An Energy from Waste facility located in Leicestershire. The facility will utilise conventional mass-burn technology which is the most proven Energy from Waste technology currently available. The process will consist … (2)
Energy from waste Facility (3)
Energy from Waste facility (3)
FM1 is a twin boiler, single steam turbine energy from waste plant exporting at 132kV to the NPG area network. (2)
Energy from Waste Facility (5)
An Energy from Waste facility located in Cheshire. The Facility will utilise conventional mass-burn technology which is the most proven Energy from Waste technology currently available. The process will consist …
Energy from Waste facility for the combustion of waste and the generation of energy, comprising the main EfW facility, a Bottom Ash processing facility and Education/Visitor Centre, together with Associated/Ancillary … (3)
Inclined grate residual Waste-to-Energy facility comprising 5-boilers and 4-turbines. (5)
Existing Energy from Waste Plant (5)
Municipal waste incineration plant located in Chineham Hampshire. It is based on one boiler supplying steam to a turbine-generator. (5)
Existing Energy from Waste Plant (12)
Existing Energy from Waste Plant (5)
Municipal waste incineration plant located in Portsmouth Hampshire. It is based on boilers supplying steam to a turbine-generator. (5)
Municipal waste incineration plant located in Marchwood Hampshire. It is based on boilers supplying steam to a turbine-generator. (5)
Steam turbine at energy from waste facility located in Newhaven East Sussex (7)
An energy from waste facility located in North Wales and designed to generate electricity (5)
This new CMU identifier is the replacement for the MER001, MERC01 and MERC02 as the CMU is operational since April 2017. The CMU capacity is 19.619 MW, reduced from 25 … (5)
Existing Energy from Waste Plant (5)
Existing Energy from Waste Plant (5)
Municipal waste incineration plant located in Staffordshire. It is based on boilers supplying steam to a turbine-generator. (5)
This CMU identifier is the replacement for BUCK01, BUCK02, FCCB01, due to the change in Connection Capacity as per rule 3.5.2 and change from "New build CMU" to "Existing CMU" … (5)
This CMU identifier is the replacement of ALL001 due to changes of unit capacity and connection agreement. The connection capacity is based on historic data as per rule 3.5.3 Allington … (5)
Energy from Waste Recovery Facility (12)