Coal/biomass

28 unique locations 55 components 0 companies Page 1 of 1
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (49 components)
  • • New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
  • • Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 3)
  • • Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 4)
  • • ... and 1 more unique descriptions
Plutus Energy LTD Coal Storage Coal/biomass Storage (Duration 2h) Storage (Duration 4h) Open Cycle Gas Turbine (OCGT) Combined Cycle Gas Turbine (CCGT)
2549.8 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Ratcliffe-on-Soar Nottingham NG11 0EE (64 components)
  • • Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590 (3)
  • • Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590 (2)
UNIPER UK LIMITED Coal Coal/biomass Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines (Fuel Type - Diesel)
472.9 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Drax Power Station, Selby, North Yorkshire, YO8 8PH (54 components)
  • • A coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5. (8)
  • • This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-10G under the BSC. (7)
  • • This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-12G under the BSC. (5)
  • • ... and 8 more unique descriptions
Plutus Energy LTD Coal Coal/biomass Open Cycle Gas Turbine (OCGT)
268.3 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 12 more)
Runcorn ERF, Barlow Way, Runcorn, Cheshire WA7 4HG (14 components)
  • • Existing energy from waste generation unit in operation from February 2015. Site is located on Barlow Way Runcorn and electricity … (10)
  • • Existing generation unit. (2)
INOVYN CHLORVINYLS LIMITED Coal/biomass Energy from Waste
121.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 10 more)
Allington EfW, Laverstoke Road, 20/20 Business Park, Allington, Maidstone, Kent, ME16 0LE (12 components)

This CMU identifier is the replacement of ALL001 due to changes of unit capacity and connection agreement. The connection capacity is based on historic data as per rule 3.5.3 Allington … (5)

FCC Recycling (UK) Limited Coal/biomass Energy from Waste
98.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Trident Park ERF, Glass Avenue, Cardiff, CF24 5EN (10 components)
  • • Twin stream Energy Recovery Facility (ERF) or Energy from Waste which can generate up to 37.5MW of power and export … (3)
  • • Twin stream Energy Recovery Facility (ERF) or Energy from Waste located in Glass Avenue, Cardiff. (2)
VIRIDOR ENERGY LIMITED Coal/biomass Energy from Waste
95.8 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Greatmoor EfW, Greatmoor Road, Woodham, Aylesbury, Buckinghamshire, HP18 0QE (9 components)

This CMU identifier is the replacement for BUCK01, BUCK02, FCCB01, due to the change in Connection Capacity as per rule 3.5.2 and change from "New build CMU" to "Existing CMU" … (5)

FCC BUCKINGHAMSHIRE LIMITED Coal/biomass Energy from Waste
72.0 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 6 more)
Suffolk EfW Lodge Lane Great Blakenham Ipswich, Suffolk IP6 0JE (14 components)

Existing Energy from Waste Plant (5)

SUEZ RECYCLING AND RECOVERY SUFFOLK LTD Coal/biomass Energy from Waste
64.5 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
STV Lines 4 & 5 EfW Haverton Hill Road Billingham Cleveland TS23 1PY (13 components)

Existing Energy from Waste Plant (5)

SOUTH TYNE & WEAR ENERGY RECOVERY LTD Coal/biomass Energy from Waste
61.6 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
"Mercia EnvirRecover EfW Oak Drive Hartlebury Trading Estate Hartlebury Worcestershire DY10 4JB" (12 components)

This new CMU identifier is the replacement for the MER001, MERC01 and MERC02 as the CMU is operational since April 2017. The CMU capacity is 19.619 MW, reduced from 25 … (5)

MERCIA WASTE MANAGEMENT LIMITED Coal/biomass Energy from Waste
51.9 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Lincoln EfW, Paving Way Off Whisby Road, North Hykeham, Lincoln, Lincolnshire, LN6 3QW (15 components)
  • • New CMU identifier due to updated grid connection agreement and change of method to calculate the connection capacity to "Historic … (5)
  • • This new CMU identifier is the replacement of LINC01 due to change in the Connection Capacity to Grid Connection Capacity … (3)
  • • FCC Lincoln Energy From Waste Plant Paving Way off Whisby Road Lincoln LN6 3QW. Energy from waste plant located in … (2)
  • • ... and 1 more unique descriptions
FCC Recycling (UK) Limited Coal/biomass Energy from Waste
46.2 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 10 more)
Marchwood ERF, Oceanic Way, Marchwood Industrial Park, Normandy Way, Marchwood, Hampshire SO40 4BD (9 components)

Municipal waste incineration plant located in Marchwood Hampshire. It is based on boilers supplying steam to a turbine-generator. (5)

VEOLIA UK LIMITED Coal/biomass Energy from Waste
40.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 6 more)
Millerhill Recycling & Energy Recovery Centre Whitehill Road DALKEITH EH22 1SX (11 components)
  • • New CMU ID due to updated Grid Connection Agreement FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with … (5)
  • • FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not … (3)
  • • FCC (E+M) Limited, New build 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load … (3)
FCC (E&M) LIMITED Coal/biomass Energy from Waste
38.6 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 8 more)
Portsmouth ERF, Quartremaine Road, Portsmouth, Hampshire PO3 5QH (9 components)

Municipal waste incineration plant located in Portsmouth Hampshire. It is based on boilers supplying steam to a turbine-generator. (5)

VEOLIA UK LIMITED Coal/biomass Energy from Waste
38.3 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 6 more)
STV Line 3 EfW Haverton Hill Road Billingham Cleveland TS23 1PY (13 components)

Existing Energy from Waste Plant (5)

NORTHUMBERLAND ENERGY RECOVERY LTD Coal/biomass Energy from Waste
28.1 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Kirklees Energy from Waste Plant Vine Street Huddersfield, Yorkshire HD1 6NT (14 components)

Existing Energy from Waste Plant (12)

SUEZ RECYCLING AND RECOVERY KIRKLEES LTD Coal/biomass Energy from Waste
27.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 10 more)
Chineham ERF, Whitmarsh Lane, Basingstoke, Hampshire, RG24 8LL (9 components)

Municipal waste incineration plant located in Chineham Hampshire. It is based on one boiler supplying steam to a turbine-generator. (5)

VEOLIA UK LIMITED Coal/biomass Energy from Waste
19.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 6 more)
Tees Valley EfW Lines 1 & 2 Haverton Hill Road Billingham Cleveland TS23 1PY (15 components)

Existing Energy from Waste Plant (5)

TATA STEEL UK LIMITED Coal/biomass Energy from Waste
18.9 MW
Inactive - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 7 more)
EcoPark, Advent Way, Edmonton, London N18 3AG (10 components)

Inclined grate residual Waste-to-Energy facility comprising 5-boilers and 4-turbines. (5)

LONDONENERGY LTD Coal/biomass Energy from Waste
17.6 MW
Inactive - 2025-26 (T-1), 2024-25 (T-4), 2023-24 (T-4) (and 7 more)
Exeter ERF, Grace Road South, Exeter EX2 8QE (11 components)
  • • Energy from Waste Facility which exports at between 3 MW and 4 MW subject to calorific value of waste and … (3)
  • • Energy from Waste Facility located in Grace Road, Exeter. (2)
VIRIDOR ENERGY LIMITED Coal/biomass Energy from Waste
10.1 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Coatbridge, ML5 4UG, Scotland (3 components)

Energy from Waste facility (3)

North Lanarkshire Bio Power Limited Coal/biomass Energy from Waste
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2021-22 (T-4)
North Road, Eastham, CH65 1AJ (4 components)

Energy from waste Facility (3)

HOOTON BIO POWER LIMITED Coal/biomass Energy from Waste
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 1 more)
Stoke EfW plant Campbell Road Sideway Stoke on Trent St4 4DX (6 components)
  • • 2 stream municipal waste incinerator generating electricity through one turbine generator. Electricity is used on site with the excess being … (3)
  • • 2 stream municipal waste incinerator (2)
HANFORD WASTE SERVICES LIMITED Coal/biomass Energy from Waste
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 3 more)
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (50 components)
  • • Aberthaw 7 OCGT fuel type distillate
  • • Aberthaw 8 Coal fired
  • • Aberthaw 8 OCGT fuel is distillate
  • • ... and 2 more unique descriptions
RWE GENERATION UK PLC Coal Coal/biomass Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 5 more)
Ferrybridge Power Station, Stranglands Lane, Knottingley, West Yorkshire, WF11 8SQ (57 components)
  • • Aux. load separately metered (2)
  • • GT5
  • • GT8
  • • ... and 1 more unique descriptions
KEADBY GENERATION LIMITED Coal Coal/biomass Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 7 more)
Fiddler's Ferry Power Station, Widnes Road, Cuerdley, Warrington, WA5 2UT (86 components)
  • • GT2
  • • Generating Unit 1
  • • Generating Unit 2
  • • ... and 2 more unique descriptions
KEADBY GENERATION LIMITED Coal Coal/biomass Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines (Fuel Type - Diesel)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 7 more)
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (10 components)

Aberthaw 7 Coal fired unit (5)

RWE GENERATION UK PLC Coal Coal/biomass
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 5 more)
Newlands Road Wentloog Cardiff CF3 2EF (2 components)

Energy From Waste facility (2)

Cardiff Bio Power Limited Coal/biomass Energy from Waste
Inactive - 2023-24 (T-4), 2021-22 (T-4)
Showing locations 1 - 28 of 28