Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Combined Heat and Power (CHP)

29 unique locations 142 components 0 companies Page 1 of 1
Map View
COFELY Great Coates, Grimsby, DN31 2TT (40 components)
  • • Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to … (2)
  • • Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to …
INDUSTRIAL ENERGY SERVICES LIMITED CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2020-21 (T-4), 2019-20 (T-1), 2018-19 (T-1) (and 2 more)
Land off Ely Road, Chittering, Cambridge, Cambridgeshire, CB25 9PN (5 components)
  • • Gas-fired reciprocating engines fitted with heat and CO2 recovery equipment, plus transformers, switch gear and associated controls with a total …
  • • Gas-fired reciprocating engines fitted with heat and CO2 recovery equipment, plus transformers, switch gear and associated controls with a total …
  • • Gas-fired reciprocating engines fitted with heat and CO2 recovery equipment, plus transformers, switchgear and associated controls with a total connection …
FENLAND GLASSHOUSE LIMITED Combined Heat and Power (CHP)
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2020-21 (T-4)
Birmingham Children?s Hospital, Steelhouse Lane, Birmingham, B4 6NH (5 components)

1.6MW Combined Heat and Power Plant at Birmingham Children Hospital (3)

BIRMINGHAM DISTRICT ENERGY COMPANY LIMITED Combined Heat and Power (CHP)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2020-21 (T-4) (and 1 more)
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO30 3AR (15 components)
  • • The CMU component JENBA1 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% …
  • • The CMU component JENBA2 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% …
  • • The CMU component JENBA3 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% …
THE ISLE OF WIGHT ENERGY COMPANY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 2 more)
DS Smith Paper Limited, Kemsley Paper Mill, Sittingbourne, Kent, ME10 2TD (14 components)
  • • A gas turbine generating unit, part of a CHP which supplies heat & power to a paper mill (2)
  • • A steam turbine generating unit, part of a CHP which supplies heat & power to a paper mill
KEMSLEY CHP LIMITED Combined Heat and Power (CHP)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-1) (and 2 more)
Fellside CHP Sellafield Ltd Seascale Cumbria CA20 1PG UK (4 components)

Fellside CHP is located in Seascale- Cumbria- UK and consists of three GE Frame 6581B gas turbines which are able to run on natural gas or distillate. The primary purpose … (3)

Nuclear Decommissioning Authority CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 1 more)
66 Molesworth Street, London SE13 7EY (8 components)

Gas fired CHP unit (3)

KIWI POWER LTD Combined Heat and Power (CHP)
Inactive - 2024-25 (T-1), 2023-24 (T-1), 2022-23 (T-1) (and 2 more)
Denmark Hill, Brixton, London, SE5 9RS (7 components)
  • • CHP unit (2)
  • • Gas fired CHP unit
KIWI POWER LTD CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2021-22 (T-1) (and 2 more)
Barnsley Facilities Services Limited Estates & Facilities Department Gawber Road Barnsley S75 2EP (4 components)

1.000 MW CHP generation (3)

LIMEJUMP LTD Combined Heat and Power (CHP)
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2020-21 (T-4) (and 1 more)
Foresterhill Health Campus, Aberdeen AB25 2AY (5 components)

A gas turbine installed at Aberdeen Royal Infirmary (3)

VITAL ENERGI SOLUTIONS LIMITED Combined Heat and Power (CHP) OCGT and Reciprocating Engines (Fuel Type - Gas)
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2021-22 (T-4) (and 2 more)
Stoneykirk Road, Stranraer, DG9 7BU (9 components)

Gas fired CHP unit (3)

KIWI POWER LTD CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2024-25 (T-1), 2023-24 (T-1), 2022-23 (T-1) (and 2 more)
Media City Prestwood Road Salford M50 2EQ (6 components)
  • • 1.800 MW CHP generation (2)
  • • 1.8 MW CHP generation
LIMEJUMP LTD Combined Heat and Power (CHP)
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 2 more)
530 London Road, Croydon CR7 7YE (5 components)

CHP (3)

KIWI POWER LTD Combined Heat and Power (CHP)
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2020-21 (T-4) (and 2 more)
Energy Centre, St James's University Hospital, Beckett Street, Leeds, LS9 7TF. (6 components)

4.5MWe combined heat and power (CHP) natural gas fired reciprocating engine. (3)

Veolia UK Limited Combined Heat and Power (CHP)
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2021-22 (T-1) (and 2 more)
Hammersmith Hospital, Du Cane Road, Shepherds Bush, London, W12 0HS (5 components)

A gas turbine CHP, providing steam and electricity to Hammersmith Hospital (3)

E.ON UK PLC Combined Heat and Power (CHP)
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2021-22 (T-1) (and 2 more)
King's Buildings, West Mains Road, Edinburgh, EH9 3JG (8 components)

One CHP, generating for site load which exceeds generating capacity. No aux load. (3)

FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 2 more)
Ottringham Road Keyingham Hull North Humberside HU12 9RX (7 components)

Eight gas CHP engines for commercial horticultural use with no auxilliary load (3)

FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 2 more)
Repton Road, Measham, Swadlincote, DE12 7DT (9 components)

Gas fired CHP unit (3)

KIWI POWER LTD CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2024-25 (T-1), 2023-24 (T-1), 2022-23 (T-1) (and 2 more)
Seal Sands, Middlesbrough, TS2 1UB (14 components)
  • • One of four SURF (Aggreko) model CHP units rated at 1375kVA (2)
  • • One of four SURF (Aggreko) model CHP units rated at 1375KVA
E.ON UK Plc CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 2 more)
Seal Sands, Middlesborough, TS2 1UB (14 components)

One of four SURF (Aggreko) model CHP units rated at 1375kVA (3)

E.ON UK Plc CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 2 more)
Energy Centre, Quarryfield Road, Gateshead NE8 3BE (10 components)
  • • 1 x 2MW CHP generator; natural gas reciprocating engine; primary fuel type = natural gas
  • • 1x2MW CHP generator: natural gas reciprocating engine. Primary fuel type = natural gas
  • • CHP in a district heating environment, providing heat & electricity to local area and exporting excess.
FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2020-21 (T-4), 2019-20 (T-1), 2018-19 (T-1) (and 1 more)
Lhoist UK Ltd Hindlow Buxton SK17 0EL (12 components)
  • • GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity to be used on site. (2)
  • • GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity.
Utility I Ltd CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 2 more)
Easter Bush Energy Centre, Bush Farm Road, Roslin, Midlothian, EH25 9RG (4 components)

Two CHP, generating for site load which exceeds generating capacity. No aux load. (3)

FLEXITRICITY LIMITED Combined Heat and Power (CHP)
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2020-21 (T-4) (and 1 more)
Blackshaw Rd, London SW17 0QT (7 components)

CHP on a hospital site (3)

DISTRIBUTED ENERGY CUSTOMER SOLUTIONS LIMITED CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2021-22 (T-4), 2020-21 (T-4), 2020-21 (T-1) (and 2 more)
James Cropper Plc, Burneside Mills, Kendal, LA9 6PZ (8 components)

Gas fired CHP Unit (3)

KIWI POWER LTD CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2020-21 (T-4), 2020-21 (T-1), 2019-20 (T-1) (and 2 more)
Eastfield Road, North Killingholme, Immingham, North Lincolnshire, DN40 3LW (35 components)
  • • Steam Driven Turbo Alternator 8G-2 6.8 MWe
  • • Steam Driven Turbo Alternator 8G1 6,8 MWe
  • • Steam Driven Turbo Alternator 8G4 7MWe (derated to 4 MWe for mechanical reasons)
Centrica Business Solutions UK Optimisation Limite CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 2 more)
Stubbins Hall Lane Waltham Abbey Essex EN9 2EE (6 components)

Gas engines 1.54MW and 1.54MW in commercial horticultural environment with no auxilliary load. Only one engine used for Capacity Market purposes (3)

FLEXITRICITY LIMITED Combined Heat and Power (CHP)
2.9 MW
Inactive - 2028-29 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 2 more)
Showing locations 1 - 29 of 29