16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
(5)
44.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
(5)
44.2 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• 17.315 MW installed capacity Battery Storage facility
(2)
-
• 17.615 MW installed capacity Battery Storage facility
(2)
-
• 19.791 MW installed capacity Battery Storage facility
5.1 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• 10.0MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
(3)
-
• 8.179 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
-
• 8.436 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
2.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• 6.000MW of storage located at Westoning
(4)
-
• 6.000MW of battery storage located at Westoning.
1.1 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 4 more)
-
• Load curtailment
(7)
-
• Load curtailment from refridgeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 5 more)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(9)
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 9 more)
-
• Load drop
(5)
-
• Load curtailment from refridgeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 3 more)
-
• Load drop
(5)
-
• Load curtailment from refridgeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 3 more)
-
• Load curtailment
(7)
-
• Load curtailment from refridgeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 5 more)
-
• Load drop
(5)
-
• Load curtailment from refridgeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 3 more)
-
• Load drop
(5)
-
• Load curtailment from refridgeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 3 more)
-
• Load drop
(5)
-
• Load curtailment from refridgeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 3 more)
-
• Load curtailment
(7)
-
• Load curtailment from refridgeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 5 more)
-
• Load curtailment
(7)
-
• Load curtailment from refridgeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 5 more)
-
• Load curtailment
(7)
-
• Load curtailment from refridgeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 5 more)
-
• Load drop
(5)
-
• Load curtailment from refridgeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 3 more)
-
• Load curtailment
(7)
-
• Load curtailment from refridgeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 5 more)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(6)
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 3 more)
-
• Load reduction on site supported by non-exporting standby generation.
(6)
-
• Load curtailment from refridgeration
-
• Load reduction from refrigeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
-
• Load curtailment
(7)
-
• Load curtailment from refridgeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 5 more)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(6)
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 4 more)
-
• Load curtailment
(7)
-
• Load curtailment from refridgeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 5 more)
-
• Load drop
(5)
-
• Load curtailment from refridgeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 3 more)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(9)
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 9 more)
Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(11)
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 11 more)
-
• Load drop
(5)
-
• Load curtailment from refridgeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 3 more)
-
• Load curtailment
(7)
-
• Load curtailment from refridgeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 5 more)
-
• Load curtailment
(7)
-
• Load curtailment from refridgeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 5 more)
-
• Load drop
(5)
-
• Load curtailment from refridgeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 3 more)
-
• Load curtailment
(7)
-
• Load curtailment from refridgeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 5 more)
-
• Load curtailment
(7)
-
• Load curtailment from refridgeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 5 more)
-
• Load curtailment
(7)
-
• Load curtailment from refridgeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 5 more)
-
• Load drop
(5)
-
• Load curtailment from refridgeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 3 more)
-
• Load drop
(5)
-
• Load curtailment from refridgeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 3 more)
-
• Load drop
(5)
-
• Load curtailment from refridgeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 3 more)
-
• Load curtailment
(7)
-
• Load curtailment from refridgeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 5 more)
-
• Load curtailment
(7)
-
• Load curtailment from refridgeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 5 more)
Paper products manufacturing site carrying out DSR by load turn-down
(10)
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 10 more)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(9)
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 8 more)
-
• Load curtailment
(7)
-
• Load curtailment from refridgeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 5 more)
-
• Load drop
(5)
-
• Load curtailment from refridgeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 3 more)
-
• Load drop
(5)
-
• Load curtailment from refridgeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 3 more)
-
• Load curtailment
(7)
-
• Load curtailment from refridgeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 5 more)
-
• Load drop
(5)
-
• Load curtailment from refridgeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 3 more)
-
• Load drop
(5)
-
• Load curtailment from refridgeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 3 more)
-
• Load drop
(5)
-
• Load curtailment from refridgeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 3 more)
-
• Load drop
(5)
-
• Load curtailment from refridgeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 3 more)
-
• Load curtailment
(7)
-
• Load curtailment from refridgeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 5 more)
-
• Load curtailment
(7)
-
• Load curtailment from refridgeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 5 more)