Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Energy from Waste

7 unique locations 16 components 0 companies Page 1 of 1
Map View
Stoke EfW plant Campbell Road Sideway Stoke on Trent St4 4DX (6 components)
  • • 2 stream municipal waste incinerator generating electricity through one turbine generator. Electricity is used on site with the excess being … (3)
  • • 2 stream municipal waste incinerator (2)
HANFORD WASTE SERVICES LIMITED Coal/biomass Energy from Waste
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 3 more)
Lakeside EfW, Lakeside Road, Colnbrook, SL3 0FE (6 components)

Energy from Waste Facility (5)

LAKESIDE ENERGY FROM WASTE LIMITED Coal/biomass Energy from Waste
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 3 more)
Javelin Park Energy From Waste Plant, Javelin Park Bath Road Near Haresfield, Gloucestershire (6 components)

Energy from Waste facility for the combustion of waste and the generation of energy, comprising the main EfW facility, a Bottom Ash processing facility and Education/Visitor Centre, together with Associated/Ancillary … (3)

Waterswallows Energy Limited Energy from Waste
Inactive - 2022-23 (T-4), 2022-23 (T-3), 2020-21 (T-1) (and 1 more)
Lister Road Dudley West Midlands DY2 8JT (3 components)
  • • 2 stream Municipal waste incinerator: Total installed capacity 7.3MW, DNC 6.2MW (2)
  • • 2 stream Municipal waste incinerator: Total installed capacity 7.4MW, DNC 6.3MW. We have added covering letters on the following, change …
Dudley Waste Services Limited Coal/biomass Energy from Waste
Inactive - 2021-22 (T-4), 2019-20 (T-1), 2018-19 (T-1)
Wolverhampton EfW Crown Street West Midlands WV1 1QB (3 components)
  • • 2 stream municipal waste incinerator. Total Installed capacity 8.7MW, DNC 8.35MW (2)
  • • 2 stream municipal waste incinerator. Total Installed capacity 8.7MW, DNC 7.3MW. We have added covering letters on the following, change …
Wolverhampton Waste Services Limited Coal/biomass Energy from Waste
Inactive - 2021-22 (T-4), 2019-20 (T-1), 2018-19 (T-1)
Beddington ERF, 105 Beddington Lane, Croydon, CR0 4TE (1 components)

Twin stream Energy from Waste plant with a maximum connection capacity of 27MW and an expected export of at least 24MW, located in Beddington Lane, Croydon.

Valencia Waste Management Limited Energy from Waste
Inactive - 2019-20 (T-1)
Dunbar ERF, Oxwell Mains, Dunbar, East Lothian, EH42 1SW (2 components)
  • • Dunbar ERF, Energy from Waste
  • • Twin stream Energy from Waste plant with a connection capacity of 36MW and an expected export of 34MW. Located in …
VIRIDOR ENERGY LIMITED Energy from Waste
Inactive - 2020-21 (T-4), 2019-20 (T-1)
Showing locations 1 - 7 of 7