Home List View Map View Technologies Companies Support Us Help Login Register
Theme

CHP and autogeneration

70 unique locations 155 components 0 companies Page 1 of 2
Map View
Marsh Road, Banks, Southport PR9 8DX (14 components)
  • • Gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh … (2)
  • • The component consists of gas CHP (2679kW and 2004kW) servicing the electricity and heat requirements for Aldergrove Nursery, one of … (2)
  • • The component consists of gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites …
FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 7 more)
Energy Center, Ashton Street, Liverpool, L69 3GB (39 components)
  • • One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB (3)
  • • One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843 (2)
ENEL X UK LIMITED CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 7 more)
Ninewells Hospital, Dundee, DD2 1UB (7 components)
  • • A Packaged 3.976MW, 11kV natural gas fired reciprocating engine CHP (4)
  • • A Packaged 3.976MW, 11kV CHP
VITAL ENERGI SOLUTIONS LIMITED CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 4 more)
Runcton Nursery, Lagness Road, Chichester PO20 1LJ (9 components)

Two gas CHP in a horticultural environment with no aux load (5)

FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 6 more)
Priory Street, Ware, Hertfordshire, SG12 0DJ (9 components)

On-site existing CHP generating unit (5)

DISTRIBUTED ENERGY CUSTOMER SOLUTIONS LIMITED CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 6 more)
Cobden Street, Montrose, Angus, DD10 8EA (9 components)

On-site existing CHP generating unit (5)

DISTRIBUTED ENERGY CUSTOMER SOLUTIONS LIMITED CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 6 more)
Park Road, Ware. Hertfordshire, SG12 0DP (20 components)

On-site existing CHP generating unit (5)

DISTRIBUTED ENERGY CUSTOMER SOLUTIONS LIMITED CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 7 more)
Gunnels Wood Road, Stevenage, SG1 2NY, United Kingdom (18 components)

On-site existing CHP generating unit (5)

DISTRIBUTED ENERGY CUSTOMER SOLUTIONS LIMITED CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 6 more)
Royal South Hants Hospital, Graham Road, Southampton, Hampshire, SO14 0YG (11 components)

0.725MW Combined Heat and Power Plant Royal South Hants Hospital (5)

SOUTHAMPTON GEOTHERMAL HEATING COMPANY LTD(THE) CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 7 more)
Melrow Nursery, Rydings Lane, Southport PR9 8EB (11 components)

The component consists of gas CHP 3355kW servicing the electricity and heat requirements for Melrow Nursery, one of the horticultural sites which trades at Flavourfresh Salads. The generation unit capacity … (5)

FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 7 more)
Address: Port of Liverpool CHP, Regent Road, Bootle, Liverpool, L20 1ED (11 components)

Gas fired CHP (5)

CARGILL PLC CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 7 more)
Harmire Road, Barnard Castle, County Durham, DL12 8DT (14 components)

On-site existing CHP generating unit (5)

ENERSYST LIMITED CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 7 more)
Thearne Lane Woodmansey Beverley HU17 0SA (7 components)
  • • Two gas CHP engines in commercial horticultural environment with no auxilliary load (4)
  • • Gas CHP engines in commercial horticultural environment with no auxilliary load
FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
1.0 MW
Inactive - 2027-28 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 4 more)
Galley Hill Road Waltham Abbey Essex EN9 2AG (13 components)
  • • Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific … (6)
  • • Gas CHP engines 1.37MW and 1.50MW. Primary fuel type = Natural Gas (2)
FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
1.3 MW
Inactive - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 8 more)
National Indoor Arena, King Edward Road, Birmingham, B1 2AA (15 components)
  • • Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 18042602 (3)
  • • Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 081171171 (2)
BIRMINGHAM DISTRICT ENERGY COMPANY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
1.6 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 7 more)
Sandylands Nurseries, The Cross, Offenham, Evesham Worcestershire WR11 8RB (10 components)

One asset 1.13MW CHP engine in a horticultural environment with no auxiliary load. (5)

FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
2.1 MW
Inactive - 2027-28 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 7 more)
Montgomery Road, Aberdeen AB24 2YA (14 components)
  • • District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas. All generation … (10)
  • • District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas (2)
FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
2.5 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 10 more)
Ashgrove Road West, Aberdeen AB16 5UL (14 components)

District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations. (5)

FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
2.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Westland Nurseries (Offenham) Ltd., Station Road, Offenham, Evesham, Worcestershire, WR11 8LW (12 components)

One asset 1.5MW CHP engine in a horticultural environment with no auxiliary load. (5)

FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
2.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Plot 5, Barrow Man Road, Birchington Kent CT7 0AX (8 components)

One CHP engine in a horticultural environment with no auxilliary load. (5)

FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
3.0 MW
Inactive - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 5 more)
Broadgreen Hospital, Thomas Drive, Liverpool L14 3LB (11 components)
  • • 1 x Gas reciprocating engine with a total rated gross power capacity of 2.000 MW and total net power capacity … (2)
  • • 1 x Gas reciprocating engine with a total rated gross power capacity of 2.000 MW and total net power capacity …
  • • 1 x Gas reciprocating engine with a total rated gross power capacity of 2.185 MW and total net power capacity …
  • • ... and 1 more unique descriptions
VEOLIA UK LIMITED CHP and autogeneration Combined Heat and Power (CHP)
3.4 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 7 more)
9 Handyside St, Kings Cross, London N1C 4BH (11 components)

Energy Centre with gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations. (5)

FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
3.5 MW
Inactive - 2027-28 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 7 more)
Lansdale Nursery, Jacksmere Lane, Scarisbrick, Ormskirk, Lancs L40 9RT (13 components)

One asset 2.0MW CHP engine in a horticultural environment with no auxiliary load. (5)

FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
3.6 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 7 more)
International Conference Centre, Birmingham, B1 2EA (15 components)

1.6MW Combined Heat and Power at International Conference Centre (5)

BIRMINGHAM DISTRICT ENERGY COMPANY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
4.0 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 7 more)
Port Causeway Bromborough Merseyside CH62 4TH (16 components)

Turbomach M50 Natural Gas fired CHP unit (5)

ENEL X UK LIMITED CHP and autogeneration Combined Heat and Power (CHP)
4.0 MW
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-4) (and 7 more)
St Marks Boilerhouse Donaldson Road LEICESTER Leicestershire LE4 6BF (14 components)

Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the … (5)

LEICESTER DISTRICT ENERGY COMPANY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
4.1 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 7 more)
46 Station Road Stokesley Middlesbrough TS9 7AA (10 components)
  • • Gas CHP engines in commercial horticultural usage with no auxilliary load (4)
  • • 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
FLEXITRICITY LIMITED Reciprocating engines CHP and autogeneration Combined Heat and Power (CHP)
4.2 MW
Inactive - 2027-28 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 7 more)
Great Western Rd, Gloucestershire, Gloucester GL1 3NN (9 components)

CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered. (5)

FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
4.6 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 6 more)
Barrow Man Road Birchington Kent CT7 0AX (10 components)

Two CHP engines in horticultural environment with no auxilliary load (5)

FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
4.7 MW
Inactive - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 6 more)
The Heat Station Harbour Parade, Southampton, Hampshire, SO15 1BA (26 components)
  • • 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however … (2)
  • • 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however …
  • • 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however …
  • • ... and 1 more unique descriptions
SOUTHAMPTON GEOTHERMAL HEATING COMPANY LTD(THE) CHP and autogeneration Combined Heat and Power (CHP)
4.9 MW
Inactive - 2025-26 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 7 more)
School Road, Aberdeen AB24 1TU (14 components)

District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations. (5)

FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
5.2 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
323 Avebury Boulevard, MILTON KEYNES MK9 2GA (10 components)

District heating implementation of two gas CHP engines with no auxilliary load (5)

P3P Partners LLP CHP and autogeneration Combined Heat and Power (CHP)
5.5 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 6 more)
Tower Nurseries Netherhall Road Roydon Essex CM19 5JP (11 components)

Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations (5)

FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
5.6 MW
Inactive - 2028-29 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 7 more)
Thanet Earth Plot 2, 2 Barrow Man Road Birchington Kent CT7 0AX (10 components)
  • • CHP engine in horticultural environment with no auxilliary load (3)
  • • Two CHP engines in horticultural environment with no auxilliary load (2)
FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
5.8 MW
Inactive - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 4 more)
Plot 6 Barrow Man Road, Birchington CT7 0AX (11 components)

CHP engine in a horticultural environment, natural gas, no aux load (9)

FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
5.8 MW
Inactive - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 8 more)
Plot 4 Thanet Earth, Barrow Man Road Birchington Kent CT7 0AX (7 components)

Two CHP gas engines in commercial horticultural environment with no auxilliary load (6)

FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
6.0 MW
Inactive - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 4 more)
The Old Airfield, City Fields Way, Tangmere, Chichester West Sussex PO20 2FT (12 components)
  • • Four CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for … (6)
  • • Three CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for … (2)
  • • Three engines of 2.65MW each all CHP engine in a horticultural environment, exporting excess generation to distribution network. Primary fuel … (2)
FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
6.4 MW
Inactive - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 8 more)
London Rd, Purfleet RM19 1SD (16 components)

Gas-fired CHP unit (5)

ENEL X UK LIMITED CHP and autogeneration Combined Heat and Power (CHP)
7.3 MW
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-4) (and 7 more)
Denison Road, Selby, North Yorkshire YO8 8AN (15 components)

One 8 MWe Gas Turbine Cogeneration Unit (GT2) (5)

Plutus Energy LTD CHP and autogeneration Combined Heat and Power (CHP)
7.5 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 7 more)
Smurfit Kappa SSK, Mount Street, Nechells, Birmingham B7 5RE (11 components)
  • • 8.300MW Gas Turbine installation (3)
  • • 8.3MW Gas Turbine installation (2)
LIMEJUMP LTD CHP and autogeneration Combined Heat and Power (CHP)
7.6 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 7 more)
Staverton, Trowbridge, Wiltshire, BA14 6PH (17 components)

Turbomach M50 Natural Gas fired CHP unit (5)

ENEL X UK LIMITED CHP and autogeneration Combined Heat and Power (CHP)
7.6 MW
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-4) (and 7 more)
Kings Yard Energy Centre, Carpenters Lane, Stratford, London E15 2DU (18 components)

Combined Heat and Power Plant Olympic Park London (12)

EAST LONDON ENERGY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
7.8 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 12 more)
Aston University, Aston Triangle, Birmingham, West Midlands, B4 7ET (30 components)
  • • 1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and … (3)
  • • 2MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and … (2)
BIRMINGHAM DISTRICT ENERGY COMPANY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
7.9 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 7 more)
QMC Campus, Nottingham University Hospitals, Queens Medical Centre, Derby Road, Nottingham, NG7 2UH (10 components)

A site with one gas turbine CHP, providing steam and electricity to Queens Medical Centre in Nottingham (5)

E.ON UK PLC CHP and autogeneration Combined Heat and Power (CHP)
8.1 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 7 more)
Fielding & Johnson Building University Of Leicester University Road LEICESTER Leicestershire LE1 7RH (28 components)
  • • Combined Heat and Power Plant, University of Leicester, capacity of generator 1.600MW (3)
  • • Combined Heat and Power Plant, University of Leicester, generator's capacity 1.600MW (2)
LEICESTER DISTRICT ENERGY COMPANY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
8.2 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 7 more)
Plot 3, Barrow Man Road, Birchington CT7 0AX (11 components)

Gas CHP in a horticultural environment providing heat & electricity to site and exporting excess. (9)

FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
8.7 MW
Inactive - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 8 more)
Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (12 components)
  • • The CMU Component will have a connection capacity of 3.376MW. Gas-fired reciprocating engine will be the technology used. (3)
  • • The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be … (2)
P3P ENERGY MANAGEMENT AE LIMITED Reciprocating engines CHP and autogeneration Combined Heat and Power (CHP)
9.2 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Nr 125 Park Lane Cottingham East Yorkshire HU16 5RX (17 components)
  • • CHP at a horticultural environment. (2)
  • • Gas CHP engines in commercial horticultural environment with no auxilliary load (2)
  • • CHP at horticultural site
FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
9.3 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Royal Liverpool University Hospital, Prescott Street, Liverpool L7 8XP (11 components)
  • • 2 x Gas reciprocating engines with a total rated gross power capacity of 5.362 MW and total net power capacity … (2)
  • • 2 x Gas reciprocating engines with a total rated gross power capacity of 5.362 MW and total net power capacity … (2)
  • • 2 x Gas reciprocating engines with a total rated gross power capacity of 5.241 MW and total net power capacity …
VEOLIA UK LIMITED CHP and autogeneration Combined Heat and Power (CHP)
9.6 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 7 more)
Wood End, Stocks Lane, Over Peover, Knutsford WA16 9EZ (16 components)
  • • 2MW gas CHP engine in a horticultural environment (2)
  • • One 2MW gas CHP engine in a horticultural environment (2)
  • • One 1.5 MW gas CHP engine in a horticultural environment
FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
10.0 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Showing locations 1 - 50 of 70