On-site existing CHP generating unit
(5)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 7 more)
-
• CHP
(2)
-
• Gas Fired - CHP
(2)
Inactive -
2024-25 (T-1),
2023-24 (T-4),
2019-20 (T-1)
(and 1 more)
On-site existing CHP generating unit
(5)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 6 more)
-
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
(3)
-
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
(2)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 7 more)
On-site existing CHP generating unit
(5)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 7 more)
gas-fired CHP unit
(5)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-4)
(and 7 more)
-
• 2.8MWe back pressure steam turbine
(3)
-
• 6.46 MWe Ruston Tornado Gas Turbine (Siemens SG200)
(2)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-4)
(and 7 more)
CHP
(5)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 4 more)
-
• Gas fired CHP unit
(4)
-
• CHP unit
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 5 more)
0.725MW Combined Heat and Power Plant Royal South Hants Hospital
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 7 more)
The component consists of gas CHP 3355kW servicing the electricity and heat requirements for Melrow Nursery, one of the horticultural sites which trades at Flavourfresh Salads. The generation unit capacity …
(5)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 7 more)
-
• A Packaged 3.976MW, 11kV natural gas fired reciprocating engine CHP
(4)
-
• A Packaged 3.976MW, 11kV CHP
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 4 more)
-
• Gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh …
(2)
-
• The component consists of gas CHP (2679kW and 2004kW) servicing the electricity and heat requirements for Aldergrove Nursery, one of …
(2)
-
• The component consists of gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites …
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 7 more)
On-site existing CHP generating unit
(5)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 6 more)
Gas fired CHP
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 7 more)
On-site existing CHP generating unit
(5)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 6 more)
-
• Gas fired CHP unit
(4)
-
• CHP unit
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 5 more)
Two gas CHP in a horticultural environment with no aux load
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 6 more)
-
• Two gas CHP engines in commercial horticultural environment with no auxilliary load
(4)
-
• Gas CHP engines in commercial horticultural environment with no auxilliary load
1.0 MW
Inactive -
2027-28 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 4 more)
-
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific …
(6)
-
• Gas CHP engines 1.37MW and 1.50MW. Primary fuel type = Natural Gas
(2)
1.3 MW
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 8 more)
-
• 1 x gas reciprocating engine with a total rated gross power capacity of 0.900 MW and a net power capacity …
(2)
-
• Gas reciprocating engine
(2)
1.5 MW
Inactive -
2028-29 (T-4),
2025-26 (T-1),
2021-22 (T-4)
(and 1 more)
-
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 18042602
(3)
-
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 081171171
(2)
1.6 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 7 more)
One asset 1.13MW CHP engine in a horticultural environment with no auxiliary load.
(5)
2.1 MW
Inactive -
2027-28 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 7 more)
-
• District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas. All generation …
(10)
-
• District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas
(2)
2.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 10 more)
District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
(5)
2.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
One asset 1.5MW CHP engine in a horticultural environment with no auxiliary load.
(5)
2.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
One CHP engine in a horticultural environment with no auxilliary load.
(5)
3.0 MW
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 5 more)
-
• 1 x Gas reciprocating engine with a total rated gross power capacity of 2.000 MW and total net power capacity …
(2)
-
• 1 x Gas reciprocating engine with a total rated gross power capacity of 2.000 MW and total net power capacity …
-
• 1 x Gas reciprocating engine with a total rated gross power capacity of 2.185 MW and total net power capacity …
-
• ... and 1 more unique descriptions
3.4 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 7 more)
Energy Centre with gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.
(5)
3.5 MW
Inactive -
2027-28 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 7 more)
One asset 2.0MW CHP engine in a horticultural environment with no auxiliary load.
(5)
3.6 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
1.6MW Combined Heat and Power at International Conference Centre
(5)
4.0 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 7 more)
Turbomach M50 Natural Gas fired CHP unit
(5)
4.0 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-4)
(and 7 more)
-
• VIT305 - CHP unit at John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU.
(4)
-
• New 4.5MW CHP at Oxford Hospital
4.1 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 3 more)
Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the …
(5)
4.1 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 7 more)
-
• Gas CHP engines in commercial horticultural usage with no auxilliary load
(4)
-
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
4.2 MW
Inactive -
2027-28 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 7 more)
CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
(5)
4.6 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 6 more)
Two CHP engines in horticultural environment with no auxilliary load
(5)
4.7 MW
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 6 more)
-
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however …
(2)
-
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however …
-
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however …
-
• ... and 1 more unique descriptions
4.9 MW
Inactive -
2025-26 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 7 more)
District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
(5)
5.2 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
District heating implementation of two gas CHP engines with no auxilliary load
(5)
5.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 6 more)
Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
(5)
5.6 MW
Inactive -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
-
• CHP engine in horticultural environment with no auxilliary load
(3)
-
• Two CHP engines in horticultural environment with no auxilliary load
(2)
5.8 MW
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 4 more)
CHP engine in a horticultural environment, natural gas, no aux load
(9)
5.8 MW
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 8 more)
Two CHP gas engines in commercial horticultural environment with no auxilliary load
(6)
6.0 MW
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 4 more)
-
• Four CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for …
(6)
-
• Three CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for …
(2)
-
• Three engines of 2.65MW each all CHP engine in a horticultural environment, exporting excess generation to distribution network. Primary fuel …
(2)
6.4 MW
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 8 more)
Gas-fired CHP unit
(5)
7.3 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-4)
(and 7 more)
-
• 1.2 MW Combined Heat and Power Engine.
(6)
-
• 1.6 MW Combined Heat and Power Engine
(6)
-
• 1.6MW Combined Heat and Power Engine
(4)
-
• ... and 1 more unique descriptions
7.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 8 more)
One 8 MWe Gas Turbine Cogeneration Unit (GT2)
(5)
7.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 7 more)
-
• 8.300MW Gas Turbine installation
(3)
-
• 8.3MW Gas Turbine installation
(2)
7.6 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
Turbomach M50 Natural Gas fired CHP unit
(5)
7.6 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-4)
(and 7 more)