Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Combined Heat and Power (CHP)

60 unique locations 657 components 0 companies Page 1 of 2
Map View
66 Molesworth Street, London SE13 7EY (8 components)
  • • Gas fired CHP unit (4)
  • • CHP plant
KIWI POWER LTD Combined Heat and Power (CHP)
Inactive - 2024-25 (T-1), 2023-24 (T-1), 2022-23 (T-1) (and 4 more)
Hammersmith Hospital, Du Cane Road, Shepherds Bush, London, W12 0HS (5 components)

A gas turbine CHP, providing steam and electricity to Hammersmith Hospital (4)

E.ON UK PLC Combined Heat and Power (CHP)
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2021-22 (T-1) (and 2 more)
JDE, Ruscote Avenue, Banbury, Oxfordshire, OX16 2QU (16 components)
  • • Centrax gas turbine CHP (3)
  • • Centrax gas turbine which will have bespoke metering in installed to capture the generation output. (2)
ENEL X UK LIMITED Combined Heat and Power (CHP)
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 5 more)
University of Warwick, Coventry, CV4 7AL (42 components)
  • • One of six CHP units at University of Warwick, Coventry, CV4 7AL (3)
  • • One of six CHP units at University of Warwick, Coventry, CV4 7AL. (2)
ENEL X UK LIMITED Combined Heat and Power (CHP)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 4 more)
Energy Center, Ashton Street, Liverpool, L69 3GB (39 components)
  • • One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB (3)
  • • One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843 (2)
ENEL X UK LIMITED CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 7 more)
Church Manorway, Erith DA8 1DL (33 components)

gas-fired CHP unit (5)

ENEL X UK LIMITED CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2024-25 (T-1), 2023-24 (T-1), 2022-23 (T-4) (and 7 more)
Engie Great Coates, Grimsby, DN31 2TT (21 components)

Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the … (5)

BRING ENERGY LIMITED Combined Heat and Power (CHP)
Inactive - 2024-25 (T-1), 2023-24 (T-1), 2022-23 (T-1) (and 4 more)
Park Road, Ware. Hertfordshire, SG12 0DP (20 components)

On-site existing CHP generating unit (5)

DISTRIBUTED ENERGY CUSTOMER SOLUTIONS LIMITED CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 7 more)
Gunnels Wood Road, Stevenage, SG1 2NY, United Kingdom (18 components)

On-site existing CHP generating unit (5)

DISTRIBUTED ENERGY CUSTOMER SOLUTIONS LIMITED CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 6 more)
Staithes Road, Preston, Hull, HU12 8TB (17 components)
  • • Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (8)
  • • Gas fired CHP unit (4)
  • • CHP Unit
  • • ... and 1 more unique descriptions
KIWI POWER LTD DSR Combined Heat and Power (CHP)
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 8 more)
Engie Great Coates, Grimsby, DN31 2TT (14 components)
  • • Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to … (3)
  • • Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to … (2)
BRING ENERGY LIMITED Combined Heat and Power (CHP)
Inactive - 2024-25 (T-1), 2023-24 (T-1), 2022-23 (T-1) (and 4 more)
Harmire Road, Barnard Castle, County Durham, DL12 8DT (14 components)

On-site existing CHP generating unit (5)

ENERSYST LIMITED CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 7 more)
Marsh Road, Banks, Southport PR9 8DX (14 components)
  • • Gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh … (2)
  • • The component consists of gas CHP (2679kW and 2004kW) servicing the electricity and heat requirements for Aldergrove Nursery, one of … (2)
  • • The component consists of gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites …
FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 7 more)
North Avenue, Marston Green, Birmingham, B40 1NT (12 components)
  • • CHP Unit 850kWe proposed to be installed in Hall 6-8 at NEC site (2)
  • • Gas Generation units at 1013kWe
  • • Proposed CHP Unit 850kWe to be installed in Hall 6-8 at NEC site
  • • ... and 1 more unique descriptions
CENTRICA BUSINESS SOLUTIONS (GENERATION) LIMITED DSR Reciprocating engines Combined Heat and Power (CHP)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-3) (and 1 more)
Melrow Nursery, Rydings Lane, Southport PR9 8EB (11 components)

The component consists of gas CHP 3355kW servicing the electricity and heat requirements for Melrow Nursery, one of the horticultural sites which trades at Flavourfresh Salads. The generation unit capacity … (5)

FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 7 more)
Cobden Street, Montrose, Angus, DD10 8EA (9 components)

On-site existing CHP generating unit (5)

DISTRIBUTED ENERGY CUSTOMER SOLUTIONS LIMITED CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 6 more)
Priory Street, Ware, Hertfordshire, SG12 0DJ (9 components)

On-site existing CHP generating unit (5)

DISTRIBUTED ENERGY CUSTOMER SOLUTIONS LIMITED CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 6 more)
Repton Road, Measham, Swadlincote, DE12 7DT (9 components)
  • • Gas fired CHP unit (4)
  • • CHP unit
KIWI POWER LTD CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2024-25 (T-1), 2023-24 (T-1), 2022-23 (T-1) (and 5 more)
Stoneykirk Road, Stranraer, DG9 7BU (9 components)
  • • Gas fired CHP unit (4)
  • • CHP unit
KIWI POWER LTD CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2024-25 (T-1), 2023-24 (T-1), 2022-23 (T-1) (and 5 more)
Denmark Hill, Brixton, London, SE5 9RS (7 components)
  • • CHP unit (4)
  • • Gas fired CHP unit
KIWI POWER LTD CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2021-22 (T-1) (and 4 more)
Harmire Road, Barnard Castle, County Durham, DL12 8D (8 components)

On-site existing CHP generating unit (5)

ENERSYST LIMITED Combined Heat and Power (CHP)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-3) (and 4 more)
Lockerbie Creamery, Lockerbie, England. DG11 1LW (8 components)

CHP unit (4)

ENEL X UK LIMITED Combined Heat and Power (CHP)
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1) (and 1 more)
Southdownview Way, Worthing, West Sussex, BN14 8QH (8 components)

CHP and autogeneration (5)

CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED Combined Heat and Power (CHP)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 5 more)
Runnings Road, Swindon Village, Cheltenham, GL51 9NQ (7 components)

A gas engine CHP site providing steam and electricity to an industrial unit (5)

E.ON UK PLC Combined Heat and Power (CHP)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 4 more)
530 London Road, Croydon, CR7 7YE (4 components)

Gas fired CHP unit (4)

KIWI POWER LTD Combined Heat and Power (CHP)
Inactive - 2024-25 (T-1), 2023-24 (T-1), 2022-23 (T-1) (and 1 more)
Overton Mill, Basingstoke, Hampshire RG25 3JG (3 components)

6MW Gas Turbine (2)

ENEL X UK LIMITED Combined Heat and Power (CHP)
Inactive - 2021-22 (T-1), 2020-21 (T-1)
Port Talbot, Port Talbot Works, SA13 2NG (6 components)
  • • Site based CHP ( reclassified from reciprocating engine for EMR purposes given definitions in Capacity Market Auction Guidelines ) (4)
  • • Site based CHP - note the primary fuel are Waste Gases
TATA STEEL UK LIMITED Reciprocating engines Combined Heat and Power (CHP)
Inactive - 2023-24 (T-4), 2023-24 (T-1), 2022-23 (T-3) (and 3 more)
Haxby Rd, York, YO91 1XY (9 components)
  • • CHP Unit (3)
  • • Gas fired CHP unit (2)
KIWI POWER LTD CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 6 more)
Energy Centre, St James's University Hospital, Beckett Street, Leeds, LS9 7TF. (6 components)

4.5MWe combined heat and power (CHP) natural gas fired reciprocating engine. (4)

Veolia UK Limited Combined Heat and Power (CHP)
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2021-22 (T-1) (and 2 more)
Unit 3015 Western Approach Distribution Park Govier Way Bristol BS35 4GG (6 components)

E1000 CHP unit (5)

CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED Combined Heat and Power (CHP)
0.9 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 3 more)
Unit 3016 Hereford Street Bolton BL1 8HU (6 components)

E1000 CHP (5)

CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED Combined Heat and Power (CHP)
0.9 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 3 more)
Barnsley Facilities Services Limited Estates & Facilities Department Gawber Road Barnsley S75 2EP (7 components)

1 MW CHP generation (5)

LIMEJUMP LTD Combined Heat and Power (CHP)
0.9 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 4 more)
Darent Valley Hospital, Darenth Wood Rd, Dartford, DA2 8DA (7 components)

1280 KWe Combined Heat and Power unit. (5)

CENTRICA BUSINESS SOLUTIONS UK LIMITED Combined Heat and Power (CHP)
1.1 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 4 more)
RPC Containers Limited, Haslingden Road, Guided, Blackburn, Lancashire, BB1 2PX (6 components)

CHP unit (4)

ENEL X UK LIMITED Combined Heat and Power (CHP)
1.8 MW
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1) (and 1 more)
The Ridgeway Enfield, Middlesex EN2 8JL (9 components)

On-site CHP - existing generating unit The Ridgeway Enfield, Middlesex EN2 8JL OS Grid Reference: TQ 312 980 (5)

GRIDBEYOND LIMITED Combined Heat and Power (CHP)
2.0 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 6 more)
Energy Centre, Lower Mosley Street, Manchester M2 3GX (6 components)

A 3.36MW gas fired reciprocating engine CHP. (4)

VITAL ENERGI SOLUTIONS LIMITED Combined Heat and Power (CHP)
3.0 MW
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1) (and 1 more)
Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX (6 components)
  • • VIT303 - CHP unit at Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX (3)
  • • VIT503 - CHP unit at Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX
VITAL ENERGI SOLUTIONS LIMITED Combined Heat and Power (CHP)
3.0 MW
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1) (and 1 more)
Treviscoe Dryer, Little Treviscoe, St. Austell, PL26 7QN (9 components)
  • • Gas fired CHP unit (3)
  • • Gas CHP in St. Austell (2)
KIWI POWER LTD Combined Heat and Power (CHP)
3.1 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 6 more)
Rocks Dryer, Rosvear Road, Bugle, St. Austell, PL26 8PJ (9 components)
  • • Gas CHP (3)
  • • Gas CHP in St. Austell (2)
KIWI POWER LTD Combined Heat and Power (CHP)
3.4 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 6 more)
Energy Centre Westfield London, Ariel Way, White City, London, W12 7GF (20 components)

A gas engine CHP site providing electricity & heat to the associated development (5)

E.ON UK PLC Combined Heat and Power (CHP)
3.6 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Par CHP, Par Docks, Par, St. Austell, PL24 2BN (9 components)
  • • CHP unit (3)
  • • Gas CHP located in St. Austell (2)
KIWI POWER LTD Combined Heat and Power (CHP)
3.6 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 6 more)
Cranbrook CHP2, Honiton Road, Cranbrook, Exeter, EX5 2DX (10 components)

A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP (5)

Waterswallows Energy Limited Combined Heat and Power (CHP)
3.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Aventine Way, Glebe Farm Industrial Estate, Rugby, CV21 1HA (12 components)

A gas CHP supplying a manufacturing facility (5)

E.ON UK PLC Combined Heat and Power (CHP)
4.0 MW
Inactive - 2027-28 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 3 more)
Burnside Mills, Kendal,Cumbria,LA9 6PZ (6 components)

Gas fired CHP unit (5)

KIWI POWER LTD Combined Heat and Power (CHP)
5.5 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 3 more)
Samian Way, Aston, Clinton ,Aylesbury, England, HP22 5EZ (23 components)

CHP unit (5)

ENEL X UK LIMITED Combined Heat and Power (CHP)
7.2 MW
Inactive - 2025-26 (T-1), 2024-25 (T-4), 2024-25 (T-1) (and 7 more)
London Rd, Purfleet RM19 1SD (16 components)

Gas-fired CHP unit (5)

ENEL X UK LIMITED CHP and autogeneration Combined Heat and Power (CHP)
7.3 MW
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-4) (and 7 more)
Denison Road, Selby, North Yorkshire YO8 8AN (15 components)

One 8 MWe Gas Turbine Cogeneration Unit (GT2) (5)

Plutus Energy LTD CHP and autogeneration Combined Heat and Power (CHP)
7.5 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 7 more)
Showing locations 1 - 50 of 60