• West Burton B Power Station CMU 1 WB1-19= 100% T_WBURB-1
-
• West Burton B Power Station CMU 1 WB1-20= 100% T_WBURB-1
-
• West Burton B Power Station CMU 2 WB2-19= 100% T_WBURB-2
-
• ... and 2 more unique descriptions
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 1 more)
New Build Combined Cycle Gas Turbine plant to be installed on designated land at the Drax Power Station site
Inactive -
2023-24 (T-4)
Combined Cycle Gas Turbine plant
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-3)
-
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT Export MPAN: 1574000199083
(3)
-
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
-
• Unit 1 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam …
(3)
-
• Unit 2 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam …
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2021-22 (T-4)
(and 1 more)
New Build gas fuelled generation station.
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-3)
Existing CCGT unit
(4)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
Small Combined Cycle Gas Turbine plant Registered capacity 75MVA or 60MW at 0.8PF.
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
Combined Cycle Gas Turbine
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
-
• CCGT Unit
-
• CCGT Unit 1 (connected as G1)
-
• CCGT Unit 2 (connected as G2)
-
• ... and 1 more unique descriptions
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
Centrica Barry Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station.
(5)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 3 more)
Combined Cycle Gas Turbine plant
(4)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
New build Combined Cycle Gas Turbine plant
Inactive -
2022-23 (T-4)
NEW BUILD GAS FUELLED GENERATING STATION
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
-
• New build Combined Cycle Gas Turbine plant
-
• New build Open Cycle Gas Turbine plant
-
• New reciprocating generating plant.
Inactive -
2021-22 (T-4)
-
• Knottingley Unit 1 is a combined cycle gas turbine generating unit
(2)
-
• Knottingly Unit 2 is a combined cycle gas turbine generating unit
(2)
Inactive -
2021-22 (T-4),
2020-21 (T-4)
-
• Single combined cycle gas turbine
-
• Single combined cycle gas turbine with supplementary firing
Inactive -
2021-22 (T-4),
2020-21 (T-4)
A new combined cycle power station comprising the latest technology gas turbine(s), heat recovery steam generator(s), steam turbine(s) and associated balance of plant. This will be constructed on brownfield land …
(2)
Inactive -
2021-22 (T-4),
2020-21 (T-4)
-
• Keadby GT3
(3)
-
• Keadby 1 CCGT
-
• Keadby Unit 1
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2017-18 (T-1)
-
• Hythe Power Station - Auxiliary load behind boundary meter
(2)
-
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode.
-
• Three (3) Reciprocating Gas Engines
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2017-18 (T-1)
One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT
Inactive -
2021-22 (T-4)
A Prospective New Build Combined Cycle Gas Turbine (CCGT) electricity generating station
(2)
Inactive -
2019-20 (T-1),
2018-19 (T-1)
-
• Deeside CCGT Power Station.
-
• Deeside CCGT Power Station. Please note: The TEC deferral box has been ticked on the CMU Main Page. The text …
Inactive -
2018-19 (T-1),
2017-18 (T-1)
-
• A new combined cycle power station comprising gas turbine(s), heat recovery steam generator(s), steam turbine(s) and associated balance of plant. …
-
• A new combined cycle power station comprising the latest technology gas turbine(s), heat recovery steam generator(s), steam turbine(s) and associated …
-
• A new open cycle power station comprising gas turbine(s) and associated balance of plant. This will be constructed on brownfield …
Inactive -
2021-22 (T-4),
2020-21 (T-4)
Tees CCPP is a 542.6MW CCGT unit to be installed on designated land within the (former ICI) Wilton Site this will be connected to Greystones 275kV 'A' Substation and Greystones …
(2)
Inactive -
2024-25 (T-4),
2023-24 (T-4)
-
• Existing CCGT that is to be refurbished
-
• Refurbishment of existing plant
Active -
2027-28 (T-4),
2025-26 (T-4)
EP Langage Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station.
Active -
2028-29 (T-4)
-
• Combined Cycle Gas Turbine plant
(3)
-
• New build Combined Cycle Gas Turbine plant
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 3 more)
-
• Existing BAGE-1 CCGT repowered with new gas turbine and substantial BOP improvements
(2)
-
• Existing CCGT Baglan Unit 1
(2)
-
• Existing OCGT module
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 4 more)
-
• New build Combined Cycle Gas Turbine unit G1 at King's Lynn B.
(3)
-
• New build Combined Cycle Gas Turbine unit G2 at King's Lynn B.
(2)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 2 more)
Combined Cycle Gas Turbine
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-3)
EP Humber Power Station Phase 1 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.
(4)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
EP Humber Power Station Phase 2 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.
(4)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
The unit is a four on two air cooled CCGT utilizing Siemens Industrial Trent DLE aero-derivitive gas turbines. The plant will be located at Drakelow, South Derbyshire.
(4)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
2 x Natural Gas Turbine Generators, each exhausting to a single Heat Recovery Steam Generator, supplying steam to a single Steam Turbine Generator. 1 x Auxiliary Steam package boiler natural …
(2)
32.0 MW
Inactive -
2024-25 (T-1),
2023-24 (T-1)
-
• 250MW capacity system with 500MWh of batteries with all ancillary equipment to be installed on the Trafford Power Site
-
• 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
-
• 5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
-
• ... and 2 more unique descriptions
93.4 MW
Inactive -
2027-28 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 3 more)
-
• Small Combined Cycle Gas Turbine plant with registered capacity 75MVA or 60MW at 0.8PF.
(3)
-
• Small Combined Cycle Gas Turbine plant with contracted connection capacity 75MVA or 60MW at 0.8PF
(2)
112.2 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines . MSID: 7174
(3)
-
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode. MSID: …
(2)
136.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 5 more)
-
• Existing CCGT
(3)
-
• Existing CCGT to be refurbished
-
• Sutton Bridge Project: The construction at the Sutton Bridge Power CMU (23SB01), an existing Combined Cycle Gas Turbine (CCGT) plant …
773.1 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• Existing CCGT Unit
(7)
-
• Existing CCGT Unit which is to be refurbished
-
• Existing CCGT UnitSevern Power Station West Nash Road Nash Newport NP18 2BZ
773.1 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
A combined cycle gas turbine generating plant
(5)
859.8 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 4 more)
A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. …
(5)
867.7 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 3 more)
-
• EP South Humber Bank Power Station Phase 2 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.
(4)
-
• EP South Humber Bank Power Station Phase 1 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.
1047.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 1 more)
Great Yarmouth 1 - CCGT MSID: 7111
(5)
1122.9 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Single Shaft CCGT (Module 2)
(5)
1141.2 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• Combined Cycle Gas Turbine plant
(6)
-
• Existing Combined Cycle Gas Turbine plant
1157.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 4 more)
Enfield CCGT Power Station - (one unit station)
(10)
1217.9 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 8 more)
Cottam Development Centre (CDC) CCGT single unit station
(5)
1223.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
EP South Humber Bank Power Station Phase 1 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.
(3)
1481.3 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
EP Langage Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station.
(5)
1655.5 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 5 more)