Load reduction
(5)
Inactive -
2022-23 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 3 more)
Load reduction
(5)
Inactive -
2022-23 (T-3),
2021-22 (T-4),
2020-21 (T-4)
(and 2 more)
Load reduction
(5)
Inactive -
2022-23 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 3 more)
-
• Load reduction.
(3)
-
• Load reduction
(2)
Inactive -
2022-23 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 3 more)
-
• Load reduction
(3)
-
• Load shedding
(2)
Inactive -
2022-23 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 3 more)
Standby generation, submetered, taking site load
(5)
Inactive -
2023-24 (T-1),
2022-23 (T-4),
2021-22 (T-4)
(and 4 more)
-
• DSR Component providing load turn down at a retail store
(3)
-
• Import/Export metering with diesel generation at a retail store
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 4 more)
Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 6 more)
-
• Standby diesel generator that reduces site load when generating.
(2)
-
• Standby generation
(2)
-
• Standby generation from a POSGU.
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 2 more)
Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 7 more)
TBD
(21 components)
Load reduction upon instruction
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 5 more)
Behind the Meter Generation
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 5 more)
-
• BtM storage providing standby capacity
(2)
-
• BtM storage/standby generation; non exporting
(2)
-
• BtM storage as standby generation, non-exporting
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 3 more)
-
• DSR Component providing load turn down at a retail store
(3)
-
• Import/Export metering with diesel generation at a retail store
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 4 more)
-
• Peak power plant
(4)
-
• Reciprocating engine
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 6 more)
Paper mill industrial site
(5)
Inactive -
2023-24 (T-4),
2023-24 (T-1),
2022-23 (T-4)
(and 6 more)
-
• Peak power plant
(4)
-
• Gas reciprocating engine
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 6 more)
Load reduction on site supported by non-exporting standby generation.
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
Load reduction on site supported by non-exporting standby generation.
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
-
• Load curtailment and standby generation
(2)
-
• Load curtailment via standby generation
(2)
-
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
-
• Load curtailment & standby generation
(2)
-
• Load reduction via on-site standby generation taking site load
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
Load reduction and generation via standby assets
(4)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
Load reduction on site supported by non-exporting standby generation.
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
-
• Load curtailment on site via standby generation
(2)
-
• Standby generation supporting load curtailment
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
Load reduction on site supported by non-exporting standby generation.
(4)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
-
• DSR component providing load turn down at a retail store
(2)
-
• Import/Export metering with diesel generation at a retail store
(2)
-
• DSR Component providing load turn down at a retail store
Inactive -
2022-23 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 4 more)
Load reduction on site supported by non-exporting standby generation.
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
Load reduction on site supported by non-exporting standby generation.
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
Mix of load reduction and standby generation
(4)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
Load reduction on site supported by non-exporting standby generation.
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
(5)
Inactive -
2022-23 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 5 more)
-
• Load curtailment on site and standby generation
(2)
-
• Load reduction on site via standby generation
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
Load reduction on site supported by non-exporting standby generation.
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
-
• Standby generation
(2)
-
• Standby generation sub-metered taking site load
(2)
-
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
-
• Load curtailment and standby generation
(2)
-
• Load curtailment at site via standby generation
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
-
• Standby generation DRUPs taking site load. No export
(2)
-
• Standby generation DRUPS taking site load, non-exporting
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
-
• Load curtailment
(2)
-
• Load reduction
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
Load reduction on site supported by non-exporting standby generation.
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
Load reduction on site supported by non-exporting standby generation.
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
-
• Sixteen POSGUs (standby diesel generators).
(2)
-
• Multiple POSGUs (standby diesel generators).
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
Load reduction on flexible electricity consuming processes
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
Load reduction on site supported by non-exporting standby generation.
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
Load reduction on site supported by non-exporting standby generation.
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
-
• Standby generation taking site load
(2)
-
• Standby generation x 2
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
-
• Load curtailment via standby generation exporting excess
(2)
-
• Load reduction on-site and standby generation
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
-
• Load curtailment and standby generation
(2)
-
• Mix of load curtailment and standby generation
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
Combination of load curtailment and standby generation
(4)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
-
• Load curtailment and standby generation
(2)
-
• Load reduction via standby generation taking onsite load
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
Load reduction on site supported by non-exporting standby generation.
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)
Load reduction on site supported by non-exporting standby generation.
(3)
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2017-18 (T-1)