Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Combined Cycle Gas Turbine (CCGT)

32 unique locations 450 components 0 companies Page 1 of 1
Map View
Pembroke Power Station Pembroke Dyfed SA71 5SS (55 components)
  • • Pembroke 11 - CCGT MSID: 7237
  • • Pembroke 21 - CCGT MSID: 7237
  • • Pembroke 31 - CCGT MSID: 7237
RWE GENERATION UK PLC Combined Cycle Gas Turbine (CCGT)
6183.4 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Staythorpe Power Station Staythorpe Newark Nottinghamshire NG23 5PS (44 components)
  • • Staythorpe 1 - CCGT MSID: 7210
  • • Staythorpe 2 - CCGT MSID: 7210
  • • Staythorpe 3 - CCGT MSID: 7210
RWE GENERATION UK PLC Combined Cycle Gas Turbine (CCGT)
4893.4 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU (24 components)
  • • Didcot B5 - CCGT MSID: 4055 (2)
  • • Didcot B6 - CCGT MSID: 4055
RWE GENERATION UK PLC Combined Cycle Gas Turbine (CCGT)
4108.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Kelsterton Road, Connah's Quay, Flintshire CH5 4BP (62 components)
  • • Connah's Quay PS Unit 1 CCGT
  • • Connah's Quay PS Unit 2 CCGT
  • • Connah's Quay PS Unit 3 CCGT
UNIPER UK LIMITED Combined Cycle Gas Turbine (CCGT)
3889.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Kingsnorth, Hoo, Rochester, Kent, ME3 9TX (11 components)
  • • Combined Cycle Gas Turbine plant (2)
  • • A new combined cycle gas turbine (unit 5) at Damhead Creek 2 power plant
VPI POWER LIMITED Combined Cycle Gas Turbine (CCGT)
3868.0 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (22 components)
  • • West Burton B Power Station CMU 1 WB1-24= 100% T_WBURB-1
  • • West Burton B Power Station CMU 2 WB2-24= 100% T_WBURB-2
  • • West Burton B Power Station CMU 3 WB3-24= 100% T_WBURB-3
WEST BURTON B LIMITED Storage (Duration 0.5h) Combined Cycle Gas Turbine (CCGT)
3608.4 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Keadby Power Station Trentside, Keadby, Scunthorpe, DN17 3EF (33 components)
  • • Keadby 1 CCGT (2)
  • • Keadby GT3
KEADBY GENERATION LIMITED Open Cycle Gas Turbine (OCGT) Combined Cycle Gas Turbine (CCGT)
3519.9 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Marchwood Power, Marchwood Industrial Park, Oceanic Way, Marchwood, Southampton, SO40 4BD (12 components)

Marchwood CCGT (3)

SSE ENERGY SUPPLY LIMITED Combined Cycle Gas Turbine (CCGT)
3356.4 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Medway Power Station, Rochester, Medway, ME3 0AG (18 components)

Medway CCGT (3)

MEDWAY POWER LIMITED Combined Cycle Gas Turbine (CCGT)
3352.9 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Peterhead Power Station, Peterhead, Aberdeenshire, AB42 3BZ (15 components)

Peterhead CCGT (3)

SSE GENERATION LIMITED Combined Cycle Gas Turbine (CCGT)
3242.3 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (49 components)
  • • New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
  • • Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 7)
Plutus Energy LTD Coal Storage Coal/biomass Storage (Duration 2h) Storage (Duration 4h) Open Cycle Gas Turbine (OCGT) Combined Cycle Gas Turbine (CCGT)
2549.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Seabank Power Limited Severn Road, Hallen Bristol BS10 7SP (11 components)

Multi Shaft CCGT (Module 1) (3)

SEABANK POWER LIMITED Combined Cycle Gas Turbine (CCGT)
2260.4 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Cow Hey Lane, Runcorn, Cheshire, WA7 4FZ (12 components)

A CCGT station consisting of two Alstom GT26A gas turbines, with an Alstom heat recovery steam generator each that produces steam for one ABB steam turbine and is based near … (3)

ROCKSAVAGE POWER COMPANY, LTD. Combined Cycle Gas Turbine (CCGT)
2236.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
The Manor Way, Stanford-le-Hope, Essex, SS17 9GN (11 components)

A CCGT station consisting of two Alstom GT26 gas turbines and a steam turbine and is based near Stanford-le-hope in Essex, England. Each turbine is individually metered with output being … (3)

CORYTON ENERGY COMPANY, LTD. Combined Cycle Gas Turbine (CCGT)
2191.0 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Little Barford Power Station Little Barford St Neots PE19 6YT (22 components)
  • • Little Barford 1 CCGT MSID: 4052 (2)
  • • Little Barford 1 OCGT . fuel type is distillate MSID: 4052
RWE GENERATION UK PLC Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines Combined Cycle Gas Turbine (CCGT)
2060.9 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
1 Ratty's Lane, Hoddesdon, Hertfordshire, EN11 0RF (4 components)
  • • Combined Cycle Gas Turbine (2)
  • • Combined Cycle Gas Turbine plant
VPI POWER LIMITED Combined Cycle Gas Turbine (CCGT)
1961.9 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 1 more)
Mitchell Road, Phoenix Parkway, Corby, Northamptonshire, NN17 5QT (29 components)
  • • The CMU is a gas plant, capable of running in either OCGT or CCGT modes (2)
  • • The CMU is a Open Cycle Gas Turbine (OCGT)
CORBY POWER LIMITED Open Cycle Gas Turbine (OCGT) Combined Cycle Gas Turbine (CCGT)
1943.0 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
EP Langage Power Station, Holland Road, Plymouth, PL7 5AW. (8 components)

EP Langage Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station. (3)

EP LANGAGE LIMITED Combined Cycle Gas Turbine (CCGT)
1655.5 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 2 more)
EP South Humber Bank Power Station, South Marsh Road, Stallingborough, DN41 8BZ. (3 components)

EP South Humber Bank Power Station Phase 1 is a Combined Cycle Gas Turbine (CCGT) electricity generating station. (3)

EP SHB LIMITED Combined Cycle Gas Turbine (CCGT)
1481.3 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4)
Cottam Development Centre Power Station Cottam Retford DN22 0TF (9 components)

Cottam Development Centre (CDC) CCGT single unit station (3)

Uniper Global Commodities SE Combined Cycle Gas Turbine (CCGT)
1223.3 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
111 Brancroft Way Enfield Middlesex EN3 7PL (12 components)

Enfield CCGT Power Station - (one unit station) (3)

UNIPER GLOBAL COMMODITIES SE Combined Cycle Gas Turbine (CCGT)
1217.9 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Basin Road South, Portslade, East Sussex, BN41 1WF (7 components)

Combined Cycle Gas Turbine plant (3)

VPI POWER LIMITED Combined Cycle Gas Turbine (CCGT)
1157.5 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Seabank Power Limited Severn Road, Hallen, Bristol BS10 7SP (11 components)

Single Shaft CCGT (Module 2) (3)

SEABANK POWER LIMITED Combined Cycle Gas Turbine (CCGT)
1141.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Great Yarmouth Power Station South Denes Road Great Yarmouth Norfolk NR30 3PY (11 components)

Great Yarmouth 1 - CCGT MSID: 7111 (3)

RWE GENERATION UK PLC Combined Cycle Gas Turbine (CCGT)
1122.9 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
EP South Humber Bank Power Station, South Marsh Road, Stallingborough, DN41 8BZ (7 components)
  • • EP South Humber Bank Power Station Phase 2 is a Combined Cycle Gas Turbine (CCGT) electricity generating station. (2)
  • • EP South Humber Bank Power Station Phase 1 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.
EP SHB LIMITED Combined Cycle Gas Turbine (CCGT)
1047.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 1 more)
West Marsh Road, Spalding, Lincolnshire, PE11 3BB (6 components)

A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. … (3)

SPALDING ENERGY COMPANY, LTD. Combined Cycle Gas Turbine (CCGT)
867.7 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 2 more)
Clough Lane North Killingholme North Lincolnshire DN40 3JP (7 components)

A combined cycle gas turbine generating plant (3)

C.GEN KILLINGHOLME LIMITED Combined Cycle Gas Turbine (CCGT)
859.8 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 2 more)
Severn Power Station West Nash Road Nash Newport NP18 2BZ (17 components)
  • • Existing CCGT Unit (2)
  • • Existing CCGT UnitSevern Power Station West Nash Road Nash Newport NP18 2BZ
SEVERN POWER LIMITED Combined Cycle Gas Turbine (CCGT)
773.1 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF (17 components)
  • • Existing CCGT (2)
  • • Existing CCGT to be refurbished
SUTTON BRIDGE POWER GENERATION Combined Cycle Gas Turbine (CCGT)
773.1 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Hythe Power Station Charleston Road Hardley Hythe Southampton SO45 3BP (8 components)

Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines . MSID: 7174 (3)

RWE GENERATION UK PLC Combined Cycle Gas Turbine (CCGT)
136.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Livesey Branch Rd, Feniscowles, Blackburn, Lancashire, BB2 5HX (10 components)
  • • Small Combined Cycle Gas Turbine plant with registered capacity 75MVA or 60MW at 0.8PF. (2)
  • • Small Combined Cycle Gas Turbine plant with contracted connection capacity 75MVA or 60MW at 0.8PF
VPI POWER LIMITED Combined Cycle Gas Turbine (CCGT)
112.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Showing locations 1 - 32 of 32