Load reduction
(5)
Inactive -
2022-23 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 3 more)
Load reduction
(5)
Inactive -
2022-23 (T-3),
2021-22 (T-4),
2020-21 (T-4)
(and 2 more)
Load reduction
(5)
Inactive -
2022-23 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 3 more)
-
• Load reduction.
(3)
-
• Load reduction
(2)
Inactive -
2022-23 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 3 more)
-
• Load reduction
(3)
-
• Load shedding
(2)
Inactive -
2022-23 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 3 more)
-
• Load drop by on-site generation
(3)
-
• Load drop
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 1 more)
6MW of DSR
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-4)
(and 1 more)
Standby generation, submetered, taking site load
(5)
Inactive -
2023-24 (T-1),
2022-23 (T-4),
2021-22 (T-4)
(and 4 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(4)
Inactive -
2023-24 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
-
• DSR Component providing load turn down at a retail store
(3)
-
• Import/Export metering with diesel generation at a retail store
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 4 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(5)
Inactive -
2023-24 (T-1),
2022-23 (T-1),
2021-22 (T-1)
(and 3 more)
Peak power plant
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 4 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(5)
Inactive -
2023-24 (T-1),
2022-23 (T-1),
2021-22 (T-1)
(and 3 more)
Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 6 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(5)
Inactive -
2023-24 (T-1),
2022-23 (T-1),
2021-22 (T-1)
(and 3 more)
-
• Standby diesel generator that reduces site load when generating.
(2)
-
• Standby generation
(2)
-
• Standby generation from a POSGU.
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 2 more)
4MW of DSR
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-4)
(and 1 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(4)
Inactive -
2023-24 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(4)
Inactive -
2023-24 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(4)
Inactive -
2023-24 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 7 more)
19MW of DSR
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-4)
(and 1 more)
Chemical manufacturer
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 4 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(4)
Inactive -
2023-24 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
6MW of DSR
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-4)
(and 1 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(4)
Inactive -
2023-24 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
-
• Peak power plant
(4)
-
• Gas reciprocating engine
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 5 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(4)
Inactive -
2023-24 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
Generator at the Hospital
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 4 more)
-
• Peak power plant
(4)
-
• Gas reciprocating engine
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 5 more)
4MW of DSR
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-4)
(and 1 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(4)
Inactive -
2023-24 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(4)
Inactive -
2023-24 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(4)
Inactive -
2023-24 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(4)
Inactive -
2023-24 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
Behind the Meter Generation
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 5 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(3)
Inactive -
2023-24 (T-4),
2021-22 (T-1),
2020-21 (T-4)
-
• BtM storage providing standby capacity
(2)
-
• BtM storage/standby generation; non exporting
(2)
-
• BtM storage as standby generation, non-exporting
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 3 more)
-
• DSR Component providing load turn down at a retail store
(3)
-
• Import/Export metering with diesel generation at a retail store
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 4 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(4)
Inactive -
2023-24 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
-
• Peak power plant
(4)
-
• Reciprocating engine
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 6 more)
Distribution Centre with behind the meter back-up generation.
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 3 more)
Paper mill industrial site
(5)
Inactive -
2023-24 (T-4),
2023-24 (T-1),
2022-23 (T-4)
(and 6 more)
-
• Peak power plant
(4)
-
• Gas reciprocating engine
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 6 more)
The CMU Component reduces import demand by turning on back up generation.
(2)
Inactive -
2020-21 (T-4),
2020-21 (T-1),
2019-20 (T-1)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive -
2020-21 (T-4),
2020-21 (T-1)
The CMU Component reduces import demand by turning on back up generation.
(2)
Inactive -
2020-21 (T-4),
2020-21 (T-1),
2019-20 (T-1)
The CMU Component reduces import demand by turning on back up generation.
(2)
Inactive -
2020-21 (T-4),
2020-21 (T-1),
2019-20 (T-1)
The CMU Component reduces import demand by turning on back up generation.
(2)
Inactive -
2020-21 (T-4),
2020-21 (T-1),
2019-20 (T-1)
The CMU Component reduces import demand by turning on back up generation.
(2)
Inactive -
2020-21 (T-4),
2020-21 (T-1),
2019-20 (T-1)