-
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to …
(3)
-
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to …
(2)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 4 more)
Syngenta - CHP unit
Active -
2024-25 (T-1)
gas-fired CHP unit
(5)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-4)
(and 7 more)
-
• 2.8MWe back pressure steam turbine
(3)
-
• 6.46 MWe Ruston Tornado Gas Turbine (Siemens SG200)
(2)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-4)
(and 7 more)
CHP Unit
(2)
Inactive -
2024-25 (T-1),
2023-24 (T-4)
-
• Gas fired CHP unit
(4)
-
• CHP plant
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 4 more)
-
• Gas fired CHP unit
(4)
-
• CHP unit
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 5 more)
CHP
(5)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 4 more)
On-site Generating CMU.
Active -
2024-25 (T-1)
-
• Gas Turbine CHP unit
(4)
-
• Steam turbine
Inactive -
2024-25 (T-1),
2023-24 (T-4),
2022-23 (T-1)
(and 1 more)
-
• Gas fired CHP unit
(4)
-
• CHP unit
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 5 more)
CHPs at Queen Elizabeth Hospital
(4)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the …
(5)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 4 more)
Gas fired CHP unit
(4)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
CHP at a water treatment works in Glasgow.
(3)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2022-23 (T-1)
-
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(8)
-
• Gas fired CHP unit
(4)
-
• CHP Unit
-
• ... and 1 more unique descriptions
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 8 more)
-
• CHP
(2)
-
• Gas Fired - CHP
(2)
Inactive -
2024-25 (T-1),
2023-24 (T-4),
2019-20 (T-1)
(and 1 more)
1280 KWe Combined Heat and Power unit.
(5)
1.1 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 4 more)
On-Site Generating CMU
(2)
1.3 MW
Active -
2025-26 (T-1),
2024-25 (T-1)
-
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 18042602
(3)
-
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 081171171
(2)
1.6 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 7 more)
One 2MW gas CHP engine in a horticultural environment
(3)
1.8 MW
Inactive -
2027-28 (T-4),
2024-25 (T-1),
2023-24 (T-1)
On site generating CMU
(2)
1.8 MW
Active -
2027-28 (T-4),
2024-25 (T-1)
on site generating CMU
(3)
1.8 MW
Inactive -
2027-28 (T-4),
2024-25 (T-1),
2023-24 (T-1)
On-Site Generating CMU
(3)
2.2 MW
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
Existing Generation on existing site - CHP
(5)
2.5 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 2 more)
On-Site Generating CMU
(3)
2.5 MW
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
On-Site Generating CMU
(3)
2.7 MW
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
-
• On-site Generating CMU
(2)
-
• on site generating CMU
(2)
2.7 MW
Inactive -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 1 more)
Existing Generation on existing site - CHP
(5)
2.9 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
(and 2 more)
Existing Generation on existing site - CHP
(5)
2.9 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
(and 2 more)
-
• on site generating CMU
(2)
-
• On-site Generating CMU
3.2 MW
Inactive -
2025-26 (T-1),
2024-25 (T-1),
2023-24 (T-1)
On-site Generating CMU.
(3)
3.3 MW
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
Gas fired CHP at Corporation Road
(2)
3.3 MW
Active -
2025-26 (T-1),
2024-25 (T-1)
Nantwich Existing Site CHP
(8)
3.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Warrington Existing Site CHP
(5)
3.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
2025kW gas engine
(3)
3.7 MW
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
2025 KW gas fire engine
(3)
3.7 MW
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
Existing Generation on existing site - CHP
(5)
4.0 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
(and 2 more)
1.6MW Combined Heat and Power at International Conference Centre
(5)
4.0 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 7 more)
On-Site Generating CMU
(3)
4.2 MW
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
Hamms Hall - Existing Site CHP
(8)
4.2 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• Gas CHP engines in commercial horticultural usage with no auxilliary load
(4)
-
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
4.2 MW
Inactive -
2027-28 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 7 more)
-
• On-site Generating Unit.
(2)
-
• on site generating cmu
(2)
4.4 MW
Inactive -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 1 more)
Poole Existing Site CHP
(5)
4.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however …
(2)
-
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however …
-
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however …
-
• ... and 1 more unique descriptions
4.9 MW
Inactive -
2025-26 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 7 more)
On-Site Generating CMU
(3)
5.1 MW
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
one CHP (1.9MW rating) in a horticulatural environment with no aux load
(5)
5.2 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
(and 3 more)
On-Site Generating CMU
(3)
5.3 MW
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
CHP unit
(5)
7.2 MW
Inactive -
2025-26 (T-1),
2024-25 (T-4),
2024-25 (T-1)
(and 7 more)
-
• 1.2 MW Combined Heat and Power Engine.
(6)
-
• 1.6 MW Combined Heat and Power Engine
(6)
-
• 1.6MW Combined Heat and Power Engine
(4)
-
• ... and 1 more unique descriptions
7.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 8 more)