-
• A Packaged 3.976MW, 11kV natural gas fired reciprocating engine CHP
(4)
-
• A Packaged 3.976MW, 11kV CHP
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 4 more)
VIT43A - CHP unit at The Christie Hospital, Wilmslow Road, Manchester, M20 4BX
Active -
2025-26 (T-4)
CHP engines to be installed at existing site at LADYSMITH ROAD, GRIMSBY, DN32 9EE
(2)
Inactive -
2025-26 (T-4),
2022-23 (T-1)
CHP engines to be installed at HUMBERSTONE ROAD, GRIMSBY, DN32 8HW
(2)
Inactive -
2025-26 (T-4),
2022-23 (T-1)
CHP engines to be installed at: HALEWOOD PLANT, SPEKE BOULEVARD, LIVERPOOL, L24 9LE
(2)
Inactive -
2025-26 (T-4),
2022-23 (T-1)
VIT42A - CHP unit at Energy Centre, Northwick Park Hospital, Watford Road, London, HA1 3UJ
Active -
2025-26 (T-4)
New CHP engine to be installed at 4 FULLARTON DRIVE, GLASGOW EAST INVESTMENT PARK, GLASGOW, G32 8FA
(2)
Inactive -
2025-26 (T-4),
2022-23 (T-1)
CHP at a water treatment works in Glasgow.
(3)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2022-23 (T-1)
0.725MW Combined Heat and Power Plant Royal South Hants Hospital
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 7 more)
1.6MW Combined Heat and Power Plant at Birmingham Children Hospital
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2020-21 (T-4)
(and 1 more)
Gas fired CHP
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 7 more)
Two gas CHP in a horticultural environment with no aux load
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 6 more)
-
• A gas turbine generating unit, part of a CHP which supplies heat & power to a paper mill
(3)
-
• A steam turbine generating unit, part of a CHP which supplies heat & power to a paper mill
(2)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-1)
(and 4 more)
A gas engine CHP site providing steam and electricity to an industrial unit
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 4 more)
-
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(8)
-
• Gas fired CHP unit
(4)
-
• CHP Unit
-
• ... and 1 more unique descriptions
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 8 more)
A gas engine CHP site providing hot water to a local district heating network
(8)
0.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
A gas engine CHP site providing hot water to a local district heating network
(5)
0.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
A gas engine CHP site providing hot water to a local district heating network
(5)
0.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
A gas engine CHP site providing hot water to a local district heating network
(5)
0.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
A gas engine CHP site providing hot water to a local district heating network
(8)
0.8 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
-
• A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV …
(5)
-
• A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV …
(3)
0.8 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 5 more)
A gas engine CHP site providing hot water to a local district heating network
(8)
0.8 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
E1000 CHP unit
(5)
0.9 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 3 more)
E1000 CHP
(5)
0.9 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 3 more)
EnerG 1000 CHP
(5)
0.9 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 3 more)
MTU - 8V400064 1.013MW
(5)
0.9 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2022-23 (T-1)
(and 2 more)
EnerG 1000 CHP
(5)
0.9 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 3 more)
1 MW CHP generation
(5)
0.9 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 4 more)
-
• Two gas CHP engines in commercial horticultural environment with no auxilliary load
(4)
-
• Gas CHP engines in commercial horticultural environment with no auxilliary load
1.0 MW
Inactive -
2027-28 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 4 more)
A gas engine CHP site providing hot water to a local district heating network, as well as providing some power direct via private wire to a local hotel
(8)
1.1 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
1280 KWe Combined Heat and Power unit.
(5)
1.1 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 4 more)
1.280MW CHP
(5)
1.2 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 2 more)
-
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific …
(6)
-
• Gas CHP engines 1.37MW and 1.50MW. Primary fuel type = Natural Gas
(2)
1.3 MW
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 8 more)
A gas engine CHP site providing hot water to a local district heating network
(5)
1.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
A gas engine CHP site providing hot water to a local district heating network
(5)
1.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
A gas engine CHP site providing hot water to an industrial unit
(5)
1.6 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 5 more)
-
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 18042602
(3)
-
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 081171171
(2)
1.6 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 7 more)
2026 kW CHP unit
(5)
1.8 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 3 more)
On-site CHP - existing generating unit The Ridgeway Enfield, Middlesex EN2 8JL OS Grid Reference: TQ 312 980
(5)
2.0 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 6 more)
One asset 1.13MW CHP engine in a horticultural environment with no auxiliary load.
(5)
2.1 MW
Inactive -
2027-28 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 7 more)
-
• District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas. All generation …
(10)
-
• District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas
(2)
2.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 10 more)
District heating implementation with one asset 1MW and no auxiliary load
(5)
2.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
(5)
2.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
One asset 1.5MW CHP engine in a horticultural environment with no auxiliary load.
(5)
2.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
One CHP engine in a horticultural environment with no auxilliary load.
(5)
3.0 MW
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 5 more)
-
• Gas fired CHP unit
(3)
-
• Gas CHP in St. Austell
(2)
3.1 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 6 more)
3.350 MW gas engine CHP plant
(5)
3.1 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 6 more)
-
• Gas CHP
(3)
-
• Gas CHP in St. Austell
(2)
3.4 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 6 more)
-
• 1 x Gas reciprocating engine with a total rated gross power capacity of 2.000 MW and total net power capacity …
(2)
-
• 1 x Gas reciprocating engine with a total rated gross power capacity of 2.000 MW and total net power capacity …
-
• 1 x Gas reciprocating engine with a total rated gross power capacity of 2.185 MW and total net power capacity …
-
• ... and 1 more unique descriptions
3.4 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 7 more)
Nantwich Existing Site CHP
(8)
3.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)