FM1 is a twin boiler, single steam turbine energy from waste plant exporting at 132kV to the NPG area network.
(4)
207.3 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 1 more)
Energy from Waste Recovery Facility
(12)
206.6 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 10 more)
FM2 is a twin boiler, single steam turbine energy from waste plant exporting at 132kV to the NPG area network
(2)
135.9 MW
Active -
2028-29 (T-4),
2027-28 (T-4)
-
• Existing energy from waste generation unit in operation from February 2015. Site is located on Barlow Way Runcorn and electricity …
(10)
-
• Existing generation unit.
(2)
121.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 10 more)
New build Energy from Waste recovery facility
(2)
120.4 MW
Active -
2027-28 (T-4),
2026-27 (T-4)
Kelvin is an energy-from-waste facility which is currently under construction with scheduled commissioning in 2025. A connection offer has been accepted with Western Power Distribution.
(3)
118.8 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
This CMU identifier is the replacement of ALL001 due to changes of unit capacity and connection agreement. The connection capacity is based on historic data as per rule 3.5.3 Allington …
(5)
98.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• Energy From Waste plant located in Colnbrook, capable of generating 40.5MW and exporting over 36 MW to the distribution network.
(2)
-
• Energy From Waste plant located in Colnbrook, capable of generating 40.5MW and exporting over 37MW to the distribution network.
(2)
-
• Energy From Waste plant located in Colnbrook, capable of generating 41MW and exporting over 36 MW to the distribution network.
(2)
-
• ... and 1 more unique descriptions
96.6 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 5 more)
-
• Twin stream Energy Recovery Facility (ERF) or Energy from Waste which can generate up to 37.5MW of power and export …
(3)
-
• Twin stream Energy Recovery Facility (ERF) or Energy from Waste located in Glass Avenue, Cardiff.
(2)
95.8 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
SG is a twin boiler, single steam turbine energy from waste plant exporting at 132kV to the NPG area network.
(3)
79.4 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
Municipal waste incineration plant located in Tyseley Birmingham. It is based on boilers supplying steam to a turbine-generator.
(10)
72.8 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 8 more)
This CMU identifier is the replacement for BUCK01, BUCK02, FCCB01, due to the change in Connection Capacity as per rule 3.5.2 and change from "New build CMU" to "Existing CMU" …
(5)
72.0 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
Municipal waste incineration plant located in Staffordshire. It is based on boilers supplying steam to a turbine-generator.
(5)
70.0 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 5 more)
Existing Energy from Waste Plant
(5)
64.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Existing Energy from Waste Plant
(5)
61.6 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• Steam Turbine Generator
-
• The CMU is a Waste-to-Energy facility located in Port Clarence. The facility is designed to process waste feedstock and recover …
53.6 MW
Active -
2027-28 (T-4),
2026-27 (T-4)
-
• Energy from Waste facility
(2)
-
• Energy from Waste facility.
(2)
52.0 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2024-25 (T-4)
(and 1 more)
This new CMU identifier is the replacement for the MER001, MERC01 and MERC02 as the CMU is operational since April 2017. The CMU capacity is 19.619 MW, reduced from 25 …
(5)
51.9 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
New Build Energy form Waste facility.
48.4 MW
Active -
2028-29 (T-4)
An energy from waste facility located in North Wales and designed to generate electricity
(5)
46.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
-
• New CMU identifier due to updated grid connection agreement and change of method to calculate the connection capacity to "Historic …
(5)
-
• This new CMU identifier is the replacement of LINC01 due to change in the Connection Capacity to Grid Connection Capacity …
(3)
-
• FCC Lincoln Energy From Waste Plant Paving Way off Whisby Road Lincoln LN6 3QW. Energy from waste plant located in …
(2)
-
• ... and 1 more unique descriptions
46.2 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 10 more)
Steam turbine at energy from waste facility located in Newhaven East Sussex
(7)
44.6 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 5 more)
An Energy from Waste facility located in Walsall, Staffordshire. The facility will utilise conventional mass-burn technology which is the most proven Energy from Waste technology currently available. The process will …
44.2 MW
Active -
2027-28 (T-4)
New Build Energy from waste facility
43.9 MW
Active -
2028-29 (T-4)
Municipal waste incineration plant located in Marchwood Hampshire. It is based on boilers supplying steam to a turbine-generator.
(5)
40.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
-
• New CMU ID due to updated Grid Connection Agreement FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with …
(5)
-
• FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not …
(3)
-
• FCC (E+M) Limited, New build 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load …
(3)
38.6 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 8 more)
Municipal waste incineration plant located in Portsmouth Hampshire. It is based on boilers supplying steam to a turbine-generator.
(5)
38.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
-
• On-Site Generating CMU.
(2)
-
• On-Site Generating Steam Turbine, utilising heat recovery waste as a 'fuel input' and generating electricity w/o fossil fuel emissions.
(2)
-
• On-Site Generating Steam Turbine, utilising high pressure steam waste from on-site refinery processes as a 'fuel input' and generating electricity …
38.0 MW
Active -
2025-26 (T-1),
2024-25 (T-4),
2024-25 (T-1)
Steam turbine powered by heat recovery steam generator using municipal and commercial waste as a fuel source.
(2)
38.0 MW
Active -
2026-27 (T-4),
2025-26 (T-4)
Energy-from-Waste plant fuelled by refuse derived fuel (waste).
(2)
29.8 MW
Active -
2028-29 (T-4),
2025-26 (T-1)
Existing Energy from Waste Plant
(5)
28.1 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Existing Energy from Waste Plant
(12)
27.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 10 more)
Municipal waste incineration plant located in Chineham Hampshire. It is based on one boiler supplying steam to a turbine-generator.
(5)
19.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
On-site CHP - existing generating unit
(5)
19.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Existing Energy from Waste Plant
(5)
18.9 MW
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 7 more)
Inclined grate residual Waste-to-Energy facility comprising 5-boilers and 4-turbines.
(5)
17.6 MW
Inactive -
2025-26 (T-1),
2024-25 (T-4),
2023-24 (T-4)
(and 7 more)
-
• Energy from Waste Facility which exports at between 3 MW and 4 MW subject to calorific value of waste and …
(3)
-
• Energy from Waste Facility located in Grace Road, Exeter.
(2)
10.1 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• energy from waste unit
-
• generating gas unit
9.9 MW
Active -
2027-28 (T-4)
Energy from Waste plant fuelled by biomass
(3)
8.4 MW
Inactive -
2028-29 (T-4),
2024-25 (T-4),
2023-24 (T-1)
New Build Municipal waste incineration plant located in Perthshire, Scotland. It is based on one boiler supplying steam to a single turbine-generator. The CMU is connected to the Distribution Network
6.9 MW
Active -
2028-29 (T-4)
-
• Existing Generating CMU comprising of a gas fuelled reciprocating engine and gas delivery plant.
(2)
-
• New Build Generating CMU comprising of a CHP asset producing energy from waste.
(2)
-
• Generating CMU comprising of a CHP asset producing energy from waste
3.3 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 1 more)
Energy from waste facility
2.2 MW
Active -
2025-26 (T-1)
Energy from Waste facility
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2021-22 (T-4)
-
• 2 stream municipal waste incinerator generating electricity through one turbine generator. Electricity is used on site with the excess being …
(3)
-
• 2 stream municipal waste incinerator
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 3 more)
An Energy from Waste facility located in Cheshire. The Facility will utilise conventional mass burn technology which is the most proven Energy from Waste technology currently available. The process will …
(2)
Inactive -
2024-25 (T-4),
2023-24 (T-4)
Energy from waste Facility
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
-
• Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and a …
(3)
-
• Twin stream Energy from Waste plant with a connection capacity of 37.216MW, a construction export guarantee of 34.1MW and a …
-
• Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and an …
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
Energy from Waste facility
Active -
2024-25 (T-4)
-
• Dunbar ERF, Energy from Waste
-
• Twin stream Energy from Waste plant with a connection capacity of 36MW and an expected export of 34MW. Located in …
Inactive -
2020-21 (T-4),
2019-20 (T-1)
Single stream energy from waste plant exporting at 66kV.
Active -
2024-25 (T-4)