Search Map View Statistics Support Us Help Login Register

Coal/biomass

12 unique locations 29 components 0 companies Page 1 of 1
Drax Power Station, Selby, North Yorkshire, YO8 8PH (54 components)
  • • A coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5. (8)
  • • This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-10G under the BSC. (7)
  • • This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-12G under the BSC. (5)
  • • ... and 8 more unique descriptions
Plutus Energy LTD Coal Coal/biomass Open Cycle Gas Turbine (OCGT)
268.3 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 12 more)
Lincoln EfW, Paving Way Off Whisby Road, North Hykeham, Lincoln, Lincolnshire, LN6 3QW (15 components)
  • • New CMU identifier due to updated grid connection agreement and change of method to calculate the connection capacity to "Historic … (5)
  • • This new CMU identifier is the replacement of LINC01 due to change in the Connection Capacity to Grid Connection Capacity … (3)
  • • FCC Lincoln Energy From Waste Plant Paving Way off Whisby Road Lincoln LN6 3QW. Energy from waste plant located in … (2)
  • • ... and 1 more unique descriptions
FCC Recycling (UK) Limited Coal/biomass Energy from Waste
46.2 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 10 more)
Kirklees Energy from Waste Plant Vine Street Huddersfield, Yorkshire HD1 6NT (14 components)

Existing Energy from Waste Plant (12)

SUEZ RECYCLING AND RECOVERY KIRKLEES LTD Coal/biomass Energy from Waste
27.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 10 more)
Tees Valley EfW Lines 1 & 2 Haverton Hill Road Billingham Cleveland TS23 1PY (15 components)

Existing Energy from Waste Plant (5)

TATA STEEL UK LIMITED Coal/biomass Energy from Waste
18.9 MW
Inactive - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 7 more)
EcoPark, Advent Way, Edmonton, London N18 3AG (10 components)

Inclined grate residual Waste-to-Energy facility comprising 5-boilers and 4-turbines. (5)

LONDONENERGY LTD Coal/biomass Energy from Waste
17.6 MW
Inactive - 2025-26 (T-1), 2024-25 (T-4), 2023-24 (T-4) (and 7 more)
Lakeside EfW, Lakeside Road, Colnbrook, SL3 0FE (6 components)

Energy from Waste Facility (5)

LAKESIDE ENERGY FROM WASTE LIMITED Coal/biomass Energy from Waste
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 3 more)
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (10 components)

Aberthaw 7 Coal fired unit (5)

RWE GENERATION UK PLC Coal Coal/biomass
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 5 more)
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (50 components)
  • • Aberthaw 7 OCGT fuel type distillate
  • • Aberthaw 8 Coal fired
  • • Aberthaw 8 OCGT fuel is distillate
  • • ... and 2 more unique descriptions
RWE GENERATION UK PLC Coal Coal/biomass Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 5 more)
Kincardine on Forth. Clackmannanshire. FK10 4AA. Scotland (16 components)
  • • Longannet coal fired power station - Unit 1 (2)
  • • Longannet coal fired power station - Unit 2
  • • Longannet coal fired power station - Unit 3
  • • ... and 1 more unique descriptions
VPI POWER LIMITED Coal/biomass
Inactive - 2021-22 (T-4), 2020-21 (T-4), 2018-19 (T-1) (and 1 more)
West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (20 components)
  • • West Burton A Power Station CMU 1 WA1-17 = 100% (T_WBUPS-1) + 25% (E_WBUPS-STX)
  • • West Burton A Power Station CMU 2 WA2-17 = 100% (T_WBUPS-2) + 25% (E_WBUPS-STX)
  • • West Burton A Power Station CMU 3 WA3-17 = 100% (T_WBUPS-3) + 25% (E_WBUPS-STX)
  • • ... and 2 more unique descriptions
EDF Energy Limited Coal/biomass OCGT and Reciprocating Engines (Fuel Type - Diesel)
Inactive - 2021-22 (T-4), 2020-21 (T-4), 2018-19 (T-1) (and 1 more)
Cornwall Energy Recovery Centre St Dennis Cornwall PL26 8DY (6 components)
  • • New Build Energy from Waste Plant (2)
  • • Existing Energy from Waste Plant
CORNWALL ENERGY RECOVERY LTD Coal/biomass
Inactive - 2018-19 (T-1), 2017-18 (T-1), 2016-17 (TR)
Severnside Energy Recovery Centre Severn Road Hallen, Bristol South Gloucestershire BS10 7SP (5 components)
  • • New Build Energy from Waste Plant (2)
  • • Existing Energy from Waste Plant
WEST LONDON ENERGY RECOVERY LTD Coal/biomass
Inactive - 2018-19 (T-1), 2017-18 (T-1), 2016-17 (TR)
Showing locations 1 - 12 of 12