On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383
(5)
122.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• existing on site CHP
(3)
-
• existing onsite CHP
(2)
46.2 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 3 more)
Gas Engine
(4)
39.6 MW
Inactive -
2025-26 (T-1),
2024-25 (T-4),
2024-25 (T-1)
(and 2 more)
-
• existing CHP on site.
(3)
-
• existing on site CHP
(2)
28.4 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 3 more)
-
• Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
(10)
-
• Gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
(2)
-
• One 22.9MVA gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural …
(2)
26.7 MW
Inactive -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 11 more)
-
• This is an existing CHP
(4)
-
• This is a long standing existing CHP unit located on land within a manufacturing site.
21.8 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(3)
-
• existing CHP on site
(2)
21.0 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Gas fired CHP unit
(5)
19.5 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 3 more)
Existing Generation on existing site - CHP
(5)
18.2 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 3 more)
-
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA
(3)
-
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA.
(2)
17.3 MW
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-4)
(and 7 more)
Existing Generation on existing site - CHP
(5)
14.8 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 4 more)
Gas Turbine Cogeneration Unit GT3
(5)
14.0 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 3 more)
-
• One of three CHP in a horticultural environment
(8)
-
• One of three CHP in a horticultural environment.
(8)
13.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 6 more)
-
• 6 CHP engines horticultural environment with no auxiliiary load
(4)
-
• Two of six CHP engines horticultural environment with no auxiliiary load
13.4 MW
Inactive -
2027-28 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 6 more)
-
• No2 Steam turbine - Allen Steam Turbines/NG Model MB510 - 2009 - Nominal power rating 14500kWe
(3)
-
• No5 Gas Turbine - European Gas Turbines SGT200 'Tornado' - S765/01 1997 - Nominal power output 6000kWe
(2)
13.2 MW
Inactive -
2023-24 (T-4),
2023-24 (T-1),
2022-23 (T-4)
(and 6 more)
-
• A 4.5MW gas fired reciprocating engine CHP (Engine 1).
(3)
-
• A 4.5MW gas fired reciprocating engine CHP (Engine 2).
(2)
12.2 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 3 more)
-
• Gas engine
(3)
-
• Gas turbine
(2)
11.2 MW
Inactive -
2024-25 (T-4),
2024-25 (T-1),
2023-24 (T-4)
(and 7 more)
Callington - Existing Site CHP unit
(5)
9.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Energy Centre with 2 x1.5MW gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.
(5)
8.4 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-1)
(and 3 more)
CHP unit
(5)
8.4 MW
Inactive -
2025-26 (T-1),
2024-25 (T-4),
2023-24 (T-1)
(and 2 more)
Gas fuelled CHP generation plant
(5)
8.2 MW
Inactive -
2027-28 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 4 more)
Turbomach M50 Natural Gas fired CHP unit
(5)
7.6 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-4)
(and 7 more)
Gas-fired CHP unit
(5)
7.3 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-4)
(and 7 more)
CHP unit
(5)
7.2 MW
Inactive -
2025-26 (T-1),
2024-25 (T-4),
2024-25 (T-1)
(and 7 more)
CHP Engine 3.360MW
(5)
6.1 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 2 more)
Gas Fired CHP
(3)
5.9 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2023-24 (T-1)
Gas fired CHP unit
(5)
5.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 3 more)
one CHP (1.9MW rating) in a horticulatural environment with no aux load
(5)
5.2 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
(and 3 more)
Poole Existing Site CHP
(5)
4.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• On-site Generating Unit.
(2)
-
• on site generating cmu
(2)
4.4 MW
Inactive -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 1 more)
-
• Gas CHP engines in commercial horticultural usage with no auxilliary load
(4)
-
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
4.2 MW
Inactive -
2027-28 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 7 more)
Hamms Hall - Existing Site CHP
(8)
4.2 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• VIT305 - CHP unit at John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU.
(4)
-
• New 4.5MW CHP at Oxford Hospital
4.1 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 3 more)
Turbomach M50 Natural Gas fired CHP unit
(5)
4.0 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-4)
(and 7 more)
Existing Generation on existing site - CHP
(5)
4.0 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
(and 2 more)
CHP Unit
(3)
3.9 MW
Inactive -
2025-26 (T-1),
2024-25 (T-4),
2023-24 (T-4)
(and 1 more)
-
• CHP unit
(3)
-
• Gas CHP located in St. Austell
(2)
3.6 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 6 more)
Warrington Existing Site CHP
(5)
3.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Nantwich Existing Site CHP
(8)
3.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• Gas CHP
(3)
-
• Gas CHP in St. Austell
(2)
3.4 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 6 more)
-
• on site generating CMU
(2)
-
• On-site Generating CMU
3.2 MW
Inactive -
2025-26 (T-1),
2024-25 (T-1),
2023-24 (T-1)
-
• Gas fired CHP unit
(3)
-
• Gas CHP in St. Austell
(2)
3.1 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 6 more)
-
• VIT303 - CHP unit at Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX
(3)
-
• VIT503 - CHP unit at Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX
3.0 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
A 3.36MW gas fired reciprocating engine CHP.
(4)
3.0 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
Existing Generation on existing site - CHP
(5)
2.9 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
(and 2 more)
Existing Generation on existing site - CHP
(5)
2.9 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
(and 2 more)
-
• On-site Generating CMU
(2)
-
• on site generating CMU
(2)
2.7 MW
Inactive -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 1 more)
Existing Generation on existing site - CHP
(5)
2.5 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 2 more)
Gas engine
(3)
2.3 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
2026 kW CHP unit
(5)
1.8 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 3 more)