Search Map View Statistics Support Us Help Login Register

Combined Heat and Power (CHP)

83 unique locations 753 components 0 companies Page 1 of 2
Maesgwyn Farm, Chirk, Wrexham, LL14 5NT (14 components)

On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383 (5)

GRIDBEYOND LIMITED Combined Heat and Power (CHP)
122.3 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, England, DN16 1XA. (12 components)
  • • existing on site CHP (3)
  • • existing onsite CHP (2)
GRIDBEYOND LIMITED Combined Heat and Power (CHP)
46.2 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 3 more)
Perenco UK, Wytch Farm, Thrashers Lane, Corfe Castle, Dorset, BH20 5JR (14 components)

Gas Engine (4)

ENERSYST LIMITED Combined Heat and Power (CHP)
39.6 MW
Inactive - 2025-26 (T-1), 2024-25 (T-4), 2024-25 (T-1) (and 2 more)
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, England, DN16 1XA (12 components)
  • • existing CHP on site. (3)
  • • existing on site CHP (2)
GRIDBEYOND LIMITED Combined Heat and Power (CHP)
28.4 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 3 more)
Drakemyre, Dalry KA24 5JJ (18 components)
  • • Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas (10)
  • • Gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas (2)
  • • One 22.9MVA gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural … (2)
FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
26.7 MW
Inactive - 2028-29 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 11 more)
Newton Aycliffe CO Durham DL5 6EA (30 components)
  • • This is an existing CHP (4)
  • • This is a long standing existing CHP unit located on land within a manufacturing site.
INOVYN CHLORVINYLS LIMITED CHP and autogeneration Combined Heat and Power (CHP)
21.8 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, DN16 1XA (21 components)
  • • Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)
  • • existing CHP on site (2)
GRIDBEYOND LIMITED DSR Combined Heat and Power (CHP)
21.0 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Mill Nurseries, Ottringham Road, Keyingham, Hull, HU12 9RX (8 components)

Gas fired CHP unit (5)

KIWI POWER LTD Combined Heat and Power (CHP)
19.5 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 3 more)
WEPA Bridgend Paper Mill, Llangynwyd, Mid Glamorgan, South Wales CF34 9RS (6 components)

Existing Generation on existing site - CHP (5)

GRIDBEYOND LIMITED Combined Heat and Power (CHP)
18.2 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 3 more)
1 Thane Road West, Nottingham, NG2 3AA (60 components)
  • • One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA (3)
  • • One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA. (2)
ENEL X UK LIMITED CHP and autogeneration Combined Heat and Power (CHP)
17.3 MW
Inactive - 2024-25 (T-1), 2023-24 (T-1), 2022-23 (T-4) (and 7 more)
SOUTH STAFFORDSHIRE WATER PLC, Hampton Loade Treatment Works, Hampton Loade, Bridgnorth, WV15 6HD (11 components)

Existing Generation on existing site - CHP (5)

GRIDBEYOND LIMITED Combined Heat and Power (CHP)
14.8 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 4 more)
Denison road, Selby, North Yorkshire, YO8 8AN. (8 components)

Gas Turbine Cogeneration Unit GT3 (5)

Plutus Energy LTD Combined Heat and Power (CHP)
14.0 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 3 more)
Rotherdale Farm, Long Lane, Throckmorton, Worcestershire, United Kingdom, WR10 2JH (27 components)
  • • One of three CHP in a horticultural environment (8)
  • • One of three CHP in a horticultural environment. (8)
FLEXITRICITY LIMITED Combined Heat and Power (CHP)
13.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 6 more)
High Street, Waterham, nr Faversham, Kent ME13 9EJ (10 components)
  • • 6 CHP engines horticultural environment with no auxiliiary load (4)
  • • Two of six CHP engines horticultural environment with no auxiliiary load
FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
13.4 MW
Inactive - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 6 more)
T&L Sugars Limited, Thames Refinery, Factory Road, Silvertown, London, United Kingdom, E16 2EW (26 components)
  • • No2 Steam turbine - Allen Steam Turbines/NG Model MB510 - 2009 - Nominal power rating 14500kWe (3)
  • • No5 Gas Turbine - European Gas Turbines SGT200 'Tornado' - S765/01 1997 - Nominal power output 6000kWe (2)
ENEL X UK LIMITED Combined Heat and Power (CHP)
13.2 MW
Inactive - 2023-24 (T-4), 2023-24 (T-1), 2022-23 (T-4) (and 6 more)
Imperial College London, South Kensington Campus, SW7 2AZ (18 components)
  • • A 4.5MW gas fired reciprocating engine CHP (Engine 1). (3)
  • • A 4.5MW gas fired reciprocating engine CHP (Engine 2). (2)
VITAL ENERGI SOLUTIONS LIMITED Combined Heat and Power (CHP)
12.2 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 3 more)
Station Road, Wigton, Cumbria CA7 9BG (29 components)
  • • Gas engine (3)
  • • Gas turbine (2)
ENEL X UK LIMITED CHP and autogeneration Combined Heat and Power (CHP)
11.2 MW
Inactive - 2024-25 (T-4), 2024-25 (T-1), 2023-24 (T-4) (and 7 more)
Samworth Brothers, 81-83 Tavistock Road, Callington, Cornwall, PL17 7TA (11 components)

Callington - Existing Site CHP unit (5)

GRIDBEYOND LIMITED Combined Heat and Power (CHP)
9.5 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
2 Engineers Way, Wembley, Middlesex, HA9 0JS (6 components)

Energy Centre with 2 x1.5MW gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations. (5)

FLEXITRICITY LIMITED Combined Heat and Power (CHP)
8.4 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-1) (and 3 more)
Pontefract Rd, Leeds, LS10 1AX (16 components)

CHP unit (5)

ENEL X UK LIMITED Combined Heat and Power (CHP)
8.4 MW
Inactive - 2025-26 (T-1), 2024-25 (T-4), 2023-24 (T-1) (and 2 more)
Shottentons Farm, Pecks Hill, Nazeing, Essex, EN9 2NY (9 components)

Gas fuelled CHP generation plant (5)

NORTHERN INDUSTRIAL GENERATION LIMITED Combined Heat and Power (CHP) Open Cycle Gas Turbine (OCGT)
8.2 MW
Inactive - 2027-28 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 4 more)
Staverton, Trowbridge, Wiltshire, BA14 6PH (17 components)

Turbomach M50 Natural Gas fired CHP unit (5)

ENEL X UK LIMITED CHP and autogeneration Combined Heat and Power (CHP)
7.6 MW
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-4) (and 7 more)
London Rd, Purfleet RM19 1SD (16 components)

Gas-fired CHP unit (5)

ENEL X UK LIMITED CHP and autogeneration Combined Heat and Power (CHP)
7.3 MW
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-4) (and 7 more)
Samian Way, Aston, Clinton ,Aylesbury, England, HP22 5EZ (23 components)

CHP unit (5)

ENEL X UK LIMITED Combined Heat and Power (CHP)
7.2 MW
Inactive - 2025-26 (T-1), 2024-25 (T-4), 2024-25 (T-1) (and 7 more)
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW. (7 components)

CHP Engine 3.360MW (5)

Rolls-Royce Power Development Limited Combined Heat and Power (CHP)
6.1 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2023-24 (T-1) (and 2 more)
Stainland Boardmill, Holywell Green, Halifax, HX4 9PY (3 components)

Gas Fired CHP (3)

E.ON UK PLC Combined Heat and Power (CHP)
5.9 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2023-24 (T-1)
Burnside Mills, Kendal,Cumbria,LA9 6PZ (6 components)

Gas fired CHP unit (5)

KIWI POWER LTD Combined Heat and Power (CHP)
5.5 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 3 more)
Northmoor Lane, Cottingham, Hull HU16 4JN (6 components)

one CHP (1.9MW rating) in a horticulatural environment with no aux load (5)

FLEXITRICITY LIMITED Combined Heat and Power (CHP)
5.2 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-1) (and 3 more)
Poole Sustainable Energy LTD, Sterte Ave, Poole, Dorset, BH15 2AS (11 components)

Poole Existing Site CHP (5)

GRIDBEYOND LIMITED Combined Heat and Power (CHP)
4.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Hugden Way, Malton YO17 9HG (4 components)
  • • On-site Generating Unit. (2)
  • • on site generating cmu (2)
GRIDBEYOND LIMITED Combined Heat and Power (CHP)
4.4 MW
Inactive - 2028-29 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 1 more)
46 Station Road Stokesley Middlesbrough TS9 7AA (10 components)
  • • Gas CHP engines in commercial horticultural usage with no auxilliary load (4)
  • • 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
FLEXITRICITY LIMITED Reciprocating engines CHP and autogeneration Combined Heat and Power (CHP)
4.2 MW
Inactive - 2027-28 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 7 more)
Hams Hall Sustainable Energy LTD, Edison Road, Hams Hall Distribution Park, Coleshill, B46 1AL (11 components)

Hamms Hall - Existing Site CHP (8)

GRIDBEYOND LIMITED Combined Heat and Power (CHP)
4.2 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU (6 components)
  • • VIT305 - CHP unit at John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU. (4)
  • • New 4.5MW CHP at Oxford Hospital
VITAL ENERGI SOLUTIONS LIMITED CHP and autogeneration Combined Heat and Power (CHP)
4.1 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2023-24 (T-1) (and 3 more)
Port Causeway Bromborough Merseyside CH62 4TH (16 components)

Turbomach M50 Natural Gas fired CHP unit (5)

ENEL X UK LIMITED CHP and autogeneration Combined Heat and Power (CHP)
4.0 MW
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-4) (and 7 more)
2 Samworth Way, Melton Mowbray LE13 1GA (5 components)

Existing Generation on existing site - CHP (5)

GRIDBEYOND LIMITED Combined Heat and Power (CHP)
4.0 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-1) (and 2 more)
24-25 Eastern Way, Bury St Edmunds, IP32 7AD (12 components)

CHP Unit (3)

ENEL X UK LIMITED Combined Heat and Power (CHP)
3.9 MW
Inactive - 2025-26 (T-1), 2024-25 (T-4), 2023-24 (T-4) (and 1 more)
Par CHP, Par Docks, Par, St. Austell, PL24 2BN (9 components)
  • • CHP unit (3)
  • • Gas CHP located in St. Austell (2)
KIWI POWER LTD Combined Heat and Power (CHP)
3.6 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 6 more)
Warrington Sustainable Energy LTD, Skyline Drive, Warrington, WA5 3TP (11 components)

Warrington Existing Site CHP (5)

GRIDBEYOND LIMITED Combined Heat and Power (CHP)
3.5 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
MGH Property Services Limited, Laurels Farm, Hatherton, Nantwich, CW5 7PW (11 components)

Nantwich Existing Site CHP (8)

GRIDBEYOND LIMITED Combined Heat and Power (CHP)
3.4 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Rocks Dryer, Rosvear Road, Bugle, St. Austell, PL26 8PJ (9 components)
  • • Gas CHP (3)
  • • Gas CHP in St. Austell (2)
KIWI POWER LTD Combined Heat and Power (CHP)
3.4 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 6 more)
Speke Blvd, Speke, Liverpool L24 9LE (3 components)
  • • on site generating CMU (2)
  • • On-site Generating CMU
GRIDBEYOND LIMITED Combined Heat and Power (CHP)
3.2 MW
Inactive - 2025-26 (T-1), 2024-25 (T-1), 2023-24 (T-1)
Treviscoe Dryer, Little Treviscoe, St. Austell, PL26 7QN (9 components)
  • • Gas fired CHP unit (3)
  • • Gas CHP in St. Austell (2)
KIWI POWER LTD Combined Heat and Power (CHP)
3.1 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 6 more)
Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX (6 components)
  • • VIT303 - CHP unit at Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX (3)
  • • VIT503 - CHP unit at Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX
VITAL ENERGI SOLUTIONS LIMITED Combined Heat and Power (CHP)
3.0 MW
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1) (and 1 more)
Energy Centre, Lower Mosley Street, Manchester M2 3GX (6 components)

A 3.36MW gas fired reciprocating engine CHP. (4)

VITAL ENERGI SOLUTIONS LIMITED Combined Heat and Power (CHP)
3.0 MW
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1) (and 1 more)
Aspatria Creamery/Station Rd, Wigton CA7 2AR (6 components)

Existing Generation on existing site - CHP (5)

GRIDBEYOND LIMITED Combined Heat and Power (CHP)
2.9 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-1) (and 2 more)
Pembroke Rd, Merlin's Bridge, Haverfordwest SA61 1JN (6 components)

Existing Generation on existing site - CHP (5)

GRIDBEYOND LIMITED Combined Heat and Power (CHP)
2.9 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-1) (and 2 more)
Young's House, Wickham Road, Grimsby DN32 8HW (4 components)
  • • On-site Generating CMU (2)
  • • on site generating CMU (2)
GRIDBEYOND LIMITED Combined Heat and Power (CHP)
2.7 MW
Inactive - 2028-29 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 1 more)
Solvay, Trinity St, Oldbury, B69 4LW (6 components)

Existing Generation on existing site - CHP (5)

GRIDBEYOND LIMITED Combined Heat and Power (CHP)
2.5 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 2 more)
Westexe, Tiverton, Devon, EX16 5LL (6 components)

2026 kW CHP unit (5)

CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED Combined Heat and Power (CHP)
1.8 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 3 more)
Showing locations 1 - 50 of 83