW and exporting over 37MW to the distribution network. (2)
  • • Energy From Waste plant located in Colnbrook, capable of generating 41MW and exporting over 36 MW to the distribution network. (2)
  • • ... and 1 more unique descriptions
LAKESIDE ENERGY FROM WASTE LIMITED Energy from Waste
96.6 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 5 more)
Veolia Tyseley, James Road, Tyseley, Birmingham, B11 2BA (12 components)

Municipal waste incineration plant located in Tyseley Birmingham. It is based on boilers supplying steam to a turbine-generator. (10)

ENEL X UK LIMITED Energy from Waste
72.8 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 8 more)
Lincoln EfW, Paving Way Off Whisby Road, North Hykeham, Lincoln, Lincolnshire, LN6 3QW (15 components)
  • • New CMU identifier due to updated grid connection agreement and change of method to calculate the connection capacity to "Historic … (5)
  • • This new CMU identifier is the replacement of LINC01 due to change in the Connection Capacity to Grid Connection Capacity … (3)
  • • FCC Lincoln Energy From Waste Plant Paving Way off Whisby Road Lincoln LN6 3QW. Energy from waste plant located in … (2)
  • • ... and 1 more unique descriptions
FCC Recycling (UK) Limited Coal/biomass Energy from Waste
46.2 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 10 more)
Weetabix, Station Rd, Burton Latimer, Kettering NN15 5JR, United Kingdom (12 components)

On-site CHP - existing generating unit (5)

GRIDBEYOND LIMITED Energy from Waste
19.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Baddesley O&M Ltd, Merevale Lane, Atherstone, Warwickshire, CV9 2LA (3 components)

Energy from Waste plant fuelled by biomass (3)

E.ON UK PLC Energy from Waste
8.4 MW
Inactive - 2028-29 (T-4), 2024-25 (T-4), 2023-24 (T-1)
Alne Material Recovery Facility, Forest Lane, Alne, York, YO61 1TU (7 components)
  • • Existing Generating CMU comprising of a gas fuelled reciprocating engine and gas delivery plant. (2)
  • • New Build Generating CMU comprising of a CHP asset producing energy from waste. (2)
  • • Generating CMU comprising of a CHP asset producing energy from waste
ALLIUM HELMSLEY LTD Energy from Waste Reciprocating engines
3.3 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 1 more)
Port Talbot Steelworks, Port Talbot, SA13 2NG (1 components)

The CMU Component is power generation based on Port Talbot Steelworks and using waste gases as the primary fuel . Please see Letter of Clarification attached to the prequalification submission.

TATA STEEL UK LIMITED Energy from Waste
Inactive - 2023-24 (T-1)
Showing locations 1 - 7 of 7