• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(3)
-
• existing CHP on site
(2)
21.0 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• 17.315 MW installed capacity Battery Storage facility
(2)
-
• 17.615 MW installed capacity Battery Storage facility
(2)
-
• 19.791 MW installed capacity Battery Storage facility
5.1 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• 10.0MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
(3)
-
• 8.179 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
-
• 8.436 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
2.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Load reduction on site supported by non-exporting standby generation.
(10)
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 8 more)
-
• Load reduction on site supported by non-exporting standby generation.
(6)
-
• Load curtailment from refridgeration
-
• Load reduction from refrigeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
-
• Load reduction on site supported by non-exporting standby generation.
(6)
-
• Load curtailment from refridgeration
-
• Load reduction from refrigeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(11)
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 11 more)
-
• Load reduction on site supported by non-exporting standby generation.
(6)
-
• Load curtailment from refridgeration
-
• Load reduction from refrigeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
Load reduction on site supported by non-exporting standby generation.
(10)
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 8 more)
Load reduction on site supported by non-exporting standby generation.
(7)
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 5 more)
-
• Load reduction on site supported by non-exporting standby generation
(4)
-
• Load reduction on site supported by non-exporting standby generation.
(3)
-
• Load curtailment from refridgeration
-
• ... and 1 more unique descriptions
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(5)
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• Load reduction on site supported by non-exporting standby generation.
(3)
-
• Load curtailment from refridgeration
-
• Load reduction from refrigeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
Load reduction on site supported by non-exporting standby generation.
(5)
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• Load reduction on site supported by non-exporting standby generation.
(3)
-
• Load curtailment from refridgeration
-
• Load reduction from refrigeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(5)
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• Load reduction on site supported by non-exporting standby generation.
(3)
-
• Load curtailment from refridgeration
-
• Load reduction from refrigeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
-
• A standby diesel generator on a waster water treatment works.
(3)
-
• A standby diesel generator on a waste water treatment works.
(2)
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2024-25 (T-4)
(and 6 more)
-
• Load reduction on site supported by non-exporting standby generation.
(3)
-
• Load curtailment from refridgeration
-
• Load reduction from refrigeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(5)
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• Load reduction on site supported by non-exporting standby generation.
(3)
-
• Load curtailment from refridgeration
-
• Load reduction from refrigeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
-
• Load reduction on site supported by non-exporting standby generation.
(3)
-
• Load curtailment from refridgeration
-
• Load reduction from refrigeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
-
• Load reduction on site supported by non-exporting standby generation.
(3)
-
• Load curtailment from refridgeration
-
• Load reduction from refrigeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
-
• Load reduction on site supported by non-exporting standby generation.
(3)
-
• Load curtailment from refridgeration
-
• Load reduction from refrigeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
-
• Load reduction on site supported by non-exporting standby generation.
(3)
-
• Load curtailment from refridgeration
-
• Load reduction from refrigeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
-
• Load reduction
(3)
-
• Load reduction on site
(2)
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
CMU INO200 represents demand assets on the Inovyn ChlorVinyls Ltd site in Runcorn, Cheshire. The asset uses electricity for Chemical manufacture. Site load can easily be altered to suit demand …
(5)
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• Load reduction on site supported by non-exporting standby generation.
(3)
-
• Load curtailment from refridgeration
-
• Load reduction from refrigeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
load curtailment at site
(5)
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• Load reduction on site supported by non-exporting standby generation.
(3)
-
• Load curtailment from refridgeration
-
• Load reduction from refrigeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
-
• Load reduction on site supported by non-exporting standby generation.
(3)
-
• Load curtailment from refridgeration
-
• Load reduction from refrigeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
load curtailment at site
(5)
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• Load reduction on site supported by non-exporting standby generation.
(3)
-
• Load curtailment from refridgeration
-
• Load reduction from refrigeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
-
• Load reduction on site supported by non-exporting standby generation.
(3)
-
• Load curtailment from refridgeration
-
• Load reduction from refrigeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
-
• Load reduction on site supported by non-exporting standby generation.
(3)
-
• Load curtailment from refridgeration
-
• Load reduction from refrigeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
Load reduction on site supported by non-exporting standby generation.
(5)
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(5)
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• Load reduction on site supported by non-exporting standby generation.
(3)
-
• Load curtailment from refridgeration
-
• Load reduction from refrigeration
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(5)
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(5)
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
(5)
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(5)
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• Load Response - Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(3)
-
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(2)
Inactive -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-1)
(and 7 more)
Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(5)
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(5)
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
Load reduction on site supported by non-exporting standby generation.
(5)
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 4 more)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(5)
Inactive -
2026-27 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 6 more)
Palm Paper Limited operates a large paper making site in King's Lynn, Norfolk. The onsite industrial process is an energy intensive paper recycling and manufacturing plant. Palm Paper plans to …
(5)
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 7 more)
-
• 3.600MW of demand reduction
(4)
-
• 3.6MW of demand reduction
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 5 more)
Load reduction on site supported by non-exporting standby generation.
(3)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2022-23 (T-4)