Search Map View Statistics Support Us Help Login Register

Combined Heat and Power (CHP)

102 unique locations 992 components 0 companies Page 1 of 3
Power Station Road Isle of Grain Rochester ME3 0AR (55 components)
  • • Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
  • • Grain B CCGT Unit 7 Grain B power station provides heat to the Grain LNG regasification facility.
  • • Grain B CCGT Unit 8. Grain B power station provides heat to the Grain LNG regasification facility.
  • • ... and 2 more unique descriptions
UNIPER UK LIMITED CHP and autogeneration Combined Heat and Power (CHP) Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines (Fuel Type - Diesel)
4000.3 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Rosper Road Immingham North Lincolnshire DN40 3DZ (16 components)
  • • Gas CHP on South bank of river Humber providing electricity and industrial steam (8)
  • • New build gas reciprocating multi-engine generating plant (4)
  • • Battery storage unit
VPI Immingham LLP Reciprocating engines Storage (Duration 2h) CHP and autogeneration Combined Heat and Power (CHP)
3439.5 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Saltend Power Station Saltend Hull HU12 8GA (33 components)
  • • Unit 1 at Saltend Power Station (2)
  • • Unit 2 at Saltend Power Station (2)
  • • Unit 3 at Saltend Power Station
SALTEND COGENERATION COMPANY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
3107.9 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom (9 components)
  • • Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at … (5)
  • • Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at …
  • • Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at …
  • • ... and 1 more unique descriptions
ESSO PETROLEUM COMPANY,LIMITED Combined Heat and Power (CHP)
379.8 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 5 more)
Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom (29 components)
  • • TG1B is part of the aggregated CMU EMD-19, which is made up of 2 Generating Units of which TG1B is … (6)
  • • Unit 3 is part of the aggregated CMU EMD-19, which is made up of 2 Generating Units of which Unit … (6)
  • • TG1B is part of the aggregated CMU EMD-18, which is made up of 2 Generating Units of which TG1B is … (2)
  • • ... and 7 more unique descriptions
ESSO PETROLEUM COMPANY,LIMITED Combined Heat and Power (CHP)
300.5 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 9 more)
Bo'ness Road Grangemouth Stirlingshire FK3 9XQ (12 components)

CHP Plant connected to Private Wire System (operated by INEOS Infrastructure (Grangemouth) Limited) with Connection to NETS (5)

GRANGEMOUTH CHP LIMITED CHP and autogeneration Combined Heat and Power (CHP)
259.8 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 7 more)
Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS (21 components)
  • • (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). Unit is a OCGT … (4)
  • • (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S24G01 is a OCGT …
Sembcorp Utilities (UK) Limited CHP and autogeneration Combined Heat and Power (CHP)
184.4 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Bury St Edmunds Sugar Factory British Sugar plc Hollow Road Bury St Edmunds IP32 7BB (12 components)

The CMU is a gas fired CCGT CHP (5)

BRITISH SUGAR PLC CHP and autogeneration Combined Heat and Power (CHP)
166.1 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Wissington Sugar Factory British Sugar plc College Road Wissington King's Lynn PE33 9QG (16 components)

The CMU is a gas fired CCGT CHP (5)

BRITISH SUGAR PLC CHP and autogeneration Combined Heat and Power (CHP)
126.0 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Maesgwyn Farm, Chirk, Wrexham, LL14 5NT (14 components)

On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383 (5)

GRIDBEYOND LIMITED Combined Heat and Power (CHP)
122.3 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (31 components)
  • • Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor. (3)
  • • Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
  • • Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator …
WINNINGTON CHP LIMITED CHP and autogeneration Combined Heat and Power (CHP) Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines (Fuel Type - Gas)
119.6 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Sembcorp UK Headquarters Wilton International Middlesbrough TS90 8WS United Kingdom (12 components)
  • • CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S26G02 is a OCGT in CHP … (3)
  • • CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S24G02 is a OCGT in CHP … (2)
Sembcorp Utilities (UK) Limited CHP and autogeneration Combined Heat and Power (CHP)
116.4 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Cargill PLC, Trafford Park, Manchester, M17 1PA (48 components)
  • • Siemens SGT200 based CHP (13)
  • • Solar T70 Based CHP System (13)
  • • Solar T70 based CHP system (13)
CARGILL PLC CHP and autogeneration Combined Heat and Power (CHP)
61.6 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 11 more)
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, England, DN16 1XA. (12 components)
  • • existing on site CHP (3)
  • • existing onsite CHP (2)
GRIDBEYOND LIMITED Combined Heat and Power (CHP)
46.2 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 3 more)
Europa Energy Centre, Hills Court Road, Ash, Kent, CT3 2AP (19 components)

The CMU Component will have a connection capacity of 15MW. Gas-fired reciprocating engine will be the technology used. (5)

P3P BREHON LIMITED Reciprocating engines CHP and autogeneration Combined Heat and Power (CHP)
41.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, England, DN16 1XA (12 components)
  • • existing CHP on site. (3)
  • • existing on site CHP (2)
GRIDBEYOND LIMITED Combined Heat and Power (CHP)
28.4 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 3 more)
Newton Aycliffe CO Durham DL5 6EA (30 components)
  • • This is an existing CHP (4)
  • • This is a long standing existing CHP unit located on land within a manufacturing site.
INOVYN CHLORVINYLS LIMITED CHP and autogeneration Combined Heat and Power (CHP)
21.8 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
47-53 Charterhouse Street, London, EC1M 6PB (17 components)

A site with two gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network. (5)

CITIGEN (LONDON) LIMITED CHP and autogeneration Combined Heat and Power (CHP)
21.5 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, DN16 1XA (21 components)
  • • Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)
  • • existing CHP on site (2)
GRIDBEYOND LIMITED DSR Combined Heat and Power (CHP)
21.0 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Cargill PLC, Trafford Park, M17 1PA (16 components)

Siemens SGT200 Based CHP (5)

CARGILL PLC CHP and autogeneration Combined Heat and Power (CHP)
19.6 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Ellifoot Lane, Burstwick, HU12 9EB (5 components)
  • • a Combined Heat and Power Plant (3)
  • • A Distribution Connected 4.5MW gas fueled generating station (2)
SUNCROP GENERATION LIMITED Reciprocating engines Combined Heat and Power (CHP)
19.5 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-1) (and 1 more)
Mill Nurseries, Ottringham Road, Keyingham, Hull, HU12 9RX (8 components)

Gas fired CHP unit (5)

KIWI POWER LTD Combined Heat and Power (CHP)
19.5 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 3 more)
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (21 components)

The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year. (5)

SPARK STEAM LIMITED Reciprocating engines CHP and autogeneration Combined Heat and Power (CHP)
18.4 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
WEPA Bridgend Paper Mill, Llangynwyd, Mid Glamorgan, South Wales CF34 9RS (6 components)

Existing Generation on existing site - CHP (5)

GRIDBEYOND LIMITED Combined Heat and Power (CHP)
18.2 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 3 more)
100 Montifichet Road, Westfield, Stratford E20 1GR (36 components)

Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 … (5)

EAST LONDON ENERGY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
16.6 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 7 more)
SOUTH STAFFORDSHIRE WATER PLC, Hampton Loade Treatment Works, Hampton Loade, Bridgnorth, WV15 6HD (11 components)

Existing Generation on existing site - CHP (5)

GRIDBEYOND LIMITED Combined Heat and Power (CHP)
14.8 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 4 more)
Winnington CHP Winnington Lane Winnington Northwich Cheshire (1 components)

Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.

WINNINGTON CHP LIMITED Combined Heat and Power (CHP)
14.2 MW
Active - 2027-28 (T-4)
Rotherdale Farm, Long Lane, Throckmorton, Worcestershire, United Kingdom, WR10 2JH (27 components)
  • • One of three CHP in a horticultural environment (8)
  • • One of three CHP in a horticultural environment. (8)
FLEXITRICITY LIMITED Combined Heat and Power (CHP)
13.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 6 more)
Cowie Sterling FK7 7BQ (9 components)

14.710 MW CHP generation (5)

LIMEJUMP LTD Combined Heat and Power (CHP)
13.4 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 6 more)
High Street, Waterham, nr Faversham, Kent ME13 9EJ (10 components)
  • • 6 CHP engines horticultural environment with no auxiliiary load (4)
  • • Two of six CHP engines horticultural environment with no auxiliiary load
FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
13.4 MW
Inactive - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 6 more)
Marsh Road, Far Banks, North Meols, Banks, West Lancashire, Lancashire, PR9 8DX (8 components)
  • • A gas fuelled CHP plant (4)
  • • A gas fuelled Combined Heat and Power plant (4)
EFFICIENT GENERATION LIMITED Combined Heat and Power (CHP)
12.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 1 more)
Southampton General Hospital Tremona Road, Southampton, SO16 6YD (9 components)
  • • 2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW (2)
  • • 2X gas reciprocating engines with a total gross power capacity of 3.973 MW (2)
  • • 2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW and a net power capacity of 3.953 …
VEOLIA UK LIMITED CHP and autogeneration Combined Heat and Power (CHP)
10.4 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-1) (and 6 more)
BATTERSEA POWER STATION BATTERSEA POWER STATION LONDON LONDON SW11 8AH (8 components)

Combined Heat and Power District Heating Plant at Battersea Power Station is made up of 2 CHPs totalling 4MW. The generator sizes have been inserted pro rata to achieve the … (4)

LIMEJUMP LTD Combined Heat and Power (CHP)
10.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-1) (and 1 more)
Wood End, Stocks Lane, Over Peover, Knutsford WA16 9EZ (16 components)
  • • 2MW gas CHP engine in a horticultural environment (2)
  • • One 2MW gas CHP engine in a horticultural environment (2)
  • • One 1.5 MW gas CHP engine in a horticultural environment
FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
10.0 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Hill Barton Business ParkBlackmore Rd, Exeter EX5 1BA (3 components)
  • • energy from waste unit
  • • generating gas unit
GRIDBEYOND LIMITED Energy from Waste Combined Heat and Power (CHP)
9.9 MW
Active - 2027-28 (T-4)
Samworth Brothers, 81-83 Tavistock Road, Callington, Cornwall, PL17 7TA (11 components)

Callington - Existing Site CHP unit (5)

GRIDBEYOND LIMITED Combined Heat and Power (CHP)
9.5 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
APS Growers Ltd / Branfield Nursery 111 Stockbridge Road Elloughton HU15 1HW (14 components)
  • • One Jenbacher CHP engine with a generation capacity of 3.36 MW (10)
  • • The new Energy Centre will consist of one Jenbacher CHP engine with a generation capacity of 3.36 MW and a …
GLASS LEAF POWER LIMITED Reciprocating engines Combined Heat and Power (CHP)
9.3 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 9 more)
Nr 125 Park Lane Cottingham East Yorkshire HU16 5RX (17 components)
  • • CHP at a horticultural environment. (2)
  • • Gas CHP engines in commercial horticultural environment with no auxilliary load (2)
  • • CHP at horticultural site
FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
9.3 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (12 components)
  • • The CMU Component will have a connection capacity of 3.376MW. Gas-fired reciprocating engine will be the technology used. (3)
  • • The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be … (2)
P3P ENERGY MANAGEMENT AE LIMITED Reciprocating engines CHP and autogeneration Combined Heat and Power (CHP)
9.2 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Rydings lane, North Meols, West Lancashire, Lancashire, PR9 8EB (4 components)

A gas fuelled Combined heat and Power plant (4)

SECURE GENERATION LIMITED Combined Heat and Power (CHP)
9.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 1 more)
2 Engineers Way, Wembley, Middlesex, HA9 0JS (6 components)

Energy Centre with 2 x1.5MW gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations. (5)

FLEXITRICITY LIMITED Combined Heat and Power (CHP)
8.4 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-1) (and 3 more)
Shottentons Farm, Pecks Hill, Nazeing, Essex, EN9 2NY (9 components)

Gas fuelled CHP generation plant (5)

NORTHERN INDUSTRIAL GENERATION LIMITED Combined Heat and Power (CHP) Open Cycle Gas Turbine (OCGT)
8.2 MW
Inactive - 2027-28 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 4 more)
Fielding & Johnson Building University Of Leicester University Road LEICESTER Leicestershire LE1 7RH (28 components)
  • • Combined Heat and Power Plant, University of Leicester, capacity of generator 1.600MW (3)
  • • Combined Heat and Power Plant, University of Leicester, generator's capacity 1.600MW (2)
LEICESTER DISTRICT ENERGY COMPANY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
8.2 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 7 more)
QMC Campus, Nottingham University Hospitals, Queens Medical Centre, Derby Road, Nottingham, NG7 2UH (10 components)

A site with one gas turbine CHP, providing steam and electricity to Queens Medical Centre in Nottingham (5)

E.ON UK PLC CHP and autogeneration Combined Heat and Power (CHP)
8.1 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 7 more)
Pond Street London NW3 2QG (9 components)

On-site CHP - existing generating unit Pond Street London OS Grid Reference: TQ 272 854 NW3 2QG (5)

GRIDBEYOND LIMITED Combined Heat and Power (CHP)
8.1 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 6 more)
Aston University, Aston Triangle, Birmingham, West Midlands, B4 7ET (30 components)
  • • 1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and … (3)
  • • 2MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and … (2)
BIRMINGHAM DISTRICT ENERGY COMPANY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
7.9 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 7 more)
Kings Yard Energy Centre, Carpenters Lane, Stratford, London E15 2DU (18 components)

Combined Heat and Power Plant Olympic Park London (12)

EAST LONDON ENERGY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
7.8 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 12 more)
Smurfit Kappa SSK, Mount Street, Nechells, Birmingham B7 5RE (11 components)
  • • 8.300MW Gas Turbine installation (3)
  • • 8.3MW Gas Turbine installation (2)
LIMEJUMP LTD CHP and autogeneration Combined Heat and Power (CHP)
7.6 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 7 more)
Excel Energy Centre Warehouse R Royal Victoria Dock Northside London E16 1BA (25 components)
  • • 1.2 MW Combined Heat and Power Engine. (6)
  • • 1.6 MW Combined Heat and Power Engine (6)
  • • 1.6MW Combined Heat and Power Engine (4)
  • • ... and 1 more unique descriptions
EXCEL DISTRICT ENERGY COMPANY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
7.4 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 8 more)
Stainland Boardmill, Holywell Green, Halifax, HX4 9PY (3 components)

Gas Fired CHP (3)

E.ON UK PLC Combined Heat and Power (CHP)
5.9 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2023-24 (T-1)
Showing locations 1 - 50 of 102