On-site existing CHP generating unit
(5)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 6 more)
Syngenta - CHP unit
Active -
2024-25 (T-1)
-
• One of six CHP units at University of Warwick, Coventry, CV4 7AL
(3)
-
• One of six CHP units at University of Warwick, Coventry, CV4 7AL.
(2)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 4 more)
-
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
(3)
-
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
(2)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 7 more)
CHP unit
Active -
2024-25 (T-4)
gas-fired CHP unit
(5)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-4)
(and 7 more)
-
• 2.8MWe back pressure steam turbine
(3)
-
• 6.46 MWe Ruston Tornado Gas Turbine (Siemens SG200)
(2)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-4)
(and 7 more)
-
• 1 x 2MW CHP generator; natural gas reciprocating engine; primary fuel type = natural gas
(2)
-
• CHP in a district heating environment, providing heat & electricity to local area and exporting excess.
(2)
-
• 1x2MW CHP generator: natural gas reciprocating engine. Primary fuel type = natural gas
Inactive -
2020-21 (T-4),
2019-20 (T-1),
2018-19 (T-1)
(and 1 more)
6MW Gas Turbine
(2)
Inactive -
2021-22 (T-1),
2020-21 (T-1)
CHP Unit
(2)
Inactive -
2024-25 (T-1),
2023-24 (T-4)
2No 1.2MW gas CHP providing power, heat and CO2 in a horticultural environment
(2)
Inactive -
2024-25 (T-4),
2023-24 (T-4)
Gas engine
(2)
Inactive -
2024-25 (T-4),
2023-24 (T-4)
Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the …
(5)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 4 more)
CHP engines to be installed at existing site at LADYSMITH ROAD, GRIMSBY, DN32 9EE
(2)
Inactive -
2025-26 (T-4),
2022-23 (T-1)
CHP unit
Active -
2024-25 (T-4)
CHP engines to be installed at HUMBERSTONE ROAD, GRIMSBY, DN32 8HW
(2)
Inactive -
2025-26 (T-4),
2022-23 (T-1)
On-site existing CHP generating unit
(5)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 7 more)
CHP engines to be installed at: HALEWOOD PLANT, SPEKE BOULEVARD, LIVERPOOL, L24 9LE
(2)
Inactive -
2025-26 (T-4),
2022-23 (T-1)
On-site existing CHP generating unit
(5)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 6 more)
Gas Engine
Active -
2024-25 (T-4)
-
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(8)
-
• Gas fired CHP unit
(4)
-
• CHP Unit
-
• ... and 1 more unique descriptions
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 8 more)
3No 1.2MW gas CHP providing power, heat and CO2 in a horticultural environment
(2)
Inactive -
2024-25 (T-4),
2023-24 (T-4)
VIT42A - CHP unit at Energy Centre, Northwick Park Hospital, Watford Road, London, HA1 3UJ
Active -
2025-26 (T-4)
On-site Generating CMU.
Active -
2024-25 (T-1)
New CHP engine to be installed at 4 FULLARTON DRIVE, GLASGOW EAST INVESTMENT PARK, GLASGOW, G32 8FA
(2)
Inactive -
2025-26 (T-4),
2022-23 (T-1)
CHP unit
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
CHP unit
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
-
• CHP
(2)
-
• Gas Fired - CHP
(2)
Inactive -
2024-25 (T-1),
2023-24 (T-4),
2019-20 (T-1)
(and 1 more)
-
• A gas turbine generating unit, part of a CHP which supplies heat & power to a paper mill
(3)
-
• A steam turbine generating unit, part of a CHP which supplies heat & power to a paper mill
(2)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-1)
(and 4 more)
-
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to …
(3)
-
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to …
(2)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 4 more)
On-site existing CHP generating unit
(5)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 7 more)
-
• Gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh …
(2)
-
• The component consists of gas CHP (2679kW and 2004kW) servicing the electricity and heat requirements for Aldergrove Nursery, one of …
(2)
-
• The component consists of gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites …
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 7 more)
CHP at a water treatment works in Glasgow.
(3)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2022-23 (T-1)
Gas fired CHP unit
(4)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
CHPs at Queen Elizabeth Hospital
(4)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
The CMU component will have a connection capacity of 6MW. Gas-fired reciprocating engine will be the technology used
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2023-24 (T-1)
(and 2 more)
-
• Gas-fired reciprocating engines fitted with heat and CO2 recovery equipment, plus transformers, switchgear and associated controls with a total connection …
(3)
-
• Gas-fired reciprocating engines fitted with heat and CO2 recovery equipment, plus transformers, switch gear and associated controls with a total …
-
• Gas-fired reciprocating engines fitted with heat and CO2 recovery equipment, plus transformers, switch gear and associated controls with a total …
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2020-21 (T-4)
-
• CHP unit
(4)
-
• Gas fired CHP unit
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-1)
(and 4 more)
-
• CHP Unit 850kWe proposed to be installed in Hall 6-8 at NEC site
(2)
-
• Gas Generation units at 1013kWe
-
• Proposed CHP Unit 850kWe to be installed in Hall 6-8 at NEC site
-
• ... and 1 more unique descriptions
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-3)
(and 1 more)
1.6MW Combined Heat and Power Plant at Birmingham Children Hospital
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2020-21 (T-4)
(and 1 more)
Gas fired CHP
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 7 more)
The component consists of gas CHP 3355kW servicing the electricity and heat requirements for Melrow Nursery, one of the horticultural sites which trades at Flavourfresh Salads. The generation unit capacity …
(5)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 7 more)
CHP
(5)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 4 more)
0.725MW Combined Heat and Power Plant Royal South Hants Hospital
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 7 more)
A gas engine CHP site providing steam and electricity to an industrial unit
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 4 more)
-
• A Packaged 3.976MW, 11kV natural gas fired reciprocating engine CHP
(4)
-
• A Packaged 3.976MW, 11kV CHP
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 4 more)
CHP and autogeneration
(5)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 5 more)
CHP unit
(4)
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
On-site existing CHP generating unit
(5)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-3)
(and 4 more)