Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the …
(5)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 4 more)
-
• Site based CHP ( reclassified from reciprocating engine for EMR purposes given definitions in Capacity Market Auction Guidelines )
(4)
-
• Site based CHP - note the primary fuel are Waste Gases
Inactive -
2023-24 (T-4),
2023-24 (T-1),
2022-23 (T-3)
(and 3 more)
CHP Unit
Inactive -
2023-24 (T-1)
gas-fired CHP unit
(5)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-4)
(and 7 more)
-
• 2.8MWe back pressure steam turbine
(3)
-
• 6.46 MWe Ruston Tornado Gas Turbine (Siemens SG200)
(2)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-4)
(and 7 more)
CHP unit
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
CHP unit
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
-
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(8)
-
• Gas fired CHP unit
(4)
-
• CHP Unit
-
• ... and 1 more unique descriptions
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 8 more)
Gas fired CHP unit
(4)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
CHPs at Queen Elizabeth Hospital
(4)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
-
• A gas turbine generating unit, part of a CHP which supplies heat & power to a paper mill
(3)
-
• A steam turbine generating unit, part of a CHP which supplies heat & power to a paper mill
(2)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-1)
(and 4 more)
-
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to …
(3)
-
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to …
(2)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 4 more)
The CMU component will have a connection capacity of 6MW. Gas-fired reciprocating engine will be the technology used
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2023-24 (T-1)
(and 2 more)
-
• Gas-fired reciprocating engines fitted with heat and CO2 recovery equipment, plus transformers, switchgear and associated controls with a total connection …
(3)
-
• Gas-fired reciprocating engines fitted with heat and CO2 recovery equipment, plus transformers, switch gear and associated controls with a total …
-
• Gas-fired reciprocating engines fitted with heat and CO2 recovery equipment, plus transformers, switch gear and associated controls with a total …
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2020-21 (T-4)
-
• Gas fired CHP unit
(4)
-
• CHP unit
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 5 more)
-
• Gas fired CHP unit
(4)
-
• CHP unit
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 5 more)
-
• Gas fired CHP unit
(4)
-
• CHP plant
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 4 more)
CHP unit
(4)
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
CHP
(5)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 4 more)
E1000 CHP unit
(5)
0.9 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 3 more)
E1000 CHP
(5)
0.9 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 3 more)
EnerG 1000 CHP
(5)
0.9 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 3 more)
EnerG 1000 CHP
(5)
0.9 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 3 more)
1.280MW CHP
(5)
1.2 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 2 more)
-
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific …
(6)
-
• Gas CHP engines 1.37MW and 1.50MW. Primary fuel type = Natural Gas
(2)
1.3 MW
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 8 more)
1.521 MW CHP unit
(5)
1.3 MW
Inactive -
2026-27 (T-4),
2024-25 (T-4),
2023-24 (T-1)
(and 2 more)
Cummins HSK78 2,000 kW Gas Engine located at UK WINDOWS & DOORS GROUP LIMITED, 6400 Severn Drive, Tewkesbury, GL20 8SF.
(2)
1.6 MW
Inactive -
2023-24 (T-1),
2022-23 (T-1)
Gas fired CHP unit
(4)
1.7 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
CHP unit - 1 x 2,000kw
(3)
1.7 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
CHP unit
(3)
1.8 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
One 2MW gas CHP engine in a horticultural environment
(3)
1.8 MW
Inactive -
2027-28 (T-4),
2024-25 (T-1),
2023-24 (T-1)
CHP unit
(4)
1.8 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
on site generating CMU
(3)
1.8 MW
Inactive -
2027-28 (T-4),
2024-25 (T-1),
2023-24 (T-1)
2026 kW CHP unit
(5)
1.8 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 3 more)
Gas engine
(3)
2.3 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
Existing Generation on existing site - CHP
(5)
2.5 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 2 more)
-
• On-site Generating CMU
(2)
-
• on site generating CMU
(2)
2.7 MW
Inactive -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 1 more)
Existing Generation on existing site - CHP
(5)
2.9 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
(and 2 more)
Existing Generation on existing site - CHP
(5)
2.9 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
(and 2 more)
A 3.36MW gas fired reciprocating engine CHP.
(4)
3.0 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
-
• VIT303 - CHP unit at Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX
(3)
-
• VIT503 - CHP unit at Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX
3.0 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
-
• Gas fired CHP unit
(3)
-
• Gas CHP in St. Austell
(2)
3.1 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 6 more)
-
• on site generating CMU
(2)
-
• On-site Generating CMU
3.2 MW
Inactive -
2025-26 (T-1),
2024-25 (T-1),
2023-24 (T-1)
-
• Gas CHP
(3)
-
• Gas CHP in St. Austell
(2)
3.4 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 6 more)
Nantwich Existing Site CHP
(8)
3.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Warrington Existing Site CHP
(5)
3.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• CHP unit
(3)
-
• Gas CHP located in St. Austell
(2)
3.6 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 6 more)
CHP Unit
(3)
3.9 MW
Inactive -
2025-26 (T-1),
2024-25 (T-4),
2023-24 (T-4)
(and 1 more)
Existing Generation on existing site - CHP
(5)
4.0 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
(and 2 more)
Turbomach M50 Natural Gas fired CHP unit
(5)
4.0 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-4)
(and 7 more)