6MW of DSR
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-4)
(and 1 more)
1.200MW of battery storage located at Durham.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
Materials recycling plant.
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 4 more)
-
• 3MW of DSR
(3)
-
• 0.1MW of demand reduction
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
-
• DSR Component providing load turn down at a retail store
(3)
-
• Import/Export metering with diesel generation at a retail store
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 4 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(5)
Inactive -
2023-24 (T-1),
2022-23 (T-1),
2021-22 (T-1)
(and 3 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(5)
Inactive -
2023-24 (T-1),
2022-23 (T-1),
2021-22 (T-1)
(and 3 more)
Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 6 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(5)
Inactive -
2023-24 (T-1),
2022-23 (T-1),
2021-22 (T-1)
(and 3 more)
Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
4MW of DSR
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-4)
(and 1 more)
Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
20MW of DSR
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
1.200MW of battery storage located at Stockton-on-Tees.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
1.200MW of battery storage located at Durham.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
0.800MW of battery storage located at Wiltshire.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
10.000MW DSR
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
1.200MW of battery storage located at Preston.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 7 more)
19MW of DSR
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-4)
(and 1 more)
Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
1.200MW of battery storage located at Hook.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
29MW of DSR
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
-
• 4MW of DSR
(3)
-
• 1 x 800kW/1100KWh Lithium Ion Battery
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
(and 1 more)
Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 4 more)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 4 more)
6MW of DSR
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-4)
(and 1 more)
Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 4 more)
8MW Energy Storage facility located in Harrogate.
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
1.200MW of battery storage located at Preston.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
2.6MW of demand reduction
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
-
• Plastics recycling facility located next to material recycling facility comprising several DSR loads: belts, cranes.
(3)
-
• Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 4 more)
Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 4 more)
4MW of DSR
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-4)
(and 1 more)
20.000MW of battery storage located at Lascar Works
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
0.4MW demand reduction
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
Crystal glass recycling facility.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
20.000 MW of battery storage located at Macclesfield.
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
(and 1 more)
-
• DSR Component providing load turn down at a retail store
(3)
-
• Import/Export metering with diesel generation at a retail store
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 4 more)
The CMU is composed of two CHPs (ECOMAX® 15 NGS) with an electrical output capacity of 1.501 MWe each. The CMU will supply electricty on site to METTIS AEROSPACE LIMITED.
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 4 more)
1.000MW of battery storage located at Staffordshire.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
Distribution Centre with behind the meter back-up generation.
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 3 more)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 4 more)
Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 4 more)
-
• 2MW of DSR
(3)
-
• 0.250 MW of demand reduction
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 4 more)
1.200MW of battery storage located at Westoning.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)