-
• TG1B is part of the aggregated CMU EMD-19, which is made up of 2 Generating Units of which TG1B is …
(6)
-
• Unit 3 is part of the aggregated CMU EMD-19, which is made up of 2 Generating Units of which Unit …
(6)
-
• TG1B is part of the aggregated CMU EMD-18, which is made up of 2 Generating Units of which TG1B is …
(2)
-
• ... and 7 more unique descriptions
300.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 9 more)
-
• Power Station for Paper plant made up of 1x35MW Gas engine plus 1x12MW steam turbine
(4)
-
• Power Station for Paper plant made up of 1x35MW Gas engine
41.3 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 7 more)
-
• Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
(10)
-
• Gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
(2)
-
• One 22.9MVA gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural …
(2)
26.7 MW
Inactive -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 11 more)
-
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA
(3)
-
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA.
(2)
17.3 MW
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-4)
(and 7 more)
-
• Gas Turbine CHP GT001B
(3)
-
• Steam Turbine CHP
(2)
15.3 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 7 more)
14.710 MW CHP generation
(5)
13.4 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 6 more)
-
• Gas engine
(3)
-
• Gas turbine
(2)
11.2 MW
Inactive -
2024-25 (T-4),
2024-25 (T-1),
2023-24 (T-4)
(and 7 more)
-
• 2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW
(2)
-
• 2X gas reciprocating engines with a total gross power capacity of 3.973 MW
(2)
-
• 2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW and a net power capacity of 3.953 …
10.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
(and 6 more)
-
• 2 x Gas reciprocating engines with a total rated gross power capacity of 5.362 MW and total net power capacity …
(2)
-
• 2 x Gas reciprocating engines with a total rated gross power capacity of 5.362 MW and total net power capacity …
(2)
-
• 2 x Gas reciprocating engines with a total rated gross power capacity of 5.241 MW and total net power capacity …
9.6 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 7 more)
-
• One Jenbacher CHP engine with a generation capacity of 3.36 MW
(10)
-
• The new Energy Centre will consist of one Jenbacher CHP engine with a generation capacity of 3.36 MW and a …
9.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 9 more)
Gas CHP in a horticultural environment providing heat & electricity to site and exporting excess.
(9)
8.7 MW
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 8 more)
On-site CHP - existing generating unit Pond Street London OS Grid Reference: TQ 272 854 NW3 2QG
(5)
8.1 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 6 more)
Turbomach M50 Natural Gas fired CHP unit
(5)
7.6 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-4)
(and 7 more)
-
• 8.300MW Gas Turbine installation
(3)
-
• 8.3MW Gas Turbine installation
(2)
7.6 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
One 8 MWe Gas Turbine Cogeneration Unit (GT2)
(5)
7.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 7 more)
Gas-fired CHP unit
(5)
7.3 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-4)
(and 7 more)
CHP unit
(5)
7.2 MW
Inactive -
2025-26 (T-1),
2024-25 (T-4),
2024-25 (T-1)
(and 7 more)
Gas Turbine CHP GT001A
(5)
5.9 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 5 more)
CHP engine in a horticultural environment, natural gas, no aux load
(9)
5.8 MW
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 8 more)
Turbomach M50 Natural Gas fired CHP unit
(5)
4.0 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-4)
(and 7 more)
A gas CHP supplying a manufacturing facility
(5)
4.0 MW
Inactive -
2027-28 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 3 more)
A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP
(5)
3.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• CHP unit
(3)
-
• Gas CHP located in St. Austell
(2)
3.6 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 6 more)
A gas engine CHP site providing electricity & heat to the associated development
(5)
3.6 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Energy Centre with gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.
(5)
3.5 MW
Inactive -
2027-28 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 7 more)
-
• 1 x Gas reciprocating engine with a total rated gross power capacity of 2.000 MW and total net power capacity …
(2)
-
• 1 x Gas reciprocating engine with a total rated gross power capacity of 2.000 MW and total net power capacity …
-
• 1 x Gas reciprocating engine with a total rated gross power capacity of 2.185 MW and total net power capacity …
-
• ... and 1 more unique descriptions
3.4 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 7 more)
-
• Gas CHP
(3)
-
• Gas CHP in St. Austell
(2)
3.4 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 6 more)
3.350 MW gas engine CHP plant
(5)
3.1 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 6 more)
-
• Gas fired CHP unit
(3)
-
• Gas CHP in St. Austell
(2)
3.1 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 6 more)
On-site CHP - existing generating unit The Ridgeway Enfield, Middlesex EN2 8JL OS Grid Reference: TQ 312 980
(5)
2.0 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 6 more)
-
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(8)
-
• Gas fired CHP unit
(4)
-
• CHP Unit
-
• ... and 1 more unique descriptions
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 8 more)
On-site existing CHP generating unit
(5)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 6 more)
On-site existing CHP generating unit
(5)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 7 more)
On-site existing CHP generating unit
(5)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 6 more)
Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the …
(5)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 4 more)
-
• 2.8MWe back pressure steam turbine
(3)
-
• 6.46 MWe Ruston Tornado Gas Turbine (Siemens SG200)
(2)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-4)
(and 7 more)
gas-fired CHP unit
(5)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-4)
(and 7 more)
On-site existing CHP generating unit
(5)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 6 more)
-
• Gas fired CHP unit
(4)
-
• CHP unit
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 5 more)
Two gas CHP in a horticultural environment with no aux load
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 6 more)
-
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
(3)
-
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
(2)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 7 more)
-
• Gas fired CHP unit
(4)
-
• CHP unit
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 5 more)
-
• Gas fired CHP unit
(4)
-
• CHP plant
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 4 more)
-
• One of six CHP units at University of Warwick, Coventry, CV4 7AL
(3)
-
• One of six CHP units at University of Warwick, Coventry, CV4 7AL.
(2)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 4 more)
On-site existing CHP generating unit
(5)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-3)
(and 4 more)
CHP and autogeneration
(5)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 5 more)
A gas engine CHP site providing steam and electricity to an industrial unit
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 4 more)
-
• Gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh …
(2)
-
• The component consists of gas CHP (2679kW and 2004kW) servicing the electricity and heat requirements for Aldergrove Nursery, one of …
(2)
-
• The component consists of gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites …
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 7 more)
CHP
(5)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 4 more)
On-site existing CHP generating unit
(5)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 7 more)