Search Map View Statistics Support Us Help Login Register

Energy from Waste

5 unique locations 48 components 0 companies Page 1 of 1
Lakeside EFW, Lakeside Road, Colnbrook, SL3 0FE (8 components)
  • • Energy From Waste plant located in Colnbrook, capable of generating 40.5MW and exporting over 36 MW to the distribution network. (2)
  • • Energy From Waste plant located in Colnbrook, capable of generating 40.5MW and exporting over 37MW to the distribution network. (2)
  • • Energy From Waste plant located in Colnbrook, capable of generating 41MW and exporting over 36 MW to the distribution network. (2)
  • • ... and 1 more unique descriptions
LAKESIDE ENERGY FROM WASTE LIMITED Energy from Waste
96.6 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 5 more)
Veolia Tyseley, James Road, Tyseley, Birmingham, B11 2BA (12 components)

Municipal waste incineration plant located in Tyseley Birmingham. It is based on boilers supplying steam to a turbine-generator. (10)

ENEL X UK LIMITED Energy from Waste
72.8 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 8 more)
Lincoln EfW, Paving Way Off Whisby Road, North Hykeham, Lincoln, Lincolnshire, LN6 3QW (15 components)
  • • New CMU identifier due to updated grid connection agreement and change of method to calculate the connection capacity to "Historic … (5)
  • • This new CMU identifier is the replacement of LINC01 due to change in the Connection Capacity to Grid Connection Capacity … (3)
  • • FCC Lincoln Energy From Waste Plant Paving Way off Whisby Road Lincoln LN6 3QW. Energy from waste plant located in … (2)
  • • ... and 1 more unique descriptions
FCC Recycling (UK) Limited Coal/biomass Energy from Waste
46.2 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 10 more)
Weetabix, Station Rd, Burton Latimer, Kettering NN15 5JR, United Kingdom (12 components)

On-site CHP - existing generating unit (5)

GRIDBEYOND LIMITED Energy from Waste
19.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Avonmouth ERF, Severn Road, Chittering, Bristol, BS11 0YU (5 components)
  • • Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and a … (3)
  • • Twin stream Energy from Waste plant with a connection capacity of 37.216MW, a construction export guarantee of 34.1MW and a …
  • • Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and an …
VIRIDOR ENERGY LIMITED Energy from Waste
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 2 more)
Showing locations 1 - 5 of 5