Combined Cycle Gas Turbine (CCGT)

32 unique locations 397 components 0 companies Page 1 of 1
Map View
Pembroke Power Station Pembroke Dyfed SA71 5SS (55 components)
  • • Pembroke 11 - CCGT MSID: 7237
  • • Pembroke 21 - CCGT MSID: 7237
  • • Pembroke 31 - CCGT MSID: 7237
RWE GENERATION UK PLC Combined Cycle Gas Turbine (CCGT)
6183.4 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Staythorpe Power Station Staythorpe Newark Nottinghamshire NG23 5PS (44 components)
  • • Staythorpe 1 - CCGT MSID: 7210
  • • Staythorpe 2 - CCGT MSID: 7210
  • • Staythorpe 3 - CCGT MSID: 7210
RWE GENERATION UK PLC Combined Cycle Gas Turbine (CCGT)
4893.4 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU (24 components)
  • • Didcot B5 - CCGT MSID: 4055 (2)
  • • Didcot B6 - CCGT MSID: 4055
RWE GENERATION UK PLC Combined Cycle Gas Turbine (CCGT)
4108.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Kelsterton Road, Connah's Quay, Flintshire CH5 4BP (62 components)
  • • Connah's Quay PS Unit 1 CCGT
  • • Connah's Quay PS Unit 2 CCGT
  • • Connah's Quay PS Unit 3 CCGT
UNIPER UK LIMITED Combined Cycle Gas Turbine (CCGT)
3889.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Kingsnorth, Hoo, Rochester, Kent, ME3 9TX (11 components)
  • • Combined Cycle Gas Turbine plant (2)
  • • A new combined cycle gas turbine (unit 5) at Damhead Creek 2 power plant
VPI POWER LIMITED Combined Cycle Gas Turbine (CCGT)
3868.0 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Keadby Power Station Trentside, Keadby, Scunthorpe, DN17 3EF (33 components)
  • • Keadby 1 CCGT (2)
  • • Keadby GT3
KEADBY GENERATION LIMITED Open Cycle Gas Turbine (OCGT) Combined Cycle Gas Turbine (CCGT)
3519.9 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Marchwood Power, Marchwood Industrial Park, Oceanic Way, Marchwood, Southampton, SO40 4BD (12 components)

Marchwood CCGT (3)

SSE ENERGY SUPPLY LIMITED Combined Cycle Gas Turbine (CCGT)
3356.4 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Peterhead Power Station, Peterhead, Aberdeenshire, AB42 3BZ (15 components)

Peterhead CCGT (3)

SSE GENERATION LIMITED Combined Cycle Gas Turbine (CCGT)
3242.3 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (49 components)
  • • New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
  • • Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 7)
Plutus Energy LTD Coal Storage Coal/biomass Storage (Duration 2h) Storage (Duration 4h) Open Cycle Gas Turbine (OCGT) Combined Cycle Gas Turbine (CCGT)
2549.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Seabank Power Limited Severn Road, Hallen Bristol BS10 7SP (11 components)

Multi Shaft CCGT (Module 1) (3)

SEABANK POWER LIMITED Combined Cycle Gas Turbine (CCGT)
2260.4 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Cow Hey Lane, Runcorn, Cheshire, WA7 4FZ (12 components)

A CCGT station consisting of two Alstom GT26A gas turbines, with an Alstom heat recovery steam generator each that produces steam for one ABB steam turbine and is based near … (3)

ROCKSAVAGE POWER COMPANY, LTD. Combined Cycle Gas Turbine (CCGT)
2236.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
The Manor Way, Stanford-le-Hope, Essex, SS17 9GN (11 components)

A CCGT station consisting of two Alstom GT26 gas turbines and a steam turbine and is based near Stanford-le-hope in Essex, England. Each turbine is individually metered with output being … (3)

CORYTON ENERGY COMPANY, LTD. Combined Cycle Gas Turbine (CCGT)
2191.0 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Little Barford Power Station Little Barford St Neots PE19 6YT (22 components)
  • • Little Barford 1 CCGT MSID: 4052 (2)
  • • Little Barford 1 OCGT . fuel type is distillate MSID: 4052
RWE GENERATION UK PLC Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines Combined Cycle Gas Turbine (CCGT)
2060.9 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
EP Langage Power Station, Holland Road, Plymouth, PL7 5AW. (8 components)

EP Langage Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station. (3)

EP LANGAGE LIMITED Combined Cycle Gas Turbine (CCGT)
1655.5 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 2 more)
Cottam Development Centre Power Station Cottam Retford DN22 0TF (9 components)

Cottam Development Centre (CDC) CCGT single unit station (3)

Uniper Global Commodities SE Combined Cycle Gas Turbine (CCGT)
1223.3 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
111 Brancroft Way Enfield Middlesex EN3 7PL (12 components)

Enfield CCGT Power Station - (one unit station) (3)

UNIPER GLOBAL COMMODITIES SE Combined Cycle Gas Turbine (CCGT)
1217.9 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Basin Road South, Portslade, East Sussex, BN41 1WF (7 components)

Combined Cycle Gas Turbine plant (3)

VPI POWER LIMITED Combined Cycle Gas Turbine (CCGT)
1157.5 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Seabank Power Limited Severn Road, Hallen, Bristol BS10 7SP (11 components)

Single Shaft CCGT (Module 2) (3)

SEABANK POWER LIMITED Combined Cycle Gas Turbine (CCGT)
1141.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Great Yarmouth Power Station South Denes Road Great Yarmouth Norfolk NR30 3PY (11 components)

Great Yarmouth 1 - CCGT MSID: 7111 (3)

RWE GENERATION UK PLC Combined Cycle Gas Turbine (CCGT)
1122.9 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
West Marsh Road, Spalding, Lincolnshire, PE11 3BB (6 components)

A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. … (3)

SPALDING ENERGY COMPANY, LTD. Combined Cycle Gas Turbine (CCGT)
867.7 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 2 more)
Clough Lane North Killingholme North Lincolnshire DN40 3JP (7 components)

A combined cycle gas turbine generating plant (3)

C.GEN KILLINGHOLME LIMITED Combined Cycle Gas Turbine (CCGT)
859.8 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 2 more)
Hythe Power Station Charleston Road Hardley Hythe Southampton SO45 3BP (8 components)

Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines . MSID: 7174 (3)

RWE GENERATION UK PLC Combined Cycle Gas Turbine (CCGT)
136.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
132 Manchester Road, Carrington, Manchester, M31 4AY (17 components)
  • • 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
  • • 5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
  • • One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site
WAINSTONES ENERGY LIMITED Reciprocating engines Storage (Duration 2h) Storage (Duration 5h) Combined Cycle Gas Turbine (CCGT)
93.4 MW
Inactive - 2027-28 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 2 more)
EP Humber Power Station, South Marsh Road, Stallingborough, DN41 8BZ (5 components)

EP Humber Power Station Phase 2 is a Combined Cycle Gas Turbine (CCGT) electricity generating station. (3)

EP SHB LIMITED Combined Cycle Gas Turbine (CCGT)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 2 more)
EP Humber Power Station, South Marsh Road, Stallingborough, DN41 8BZ. (5 components)

EP Humber Power Station Phase 1 is a Combined Cycle Gas Turbine (CCGT) electricity generating station. (3)

EP SHB LIMITED Combined Cycle Gas Turbine (CCGT)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 2 more)
Drakelow Power Station, Burton on Trent, DE15 9TZ (5 components)

The unit is a four on two air cooled CCGT utilizing Siemens Industrial Trent DLE aero-derivitive gas turbines. The plant will be located at Drakelow, South Derbyshire. (3)

Powersite DL Ltd Combined Cycle Gas Turbine (CCGT)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 2 more)
King's Lynn B Power Station, Willow Road, Willows Business Park, King?s Lynn, PE34 3RD, Norfolk (9 components)
  • • New build Combined Cycle Gas Turbine unit G1 at King's Lynn B. (2)
  • • New build Combined Cycle Gas Turbine unit G2 at King's Lynn B.
EP UK POWER DEVELOPMENT LTD Combined Cycle Gas Turbine (CCGT)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 2 more)
Baglan Bay Power Station Baglan Energy Park Port Talbot SA12 7GE (20 components)
  • • Existing CCGT Baglan Unit 1 (2)
  • • Existing BAGE-1 CCGT repowered with new gas turbine and substantial BOP improvements
Calon Energy Limited Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines Combined Cycle Gas Turbine (CCGT)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 2 more)
Site of the former Teesside Power Station Greystone Road Grangetown Middlesbrough TS6 8JF (2 components)

Tees CCPP is a 542.6MW CCGT unit to be installed on designated land within the (former ICI) Wilton Site this will be connected to Greystones 275kV 'A' Substation and Greystones … (2)

Sembcorp Utilities (UK) Limited Combined Cycle Gas Turbine (CCGT)
Inactive - 2024-25 (T-4), 2023-24 (T-4)
1 Ratty's Lane, Hoddesdon, Hertsfordshire, EN11 0RF (3 components)

Combined Cycle Gas Turbine (3)

VPI POWER LIMITED Combined Cycle Gas Turbine (CCGT)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-3)
EDF Energy (Thermal Generation) Limited, West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (12 components)
  • • West Burton B Power Station CMU 1 WB1-20= 100% T_WBURB-1
  • • West Burton B Power Station CMU 2 WB2-20= 100% T_WBURB-2
  • • West Burton B Power Station CMU 3 WB3-20= 100% T_WBURB-3
WEST BURTON B LIMITED Combined Cycle Gas Turbine (CCGT)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 1 more)
Showing locations 1 - 32 of 32