-
• Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
-
• Grain B CCGT Unit 7 Grain B power station provides heat to the Grain LNG regasification facility.
-
• Grain B CCGT Unit 8. Grain B power station provides heat to the Grain LNG regasification facility.
4000.3 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Gas CHP on South bank of river Humber providing electricity and industrial steam
(2)
-
• Battery storage unit
3439.5 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Unit 1 at Saltend Power Station
-
• Unit 2 at Saltend Power Station
-
• Unit 3 at Saltend Power Station
3107.9 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at …
(2)
-
• Unit 5 is a Cogeneration unit which produces both steam and power. Unit 5 is the largest generating unit at …
379.8 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• TG1B is part of the aggregated CMU EMD-19, which is made up of 2 Generating Units of which TG1B is …
-
• TG1B is part of the aggregated CMU EMD244, which is made up of 2 Generating Units of which TG1B is …
-
• Unit 3 is part of the aggregated CMU EMD244, which is made up of 2 Generating Units of which Unit …
300.5 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
CHP Plant connected to Private Wire System (operated by INEOS Infrastructure (Grangemouth) Limited) with Connection to NETS
(3)
259.8 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 2 more)
(Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). Unit is a OCGT and Steam Turbine in CHP Configuration within the (former ICI) …
(3)
184.4 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
The CMU is a gas fired CCGT CHP
(3)
166.1 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
The CMU is a gas fired CCGT CHP
(3)
126.0 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383
(3)
122.3 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor.
(2)
-
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
119.6 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S26G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
(3)
116.4 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Siemens SGT200 based CHP
-
• Solar T70 Based CHP System
-
• Solar T70 based CHP system
61.6 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• existing on site CHP
(2)
-
• existing onsite CHP
46.2 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 2 more)
The CMU Component will have a connection capacity of 15MW. Gas-fired reciprocating engine will be the technology used.
(3)
41.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
Power Station for Paper plant made up of 1x35MW Gas engine plus 1x12MW steam turbine
(3)
41.3 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
-
• existing CHP on site.
(2)
-
• existing on site CHP
28.4 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 2 more)
Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
(3)
26.7 MW
Inactive -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 2 more)
This is an existing CHP
(3)
21.8 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
A site with two gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network.
(3)
21.5 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(2)
-
• existing CHP on site
21.0 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
Siemens SGT200 Based CHP
(3)
19.6 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
Gas fired CHP unit
(3)
19.5 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 2 more)
The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
(3)
18.4 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
Existing Generation on existing site - CHP
(3)
18.2 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 2 more)
-
• Gas Turbine CHP GT001B
(2)
-
• Steam Turbine CHP
15.3 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
Existing Generation on existing site - CHP
(3)
14.8 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 2 more)
Gas Turbine Cogeneration Unit GT3
(3)
14.0 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
14.710 MW CHP generation
(3)
13.4 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 2 more)
-
• A gas fuelled CHP plant
(2)
-
• A gas fuelled Combined Heat and Power plant
12.8 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 1 more)
-
• A 4.5MW gas fired reciprocating engine CHP (Engine 1).
(2)
-
• A 4.5MW gas fired reciprocating engine CHP (Engine 2).
12.2 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
-
• 2MW gas CHP engine in a horticultural environment
-
• One 1.5 MW gas CHP engine in a horticultural environment
-
• One 2MW gas CHP engine in a horticultural environment
10.0 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• 2 x Gas reciprocating engines with a total rated gross power capacity of 5.362 MW and total net power capacity …
(2)
-
• 2 x Gas reciprocating engines with a total rated gross power capacity of 5.362 MW and total net power capacity …
9.6 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 2 more)
Callington - Existing Site CHP unit
(3)
9.5 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
One Jenbacher CHP engine with a generation capacity of 3.36 MW
(3)
9.3 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• CHP at a horticultural environment.
-
• CHP at horticultural site
-
• Gas CHP engines in commercial horticultural environment with no auxilliary load
9.3 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be …
(2)
-
• The CMU Component will have a connection capacity of 3.376MW. Gas-fired reciprocating engine will be the technology used.
9.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
A gas fuelled Combined heat and Power plant
(3)
9.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 1 more)
Energy Centre with 2 x1.5MW gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.
(3)
8.4 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-1)
(and 2 more)
A site with one gas turbine CHP, providing steam and electricity to Queens Medical Centre in Nottingham
(3)
8.1 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 2 more)
On-site CHP - existing generating unit Pond Street London OS Grid Reference: TQ 272 854 NW3 2QG
(3)
8.1 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 2 more)
8.300MW Gas Turbine installation
(3)
7.6 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 2 more)
One 8 MWe Gas Turbine Cogeneration Unit (GT2)
(3)
7.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
-
• A 13MW New Build Battery Storage site
-
• A 6MW New Build CHP site
-
• A New Build Battery Storage site
7.1 MW
Active -
2026-27 (T-4),
2024-25 (T-4)
The CMU component will have a connection capacity of 7.5MW. Gas-fired reciprocating engine will be the technology used
6.9 MW
Active -
2026-27 (T-4)
CHP Engine 3.360MW
(3)
6.1 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 2 more)
Gas Turbine CHP GT001A
(3)
5.9 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
Gas Fired CHP
(3)
5.9 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2023-24 (T-1)
Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
(3)
5.6 MW
Inactive -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 2 more)
District heating implementation of two gas CHP engines with no auxilliary load
(3)
5.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)