-
• Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
-
• Grain B CCGT Unit 7 Grain B power station provides heat to the Grain LNG regasification facility.
-
• Grain B CCGT Unit 8. Grain B power station provides heat to the Grain LNG regasification facility.
-
• ... and 2 more unique descriptions
4000.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• Gas CHP on South bank of river Humber providing electricity and industrial steam
(8)
-
• New build gas reciprocating multi-engine generating plant
(4)
-
• Battery storage unit
3439.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• Unit 1 at Saltend Power Station
(2)
-
• Unit 2 at Saltend Power Station
(2)
-
• Unit 3 at Saltend Power Station
3107.9 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at …
(5)
-
• Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at …
-
• Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at …
-
• ... and 1 more unique descriptions
379.8 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 5 more)
-
• TG1B is part of the aggregated CMU EMD-19, which is made up of 2 Generating Units of which TG1B is …
(6)
-
• Unit 3 is part of the aggregated CMU EMD-19, which is made up of 2 Generating Units of which Unit …
(6)
-
• TG1B is part of the aggregated CMU EMD-18, which is made up of 2 Generating Units of which TG1B is …
(2)
-
• ... and 7 more unique descriptions
300.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 9 more)
-
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). Unit is a OCGT …
(4)
-
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S24G01 is a OCGT …
184.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
The CMU is a gas fired CCGT CHP
(5)
166.1 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
The CMU is a gas fired CCGT CHP
(5)
126.0 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383
(5)
122.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor.
(3)
-
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
-
• Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator …
119.6 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S26G02 is a OCGT in CHP …
(3)
-
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S24G02 is a OCGT in CHP …
(2)
116.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• Siemens SGT200 based CHP
(13)
-
• Solar T70 Based CHP System
(13)
-
• Solar T70 based CHP system
(13)
61.6 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 11 more)
-
• The CMU comprises one Gas Turbine generator, one HRSG boiler, one Back Pressure Steam Turbine generator and associated anciliary plant …
-
• The CMU comprises one Gas Turbine generator, one HRSG boiler, one Back Pressure Steam Turbine generator and associated ancillary plant …
42.5 MW
Inactive -
2028-29 (T-4),
2021-22 (T-4)
The CMU Component will have a connection capacity of 15MW. Gas-fired reciprocating engine will be the technology used.
(5)
41.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
On-site Generating CMU.
(3)
28.4 MW
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
RB211 Gas Turbine based CHP
27.4 MW
Active -
2028-29 (T-4)
-
• Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
(10)
-
• Gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
(2)
-
• One 22.9MVA gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural …
(2)
26.7 MW
Inactive -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 11 more)
-
• This is an existing CHP
(4)
-
• This is a long standing existing CHP unit located on land within a manufacturing site.
21.8 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
A site with two gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network.
(5)
21.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(3)
-
• existing CHP on site
(2)
21.0 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Siemens SGT200 Based CHP
(5)
19.6 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• a Combined Heat and Power Plant
(3)
-
• A Distribution Connected 4.5MW gas fueled generating station
(2)
19.5 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
(and 1 more)
The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
(5)
18.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
New-Build CHP Generating Unit at Seoint Quarry, Caernarfon.
18.2 MW
Active -
2028-29 (T-4)
Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 …
(5)
16.6 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 7 more)
-
• One of three CHP in a horticultural environment
(8)
-
• One of three CHP in a horticultural environment.
(8)
13.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 6 more)
-
• A gas fuelled CHP plant
(4)
-
• A gas fuelled Combined Heat and Power plant
(4)
12.8 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 1 more)
-
• 2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW
(2)
-
• 2X gas reciprocating engines with a total gross power capacity of 3.973 MW
(2)
-
• 2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW and a net power capacity of 3.953 …
10.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
(and 6 more)
Combined Heat and Power District Heating Plant at Battersea Power Station is made up of 2 CHPs totalling 4MW. The generator sizes have been inserted pro rata to achieve the …
(4)
10.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
(and 1 more)
-
• 2MW gas CHP engine in a horticultural environment
(2)
-
• One 2MW gas CHP engine in a horticultural environment
(2)
-
• One 1.5 MW gas CHP engine in a horticultural environment
10.0 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Callington - Existing Site CHP unit
(5)
9.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• One Jenbacher CHP engine with a generation capacity of 3.36 MW
(10)
-
• The new Energy Centre will consist of one Jenbacher CHP engine with a generation capacity of 3.36 MW and a …
9.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 9 more)
-
• CHP at a horticultural environment.
(2)
-
• Gas CHP engines in commercial horticultural environment with no auxilliary load
(2)
-
• CHP at horticultural site
9.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• The CMU Component will have a connection capacity of 3.376MW. Gas-fired reciprocating engine will be the technology used.
(3)
-
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be …
(2)
9.2 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
A gas fuelled Combined heat and Power plant
(4)
9.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 1 more)
Gas CHP in a horticultural environment providing heat & electricity to site and exporting excess.
(9)
8.7 MW
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 8 more)
On-Site Generating CMU
(3)
8.4 MW
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
On-Site Generating CMU
(3)
8.2 MW
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
-
• Combined Heat and Power Plant, University of Leicester, capacity of generator 1.600MW
(3)
-
• Combined Heat and Power Plant, University of Leicester, generator's capacity 1.600MW
(2)
8.2 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 7 more)
-
• 1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and …
(3)
-
• 2MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and …
(2)
7.9 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 7 more)
Combined Heat and Power Plant Olympic Park London
(12)
7.8 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 12 more)
On-Site Generating CMU
(3)
7.5 MW
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
-
• 1.2 MW Combined Heat and Power Engine.
(6)
-
• 1.6 MW Combined Heat and Power Engine
(6)
-
• 1.6MW Combined Heat and Power Engine
(4)
-
• ... and 1 more unique descriptions
7.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 8 more)
2x reciprocating gas engines with an aggregate gross capacity of 3.996 MW and net capacity of 3.908 MW
(2)
7.1 MW
Active -
2028-29 (T-4),
2025-26 (T-1)
-
• Four CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for …
(6)
-
• Three CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for …
(2)
-
• Three engines of 2.65MW each all CHP engine in a horticultural environment, exporting excess generation to distribution network. Primary fuel …
(2)
6.4 MW
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 8 more)
Two CHP gas engines in commercial horticultural environment with no auxilliary load
(6)
6.0 MW
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 4 more)
CHP engine in a horticultural environment, natural gas, no aux load
(9)
5.8 MW
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 8 more)
-
• CHP engine in horticultural environment with no auxilliary load
(3)
-
• Two CHP engines in horticultural environment with no auxilliary load
(2)
5.8 MW
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 4 more)
On-site Generating CMU.
(2)
5.6 MW
Active -
2028-29 (T-4),
2025-26 (T-1)
Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
(5)
5.6 MW
Inactive -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)