16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
(5)
44.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
(5)
44.2 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Component has yet to be procured
(5)
Inactive -
2027-28 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 3 more)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(5)
Inactive -
2026-27 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 6 more)
-
• Industrial Gases production processes. DSR delivered through process interruption
(4)
-
• Industrial Gases production site. DSR provided through process interruption.
Inactive -
2025-26 (T-1),
2024-25 (T-1),
2023-24 (T-1)
(and 5 more)
-
• Industrial Gases production processes. DSR delivered through process interruption
(4)
-
• Industrial Gases production site. DSR provided through process interruption.
Inactive -
2025-26 (T-1),
2024-25 (T-1),
2023-24 (T-1)
(and 5 more)
-
• Industrial Gases production processes. DSR delivered through process interruption
(4)
-
• Industrial Gases production site. DSR provided through process interruption.
Inactive -
2025-26 (T-1),
2024-25 (T-1),
2023-24 (T-1)
(and 5 more)
-
• 1.200MW Battery Energy Storage System
(3)
-
• 1.200 MW of demand reduction
-
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 …
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2022-23 (T-4)
(and 4 more)
-
• 1.200MW Battery Energy Storage System
(3)
-
• 1.2 MW of demand reduction
-
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 …
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2022-23 (T-4)
(and 4 more)
Industrial Gases production site. DSR provided through process interruption.
(5)
Inactive -
2025-26 (T-1),
2024-25 (T-1),
2023-24 (T-1)
(and 5 more)
-
• Industrial Gases production processes. DSR delivered through process interruption
(4)
-
• Industrial Gases production site. DSR provided through process interruption.
Inactive -
2025-26 (T-1),
2024-25 (T-1),
2023-24 (T-1)
(and 5 more)
-
• Industrial Gases production processes. DSR delivered through process interruption
(4)
-
• Industrial Gases production site. DSR provided through process interruption.
Inactive -
2025-26 (T-1),
2024-25 (T-1),
2023-24 (T-1)
(and 5 more)
Generators on hospital site
(5)
Inactive -
2024-25 (T-1),
2023-24 (T-4),
2023-24 (T-1)
(and 7 more)
Hanson 2 - DSR Turn Down/ Load Reduction
(5)
Inactive -
2024-25 (T-1),
2023-24 (T-4),
2022-23 (T-4)
(and 6 more)
Aggregated Generation - Diesel
(5)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 7 more)
Generators at hospital site
(5)
Inactive -
2024-25 (T-1),
2023-24 (T-4),
2023-24 (T-1)
(and 7 more)
Furnaces
(5)
Inactive -
2024-25 (T-1),
2023-24 (T-4),
2023-24 (T-1)
(and 7 more)
Component has yet to be procured.
(5)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 5 more)
-
• Office site with behind the meter generation
(3)
-
• Office site with behind the meter back up generation
-
• Office site with behind the meter generation.
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 7 more)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 3 more)
Materials recycling plant.
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 4 more)
Standby generation, submetered, taking site load
(5)
Inactive -
2023-24 (T-1),
2022-23 (T-4),
2021-22 (T-4)
(and 4 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(4)
Inactive -
2023-24 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 1 more)
Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 3 more)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 1 more)
Peak power plant
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 4 more)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 1 more)
Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 1 more)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 1 more)
Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 6 more)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 3 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(4)
Inactive -
2023-24 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 1 more)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 3 more)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 1 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(4)
Inactive -
2023-24 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 1 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(4)
Inactive -
2023-24 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 1 more)
Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 7 more)
Chemical manufacturer
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 4 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(4)
Inactive -
2023-24 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 1 more)
Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 1 more)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 1 more)
Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 1 more)
-
• 4MW of DSR
(3)
-
• 1 x 800kW/1100KWh Lithium Ion Battery
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
(and 1 more)
Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 4 more)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 1 more)