Search Map View Statistics Support Us Help Login Register

Combined Heat and Power (CHP)

135 unique locations 1247 components 0 companies Page 1 of 3
Power Station Road Isle of Grain Rochester ME3 0AR (55 components)
  • • Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
  • • Grain B CCGT Unit 7 Grain B power station provides heat to the Grain LNG regasification facility.
  • • Grain B CCGT Unit 8. Grain B power station provides heat to the Grain LNG regasification facility.
  • • ... and 2 more unique descriptions
UNIPER UK LIMITED CHP and autogeneration Combined Heat and Power (CHP) Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines (Fuel Type - Diesel)
4000.3 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Rosper Road Immingham North Lincolnshire DN40 3DZ (16 components)
  • • Gas CHP on South bank of river Humber providing electricity and industrial steam (8)
  • • New build gas reciprocating multi-engine generating plant (4)
  • • Battery storage unit
VPI Immingham LLP Reciprocating engines Storage (Duration 2h) CHP and autogeneration Combined Heat and Power (CHP)
3439.5 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Saltend Power Station Saltend Hull HU12 8GA (33 components)
  • • Unit 1 at Saltend Power Station (2)
  • • Unit 2 at Saltend Power Station (2)
  • • Unit 3 at Saltend Power Station
SALTEND COGENERATION COMPANY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
3107.9 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom (9 components)
  • • Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at … (5)
  • • Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at …
  • • Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at …
  • • ... and 1 more unique descriptions
ESSO PETROLEUM COMPANY,LIMITED Combined Heat and Power (CHP)
379.8 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 5 more)
Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom (29 components)
  • • TG1B is part of the aggregated CMU EMD-19, which is made up of 2 Generating Units of which TG1B is … (6)
  • • Unit 3 is part of the aggregated CMU EMD-19, which is made up of 2 Generating Units of which Unit … (6)
  • • TG1B is part of the aggregated CMU EMD-18, which is made up of 2 Generating Units of which TG1B is … (2)
  • • ... and 7 more unique descriptions
ESSO PETROLEUM COMPANY,LIMITED Combined Heat and Power (CHP)
300.5 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 9 more)
Bo'ness Road Grangemouth Stirlingshire FK3 9XQ (12 components)

CHP Plant connected to Private Wire System (operated by INEOS Infrastructure (Grangemouth) Limited) with Connection to NETS (5)

GRANGEMOUTH CHP LIMITED CHP and autogeneration Combined Heat and Power (CHP)
259.8 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 7 more)
Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS (21 components)
  • • (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). Unit is a OCGT … (4)
  • • (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S24G01 is a OCGT …
Sembcorp Utilities (UK) Limited CHP and autogeneration Combined Heat and Power (CHP)
184.4 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Bury St Edmunds Sugar Factory British Sugar plc Hollow Road Bury St Edmunds IP32 7BB (12 components)

The CMU is a gas fired CCGT CHP (5)

BRITISH SUGAR PLC CHP and autogeneration Combined Heat and Power (CHP)
166.1 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Wissington Sugar Factory British Sugar plc College Road Wissington King's Lynn PE33 9QG (16 components)

The CMU is a gas fired CCGT CHP (5)

BRITISH SUGAR PLC CHP and autogeneration Combined Heat and Power (CHP)
126.0 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (31 components)
  • • Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor. (3)
  • • Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
  • • Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator …
WINNINGTON CHP LIMITED CHP and autogeneration Combined Heat and Power (CHP) Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines (Fuel Type - Gas)
119.6 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Sembcorp UK Headquarters Wilton International Middlesbrough TS90 8WS United Kingdom (12 components)
  • • CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S26G02 is a OCGT in CHP … (3)
  • • CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S24G02 is a OCGT in CHP … (2)
Sembcorp Utilities (UK) Limited CHP and autogeneration Combined Heat and Power (CHP)
116.4 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Cargill PLC, Trafford Park, Manchester, M17 1PA (48 components)
  • • Siemens SGT200 based CHP (13)
  • • Solar T70 Based CHP System (13)
  • • Solar T70 based CHP system (13)
CARGILL PLC CHP and autogeneration Combined Heat and Power (CHP)
61.6 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 11 more)
Europa Energy Centre, Hills Court Road, Ash, Kent, CT3 2AP (19 components)

The CMU Component will have a connection capacity of 15MW. Gas-fired reciprocating engine will be the technology used. (5)

P3P BREHON LIMITED Reciprocating engines CHP and autogeneration Combined Heat and Power (CHP)
41.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Saddlebow Industrial Estate, Poplar Avenue, King's Lynn PE34 3AL. (13 components)
  • • Power Station for Paper plant made up of 1x35MW Gas engine plus 1x12MW steam turbine (4)
  • • Power Station for Paper plant made up of 1x35MW Gas engine
CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED Combined Heat and Power (CHP)
41.3 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 7 more)
Drakemyre, Dalry KA24 5JJ (18 components)
  • • Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas (10)
  • • Gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas (2)
  • • One 22.9MVA gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural … (2)
FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
26.7 MW
Inactive - 2028-29 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 11 more)
Newton Aycliffe CO Durham DL5 6EA (30 components)
  • • This is an existing CHP (4)
  • • This is a long standing existing CHP unit located on land within a manufacturing site.
INOVYN CHLORVINYLS LIMITED CHP and autogeneration Combined Heat and Power (CHP)
21.8 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
47-53 Charterhouse Street, London, EC1M 6PB (17 components)

A site with two gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network. (5)

CITIGEN (LONDON) LIMITED CHP and autogeneration Combined Heat and Power (CHP)
21.5 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, DN16 1XA (21 components)
  • • Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)
  • • existing CHP on site (2)
GRIDBEYOND LIMITED DSR Combined Heat and Power (CHP)
21.0 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Cargill PLC, Trafford Park, M17 1PA (16 components)

Siemens SGT200 Based CHP (5)

CARGILL PLC CHP and autogeneration Combined Heat and Power (CHP)
19.6 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (21 components)

The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year. (5)

SPARK STEAM LIMITED Reciprocating engines CHP and autogeneration Combined Heat and Power (CHP)
18.4 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
1 Thane Road West, Nottingham, NG2 3AA (60 components)
  • • One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA (3)
  • • One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA. (2)
ENEL X UK LIMITED CHP and autogeneration Combined Heat and Power (CHP)
17.3 MW
Inactive - 2024-25 (T-1), 2023-24 (T-1), 2022-23 (T-4) (and 7 more)
100 Montifichet Road, Westfield, Stratford E20 1GR (36 components)

Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 … (5)

EAST LONDON ENERGY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
16.6 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 7 more)
Cowie Sterling FK7 7BQ (9 components)

14.710 MW CHP generation (5)

LIMEJUMP LTD Combined Heat and Power (CHP)
13.4 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 6 more)
High Street, Waterham, nr Faversham, Kent ME13 9EJ (10 components)
  • • 6 CHP engines horticultural environment with no auxiliiary load (4)
  • • Two of six CHP engines horticultural environment with no auxiliiary load
FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
13.4 MW
Inactive - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 6 more)
T&L Sugars Limited, Thames Refinery, Factory Road, Silvertown, London, United Kingdom, E16 2EW (26 components)
  • • No2 Steam turbine - Allen Steam Turbines/NG Model MB510 - 2009 - Nominal power rating 14500kWe (3)
  • • No5 Gas Turbine - European Gas Turbines SGT200 'Tornado' - S765/01 1997 - Nominal power output 6000kWe (2)
ENEL X UK LIMITED Combined Heat and Power (CHP)
13.2 MW
Inactive - 2023-24 (T-4), 2023-24 (T-1), 2022-23 (T-4) (and 6 more)
Station Road, Wigton, Cumbria CA7 9BG (29 components)
  • • Gas engine (3)
  • • Gas turbine (2)
ENEL X UK LIMITED CHP and autogeneration Combined Heat and Power (CHP)
11.2 MW
Inactive - 2024-25 (T-4), 2024-25 (T-1), 2023-24 (T-4) (and 7 more)
Wood End, Stocks Lane, Over Peover, Knutsford WA16 9EZ (16 components)
  • • 2MW gas CHP engine in a horticultural environment (2)
  • • One 2MW gas CHP engine in a horticultural environment (2)
  • • One 1.5 MW gas CHP engine in a horticultural environment
FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
10.0 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Royal Liverpool University Hospital, Prescott Street, Liverpool L7 8XP (11 components)
  • • 2 x Gas reciprocating engines with a total rated gross power capacity of 5.362 MW and total net power capacity … (2)
  • • 2 x Gas reciprocating engines with a total rated gross power capacity of 5.362 MW and total net power capacity … (2)
  • • 2 x Gas reciprocating engines with a total rated gross power capacity of 5.241 MW and total net power capacity …
VEOLIA UK LIMITED CHP and autogeneration Combined Heat and Power (CHP)
9.6 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 7 more)
APS Growers Ltd / Branfield Nursery 111 Stockbridge Road Elloughton HU15 1HW (14 components)
  • • One Jenbacher CHP engine with a generation capacity of 3.36 MW (10)
  • • The new Energy Centre will consist of one Jenbacher CHP engine with a generation capacity of 3.36 MW and a …
GLASS LEAF POWER LIMITED Reciprocating engines Combined Heat and Power (CHP)
9.3 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 9 more)
Nr 125 Park Lane Cottingham East Yorkshire HU16 5RX (17 components)
  • • CHP at a horticultural environment. (2)
  • • Gas CHP engines in commercial horticultural environment with no auxilliary load (2)
  • • CHP at horticultural site
FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
9.3 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (12 components)
  • • The CMU Component will have a connection capacity of 3.376MW. Gas-fired reciprocating engine will be the technology used. (3)
  • • The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be … (2)
P3P ENERGY MANAGEMENT AE LIMITED Reciprocating engines CHP and autogeneration Combined Heat and Power (CHP)
9.2 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Plot 3, Barrow Man Road, Birchington CT7 0AX (11 components)

Gas CHP in a horticultural environment providing heat & electricity to site and exporting excess. (9)

FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
8.7 MW
Inactive - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 8 more)
Fielding & Johnson Building University Of Leicester University Road LEICESTER Leicestershire LE1 7RH (28 components)
  • • Combined Heat and Power Plant, University of Leicester, capacity of generator 1.600MW (3)
  • • Combined Heat and Power Plant, University of Leicester, generator's capacity 1.600MW (2)
LEICESTER DISTRICT ENERGY COMPANY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
8.2 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 7 more)
QMC Campus, Nottingham University Hospitals, Queens Medical Centre, Derby Road, Nottingham, NG7 2UH (10 components)

A site with one gas turbine CHP, providing steam and electricity to Queens Medical Centre in Nottingham (5)

E.ON UK PLC CHP and autogeneration Combined Heat and Power (CHP)
8.1 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 7 more)
Aston University, Aston Triangle, Birmingham, West Midlands, B4 7ET (30 components)
  • • 1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and … (3)
  • • 2MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and … (2)
BIRMINGHAM DISTRICT ENERGY COMPANY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
7.9 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 7 more)
Kings Yard Energy Centre, Carpenters Lane, Stratford, London E15 2DU (18 components)

Combined Heat and Power Plant Olympic Park London (12)

EAST LONDON ENERGY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
7.8 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 12 more)
Staverton, Trowbridge, Wiltshire, BA14 6PH (17 components)

Turbomach M50 Natural Gas fired CHP unit (5)

ENEL X UK LIMITED CHP and autogeneration Combined Heat and Power (CHP)
7.6 MW
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-4) (and 7 more)
Smurfit Kappa SSK, Mount Street, Nechells, Birmingham B7 5RE (11 components)
  • • 8.300MW Gas Turbine installation (3)
  • • 8.3MW Gas Turbine installation (2)
LIMEJUMP LTD CHP and autogeneration Combined Heat and Power (CHP)
7.6 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 7 more)
London Rd, Purfleet RM19 1SD (16 components)

Gas-fired CHP unit (5)

ENEL X UK LIMITED CHP and autogeneration Combined Heat and Power (CHP)
7.3 MW
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-4) (and 7 more)
The Old Airfield, City Fields Way, Tangmere, Chichester West Sussex PO20 2FT (12 components)
  • • Four CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for … (6)
  • • Three CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for … (2)
  • • Three engines of 2.65MW each all CHP engine in a horticultural environment, exporting excess generation to distribution network. Primary fuel … (2)
FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
6.4 MW
Inactive - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 8 more)
Plot 4 Thanet Earth, Barrow Man Road Birchington Kent CT7 0AX (7 components)

Two CHP gas engines in commercial horticultural environment with no auxilliary load (6)

FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
6.0 MW
Inactive - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 4 more)
Plot 6 Barrow Man Road, Birchington CT7 0AX (11 components)

CHP engine in a horticultural environment, natural gas, no aux load (9)

FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
5.8 MW
Inactive - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 8 more)
Thanet Earth Plot 2, 2 Barrow Man Road Birchington Kent CT7 0AX (10 components)
  • • CHP engine in horticultural environment with no auxilliary load (3)
  • • Two CHP engines in horticultural environment with no auxilliary load (2)
FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
5.8 MW
Inactive - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 4 more)
Tower Nurseries Netherhall Road Roydon Essex CM19 5JP (11 components)

Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations (5)

FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
5.6 MW
Inactive - 2028-29 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 7 more)
323 Avebury Boulevard, MILTON KEYNES MK9 2GA (10 components)

District heating implementation of two gas CHP engines with no auxilliary load (5)

P3P Partners LLP CHP and autogeneration Combined Heat and Power (CHP)
5.5 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 6 more)
School Road, Aberdeen AB24 1TU (14 components)

District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations. (5)

FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
5.2 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
The Heat Station Harbour Parade, Southampton, Hampshire, SO15 1BA (26 components)
  • • 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however … (2)
  • • 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however …
  • • 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however …
  • • ... and 1 more unique descriptions
SOUTHAMPTON GEOTHERMAL HEATING COMPANY LTD(THE) CHP and autogeneration Combined Heat and Power (CHP)
4.9 MW
Inactive - 2025-26 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 7 more)
Barrow Man Road Birchington Kent CT7 0AX (10 components)

Two CHP engines in horticultural environment with no auxilliary load (5)

FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
4.7 MW
Inactive - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 6 more)
46 Station Road Stokesley Middlesbrough TS9 7AA (10 components)
  • • Gas CHP engines in commercial horticultural usage with no auxilliary load (4)
  • • 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
FLEXITRICITY LIMITED Reciprocating engines CHP and autogeneration Combined Heat and Power (CHP)
4.2 MW
Inactive - 2027-28 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 7 more)
St Marks Boilerhouse Donaldson Road LEICESTER Leicestershire LE4 6BF (14 components)

Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the … (5)

LEICESTER DISTRICT ENERGY COMPANY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
4.1 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 7 more)
Showing locations 1 - 50 of 135