Combined Cycle Gas Turbine (CCGT)

150 unique locations (1679 components) - Page 1 of 6

Active MW: 229775.30 MW
Inactive MW: 33894.12 MW
Wytch Farm, Wareham BH20 5JR (4 components) Geocoding Needed

Two gas turbines (CX501-KB7) rated at 5.3MW each.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
10.86 MW
Winnington CHP, Winnington Lane, Winnington, Northwich, Cheshire, CW8 4GX (28 components) Geocoding Needed
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor.
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
• Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
462.46 MW
Willington Power Station, Twyford Road, Willington, Derby, DE65 6PP (6 components) Geocoding Needed
• Unit 1 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire.
• Unit 1 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire. Metering of output is Net of auxillary load.
• Unit 2 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire.
Combined Cycle Gas Turbine (CCGT) Willington Power Limited New Build Generating CMU WILLINGTON C CCGT WILLINGTON C CCGT +1 more Conditional DE65
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
4307.40 MW
Whitewalls Road, Rochester, Kent, ME2 4DZ (1 component) Geocoding Needed

A series of gas generators on an existing site.

Active • 2025-26 (T-1)
18.70 MW
Whitewall Road, Rochester, Kent, ME2 4DZ (3 components) Geocoding Needed

A series of gas generators on an existing site.

Active • 2026-27 (T-4), 2024-25 (T-1) ...
56.94 MW
Weston Point CHP, INEOS Salt Works, Mersey View Road, Weston Point, Runcorn, WA7 4HB (10 components) Geocoding Needed

1 x OCGT

Open Cycle Gas Turbine (OCGT) SSE ENERGY SUPPLY LIMITED Existing Generating CMU Weston Point CHP Weston Point CHP +2 more WA7
Active • 2025-26 (T-4), 2024-25 (T-4) ...
34.78 MW
West Marsh Road, Spalding, Lincolnshire, PE11 3BB (20 components) Geocoding Needed
• A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. Each turbine is individually metered with output being the total of all three turbines net of any auxillary load.
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxiliary load.
• A new open cycle power station comprising gas turbines and associated balance of plant. This is being constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxillary load.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
4991.87 MW
West Marsh Road Spalding Lincolnshire PE11 3BB (1 component)

A new open cycle power station comprising gas turbines and associated balance of plant. This is being constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of …

Open Cycle Gas Turbine (OCGT) SPALDING ENERGY EXPANSION LIMITED New Build Generating CMU Spalding Energy Expansion PE11
Inactive • 2019-20 (T-1)
West Marsh Road, Spalding, Lincolnshire, PE11 2BB (8 components) Geocoding Needed
• A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. Each turbine is individually metered with output being the total of all three turbines net of any auxillary load.
• A new combined cycle power station comprising gas turbine(s), heat recovery steam generator(s), steam turbine(s) and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxillary load.
• A new open cycle power station comprising gas turbine(s) and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxillary load.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4736.21 MW
West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (22 components) Geocoding Needed
• West Burton B Power Station CMU 1 WB1-24= 100% T_WBURB-1
• West Burton B Power Station CMU 2 WB2-24= 100% T_WBURB-2
• West Burton B Power Station CMU 3 WB3-24= 100% T_WBURB-3
Storage (Duration 0.5h) Combined Cycle Gas Turbine (CCGT) WEST BURTON B LIMITED Existing Generating CMU West Burton B Power Station CMU 1 West Burton B Power Station CMU 1 +17 more DN22
Active • 2028-29 (T-4), 2027-28 (T-4) ...
7351.35 MW
Victory Road, Derby, Derbyshire, DE24 9HX (8 components) Geocoding Needed
• Existing OCGT.
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines WHITETOWER ENERGY LIMITED Existing Generating CMU Derby Cogen Ltd Derby Cogen Ltd +5 more DE24
Active • 2028-29 (T-4), 2027-28 (T-4) ...
352.98 MW
Units 1-4, Hirwaun Industrial Estate, Hirwaun, Aberdare, S Wales, CF44 9UY (5 components) Geocoding Needed
• A new 299MW Open Cycle Gas Turbine peaking plant
• A new Open Cycle Gas Turbine peaking plant
Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines (Fuel Type - Gas) HIRWAUN POWER LIMITED New Build Generating CMU Hirwaun Power OCGT Hirwaun Power OCGT +2 more CF44
Active • 2024-25 (T-4), 2023-24 (T-4) ...
1136.65 MW
Ty Coch Farm Greenfield Holywell CH8 7HT (8 components) Geocoding Needed

Gas fuelled generation plant

Active • 2024-25 (T-4), 2023-24 (T-4) ...
38.04 MW
Ty Coch Farm Greenfield Holywell CH87HT (8 components)

Gas fuelled generation plant (3)

Open Cycle Gas Turbine (OCGT) PINXTON ENERGY LIMITED TY COCH ENERGY LIMITED New Build Generating CMU PIN111 TYC111 Conditional CH8
Active • 2024-25 (T-4), 2023-24 (T-4) ...
TWINYARDS FARM HUTHWAITE LANE ALFRETON DE55 5HW (2 components) Geocoding Needed
• NEW BUILD GAS FUELLED GENERATING STATION
• NEW BUILD GAS FUELLED GENERATION STATION
Open Cycle Gas Turbine (OCGT) HUTHWAITE SOLAR FARM LIMITED New Build Generating CMU HUT111 HUTHWAITE Not Prequalified DE55
Inactive • 2020-21 (T-4), 2019-20 (T-1)
9.72 MW
Thorpe Marsh Power Station, nr Barnby Dun, Doncaster DN3 1ET (4 components) Geocoding Needed
• CCGT Unit
• CCGT Unit 1 (connected as G1)
• New combined cycle gas turbine power station comprising two units of the latest technology gas turbines, heat recovery steam generators, steam turbines and associated balance of plant. This will be constructed nr Barnby Dun
Combined Cycle Gas Turbine (CCGT) Thorpe Marsh Power Limited New Build Generating CMU Thorpe Marsh CCGT Thorpe Marsh CCGT +1 more Conditional DN3
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
4320.00 MW
The Yard, Holme Road, Stoney Holme, Burnley, BB12 0BJ (4 components) Geocoding Needed

3 x 2MW gas reciprocating engines used for power generation, with associated infrastructure

Open Cycle Gas Turbine (OCGT) GAS GENERATION BURNLEY LIMITED New Build Generating CMU Gas Generation Burnley 2 Gas Generation Burnley 2 +2 more BB12
Active • 2024-25 (T-4), 2023-24 (T-4) ...
22.82 MW
The Manorway, Stanford-le-Hope, Essex, SS17 9LP (11 components) Geocoding Needed
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is Net of auxillary load.
• A new open cycle power station comprising gas turbine(s) and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is Net of auxillary load.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
884.02 MW
The Manor Way, Stanford-le-Hope, Essex, SS17 9GN (11 components) Geocoding Needed

A CCGT station consisting of two Alstom GT26 gas turbines and a steam turbine and is based near Stanford-le-hope in Essex, England. Each turbine is individually metered with output being …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
7186.80 MW
Sutton Bridge Power Station, Centenary Way, Sutton Bridge, Lincolnshire, PE12 9TF (16 components) Geocoding Needed
• Existing CCGT
• Existing CCGT to be refurbished
• Sutton Bridge Project: The construction at the Sutton Bridge Power CMU (23SB01), an existing Combined Cycle Gas Turbine (CCGT) plant will include both installation of new generating equipment and the upgrade or refurbishment of the current equipment at the site. The construction will include the installation of new combustion turbines (CT), installation of new CT generators, installation of a new steam turbine (ST) and ST generator, refurbishment of the heat recovery steam generators (HRSGs), installation of a new distributed control system (DCS) and balance of plant refurbishments.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4290.96 MW
Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF (3 components)

Existing CCGT (3)

Combined Cycle Gas Turbine (CCGT) SUTTON BRIDGE POWER GENERATION Existing Generating CMU Sutton Bridge Sutton Bridge +1 more PE12
Active • 2025-26 (T-1), 2024-25 (T-1) ...
1551.59 MW
Staythorpe Power Station, Staythorpe, Newark, Nottinghamshire, NG23 5PS (44 components) Geocoding Needed
• Staythorpe 1 - CCGT MSID: 7210
• Staythorpe 2 - CCGT MSID: 7210
• Staythorpe 4 - CCGT MSID: 7210
Active • 2028-29 (T-4), 2027-28 (T-4) ...
14917.07 MW
Site of the former Teesside Power Station, Greystone Road, Grangetown, Middlesbrough, TS6 8JF (2 components) Geocoding Needed

Tees CCPP is a 542.6MW CCGT unit to be installed on designated land within the (former ICI) Wilton Site this will be connected to Greystones 275kV 'A' Substation and Greystones …

Active • 2024-25 (T-4), 2023-24 (T-4)
976.68 MW
Shottentons Farm, Pecks Hill, Nazeing, Essex, EN9 2NY (8 components) Geocoding Needed

Gas fuelled CHP generation plant

Active • 2027-28 (T-4), 2025-26 (T-4) ...
28.50 MW
Severn Power Station, West Nash Road, Newport, NP18 2BZ (8 components) Geocoding Needed

Existing CCGT unit

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
1519.80 MW
Loading map...
Showing 25 locations