-
• TG1B is part of the aggregated CMU EMD-19, which is made up of 2 Generating Units of which TG1B is …
(6)
-
• Unit 3 is part of the aggregated CMU EMD-19, which is made up of 2 Generating Units of which Unit …
(6)
-
• TG1B is part of the aggregated CMU EMD-18, which is made up of 2 Generating Units of which TG1B is …
(2)
-
• ... and 7 more unique descriptions
300.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 9 more)
On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383
(5)
122.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Gas Engine
(4)
39.6 MW
Inactive -
2025-26 (T-1),
2024-25 (T-4),
2024-25 (T-1)
(and 2 more)
-
• On-Site Generating CMU.
(2)
-
• On-Site Generating Steam Turbine, utilising heat recovery waste as a 'fuel input' and generating electricity w/o fossil fuel emissions.
(2)
-
• On-Site Generating Steam Turbine, utilising high pressure steam waste from on-site refinery processes as a 'fuel input' and generating electricity …
38.0 MW
Active -
2025-26 (T-1),
2024-25 (T-4),
2024-25 (T-1)
On-site Generating CMU.
(3)
28.4 MW
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
-
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(3)
-
• existing CHP on site
(2)
21.0 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• a Combined Heat and Power Plant
(3)
-
• A Distribution Connected 4.5MW gas fueled generating station
(2)
19.5 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
(and 1 more)
Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 …
(5)
16.6 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 7 more)
-
• 6 CHP engines horticultural environment with no auxiliiary load
(4)
-
• Two of six CHP engines horticultural environment with no auxiliiary load
13.4 MW
Inactive -
2027-28 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 6 more)
-
• 2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW
(2)
-
• 2X gas reciprocating engines with a total gross power capacity of 3.973 MW
(2)
-
• 2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW and a net power capacity of 3.953 …
10.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
(and 6 more)
Combined Heat and Power District Heating Plant at Battersea Power Station is made up of 2 CHPs totalling 4MW. The generator sizes have been inserted pro rata to achieve the …
(4)
10.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
(and 1 more)
-
• 2MW gas CHP engine in a horticultural environment
(2)
-
• One 2MW gas CHP engine in a horticultural environment
(2)
-
• One 1.5 MW gas CHP engine in a horticultural environment
10.0 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• 2 x Gas reciprocating engines with a total rated gross power capacity of 5.362 MW and total net power capacity …
(2)
-
• 2 x Gas reciprocating engines with a total rated gross power capacity of 5.362 MW and total net power capacity …
(2)
-
• 2 x Gas reciprocating engines with a total rated gross power capacity of 5.241 MW and total net power capacity …
9.6 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 7 more)
Callington - Existing Site CHP unit
(5)
9.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Energy Centre with 2 x1.5MW gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.
(5)
8.4 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-1)
(and 3 more)
CHP unit
(5)
8.4 MW
Inactive -
2025-26 (T-1),
2024-25 (T-4),
2023-24 (T-1)
(and 2 more)
On-Site Generating CMU
(3)
8.4 MW
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
On-Site Generating CMU
(3)
8.2 MW
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
-
• Combined Heat and Power Plant, University of Leicester, capacity of generator 1.600MW
(3)
-
• Combined Heat and Power Plant, University of Leicester, generator's capacity 1.600MW
(2)
8.2 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 7 more)
-
• 1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and …
(3)
-
• 2MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and …
(2)
7.9 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 7 more)
Combined Heat and Power Plant Olympic Park London
(12)
7.8 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 12 more)
On-Site Generating CMU
(3)
7.5 MW
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
-
• 1.2 MW Combined Heat and Power Engine.
(6)
-
• 1.6 MW Combined Heat and Power Engine
(6)
-
• 1.6MW Combined Heat and Power Engine
(4)
-
• ... and 1 more unique descriptions
7.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 8 more)
CHP unit
(5)
7.2 MW
Inactive -
2025-26 (T-1),
2024-25 (T-4),
2024-25 (T-1)
(and 7 more)
2x reciprocating gas engines with an aggregate gross capacity of 3.996 MW and net capacity of 3.908 MW
(2)
7.1 MW
Active -
2028-29 (T-4),
2025-26 (T-1)
On-site Generating CMU.
(2)
5.6 MW
Active -
2028-29 (T-4),
2025-26 (T-1)
2 x gas fired CHP generators located at a horticultural site.
(3)
5.5 MW
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-4)
On-Site Generating CMU
(3)
5.3 MW
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
one CHP (1.9MW rating) in a horticulatural environment with no aux load
(5)
5.2 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
(and 3 more)
-
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to …
-
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to …
5.1 MW
Active -
2025-26 (T-1)
On-Site Generating CMU
(3)
5.1 MW
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
-
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however …
(2)
-
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however …
-
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however …
-
• ... and 1 more unique descriptions
4.9 MW
Inactive -
2025-26 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 7 more)
Poole Existing Site CHP
(5)
4.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• On-site Generating Unit.
(2)
-
• on site generating cmu
(2)
4.4 MW
Inactive -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 1 more)
Hamms Hall - Existing Site CHP
(8)
4.2 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
On-Site Generating CMU
(3)
4.2 MW
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the …
(5)
4.1 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 7 more)
1.6MW Combined Heat and Power at International Conference Centre
(5)
4.0 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 7 more)
Existing Generation on existing site - CHP
(5)
4.0 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
(and 2 more)
CHP Unit
(3)
3.9 MW
Inactive -
2025-26 (T-1),
2024-25 (T-4),
2023-24 (T-4)
(and 1 more)
One CHP, generating for site load which exceeds generating capacity. No aux load.
(2)
3.9 MW
Active -
2028-29 (T-4),
2025-26 (T-1)
2025 KW gas fire engine
(3)
3.7 MW
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
2025kW gas engine
(3)
3.7 MW
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
Warrington Existing Site CHP
(5)
3.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Nantwich Existing Site CHP
(8)
3.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• 1 x Gas reciprocating engine with a total rated gross power capacity of 2.000 MW and total net power capacity …
(2)
-
• 1 x Gas reciprocating engine with a total rated gross power capacity of 2.000 MW and total net power capacity …
-
• 1 x Gas reciprocating engine with a total rated gross power capacity of 2.185 MW and total net power capacity …
-
• ... and 1 more unique descriptions
3.4 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 7 more)
Gas fired CHP at Corporation Road
(2)
3.3 MW
Active -
2025-26 (T-1),
2024-25 (T-1)
On-site Generating CMU.
(3)
3.3 MW
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
1 X gas engine with a gross capacity of 5.400 MW at MCR and ISO conditions
3.2 MW
Active -
2025-26 (T-1)
-
• on site generating CMU
(2)
-
• On-site Generating CMU
3.2 MW
Inactive -
2025-26 (T-1),
2024-25 (T-1),
2023-24 (T-1)