Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Combined Cycle Gas Turbine (CCGT)

8 unique locations 113 components 0 companies Page 1 of 1
Map View
Keadby Power Station Trentside, Keadby, Scunthorpe, DN17 3EF (33 components)
  • • Keadby 1 CCGT (3)
  • • Keadby GT3 (2)
KEADBY GENERATION LIMITED Open Cycle Gas Turbine (OCGT) Combined Cycle Gas Turbine (CCGT)
3519.9 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Medway Power Station, Rochester, Medway, ME3 0AG (18 components)

Medway CCGT (5)

MEDWAY POWER LIMITED Combined Cycle Gas Turbine (CCGT)
3352.9 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Cow Hey Lane, Runcorn, Cheshire, WA7 4FZ (12 components)

A CCGT station consisting of two Alstom GT26A gas turbines, with an Alstom heat recovery steam generator each that produces steam for one ABB steam turbine and is based near … (5)

ROCKSAVAGE POWER COMPANY, LTD. Combined Cycle Gas Turbine (CCGT)
2236.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Mitchell Road, Phoenix Parkway, Corby, Northamptonshire, NN17 5QT (29 components)
  • • The CMU is a Open Cycle Gas Turbine (OCGT) (2)
  • • The CMU is a gas plant, capable of running in either OCGT or CCGT modes (2)
  • • The CMU is a combined cycle gas turbine
CORBY POWER LIMITED Open Cycle Gas Turbine (OCGT) Combined Cycle Gas Turbine (CCGT)
1943.0 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Severn Power Station West Nash Road Nash Newport NP18 2BZ (17 components)
  • • Existing CCGT Unit (7)
  • • Existing CCGT Unit which is to be refurbished
  • • Existing CCGT UnitSevern Power Station West Nash Road Nash Newport NP18 2BZ
SEVERN POWER LIMITED Combined Cycle Gas Turbine (CCGT)
773.1 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 6 more)
Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF (17 components)
  • • Existing CCGT (3)
  • • Existing CCGT to be refurbished
  • • Sutton Bridge Project: The construction at the Sutton Bridge Power CMU (23SB01), an existing Combined Cycle Gas Turbine (CCGT) plant …
SUTTON BRIDGE POWER GENERATION Combined Cycle Gas Turbine (CCGT)
773.1 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Livesey Branch Rd, Feniscowles, Blackburn, Lancashire, BB2 5HX (10 components)
  • • Small Combined Cycle Gas Turbine plant with registered capacity 75MVA or 60MW at 0.8PF. (3)
  • • Small Combined Cycle Gas Turbine plant with contracted connection capacity 75MVA or 60MW at 0.8PF (2)
VPI POWER LIMITED Combined Cycle Gas Turbine (CCGT)
112.2 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Huntsman Drive, Seal Sands, TS2 1TT (3 components)

2 x Natural Gas Turbine Generators, each exhausting to a single Heat Recovery Steam Generator, supplying steam to a single Steam Turbine Generator. 1 x Auxiliary Steam package boiler natural … (2)

E.ON UK Plc Combined Cycle Gas Turbine (CCGT)
32.0 MW
Inactive - 2024-25 (T-1), 2023-24 (T-1)
Showing locations 1 - 8 of 8