Search Map View Statistics Support Us Help Login Register

Coal/biomass

5 unique locations 13 components 0 companies Page 1 of 1
Exeter ERF, Grace Road South, Exeter EX2 8QE (11 components)
  • • Energy from Waste Facility which exports at between 3 MW and 4 MW subject to calorific value of waste and … (3)
  • • Energy from Waste Facility located in Grace Road, Exeter. (2)
VIRIDOR ENERGY LIMITED Coal/biomass Energy from Waste
10.1 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Fiddler's Ferry Power Station, Widnes Road, Cuerdley, Warrington, WA5 2UT (86 components)
  • • GT2
  • • Generating Unit 1
  • • Generating Unit 2
  • • ... and 2 more unique descriptions
KEADBY GENERATION LIMITED Coal Coal/biomass Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines (Fuel Type - Diesel)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 7 more)
Ferrybridge Power Station, Stranglands Lane, Knottingley, West Yorkshire, WF11 8SQ (57 components)
  • • Aux. load separately metered (2)
  • • GT5
  • • GT8
  • • ... and 1 more unique descriptions
KEADBY GENERATION LIMITED Coal Coal/biomass Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 7 more)
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (50 components)
  • • Aberthaw 7 OCGT fuel type distillate
  • • Aberthaw 8 Coal fired
  • • Aberthaw 8 OCGT fuel is distillate
  • • ... and 2 more unique descriptions
RWE GENERATION UK PLC Coal Coal/biomass Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 5 more)
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (10 components)

Aberthaw 7 Coal fired unit (5)

RWE GENERATION UK PLC Coal Coal/biomass
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 5 more)
Showing locations 1 - 5 of 5