Search Map View Statistics Support Us Help Login Register

CHP and autogeneration

22 unique locations 65 components 0 companies Page 1 of 1
Rosper Road Immingham North Lincolnshire DN40 3DZ (16 components)
  • • Gas CHP on South bank of river Humber providing electricity and industrial steam (8)
  • • New build gas reciprocating multi-engine generating plant (4)
  • • Battery storage unit
VPI Immingham LLP Reciprocating engines Storage (Duration 2h) CHP and autogeneration Combined Heat and Power (CHP)
3439.5 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Drakemyre, Dalry KA24 5JJ (18 components)
  • • Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas (10)
  • • Gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas (2)
  • • One 22.9MVA gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural … (2)
FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
26.7 MW
Inactive - 2028-29 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 11 more)
Newton Aycliffe CO Durham DL5 6EA (30 components)
  • • This is an existing CHP (4)
  • • This is a long standing existing CHP unit located on land within a manufacturing site.
INOVYN CHLORVINYLS LIMITED CHP and autogeneration Combined Heat and Power (CHP)
21.8 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
1 Thane Road West, Nottingham, NG2 3AA (60 components)
  • • One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA (3)
  • • One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA. (2)
ENEL X UK LIMITED CHP and autogeneration Combined Heat and Power (CHP)
17.3 MW
Inactive - 2024-25 (T-1), 2023-24 (T-1), 2022-23 (T-4) (and 7 more)
100 Montifichet Road, Westfield, Stratford E20 1GR (36 components)

Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 … (5)

EAST LONDON ENERGY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
16.6 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 7 more)
High Street, Waterham, nr Faversham, Kent ME13 9EJ (10 components)
  • • 6 CHP engines horticultural environment with no auxiliiary load (4)
  • • Two of six CHP engines horticultural environment with no auxiliiary load
FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
13.4 MW
Inactive - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 6 more)
Station Road, Wigton, Cumbria CA7 9BG (29 components)
  • • Gas engine (3)
  • • Gas turbine (2)
ENEL X UK LIMITED CHP and autogeneration Combined Heat and Power (CHP)
11.2 MW
Inactive - 2024-25 (T-4), 2024-25 (T-1), 2023-24 (T-4) (and 7 more)
Southampton General Hospital Tremona Road, Southampton, SO16 6YD (9 components)
  • • 2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW (2)
  • • 2X gas reciprocating engines with a total gross power capacity of 3.973 MW (2)
  • • 2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW and a net power capacity of 3.953 …
VEOLIA UK LIMITED CHP and autogeneration Combined Heat and Power (CHP)
10.4 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-1) (and 6 more)
Wood End, Stocks Lane, Over Peover, Knutsford WA16 9EZ (16 components)
  • • 2MW gas CHP engine in a horticultural environment (2)
  • • One 2MW gas CHP engine in a horticultural environment (2)
  • • One 1.5 MW gas CHP engine in a horticultural environment
FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
10.0 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Aston University, Aston Triangle, Birmingham, West Midlands, B4 7ET (30 components)
  • • 1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and … (3)
  • • 2MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and … (2)
BIRMINGHAM DISTRICT ENERGY COMPANY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
7.9 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 7 more)
Kings Yard Energy Centre, Carpenters Lane, Stratford, London E15 2DU (18 components)

Combined Heat and Power Plant Olympic Park London (12)

EAST LONDON ENERGY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
7.8 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 12 more)
Excel Energy Centre Warehouse R Royal Victoria Dock Northside London E16 1BA (25 components)
  • • 1.2 MW Combined Heat and Power Engine. (6)
  • • 1.6 MW Combined Heat and Power Engine (6)
  • • 1.6MW Combined Heat and Power Engine (4)
  • • ... and 1 more unique descriptions
EXCEL DISTRICT ENERGY COMPANY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
7.4 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 8 more)
The Heat Station Harbour Parade, Southampton, Hampshire, SO15 1BA (26 components)
  • • 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however … (2)
  • • 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however …
  • • 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however …
  • • ... and 1 more unique descriptions
SOUTHAMPTON GEOTHERMAL HEATING COMPANY LTD(THE) CHP and autogeneration Combined Heat and Power (CHP)
4.9 MW
Inactive - 2025-26 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 7 more)
46 Station Road Stokesley Middlesbrough TS9 7AA (10 components)
  • • Gas CHP engines in commercial horticultural usage with no auxilliary load (4)
  • • 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
FLEXITRICITY LIMITED Reciprocating engines CHP and autogeneration Combined Heat and Power (CHP)
4.2 MW
Inactive - 2027-28 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 7 more)
International Conference Centre, Birmingham, B1 2EA (15 components)

1.6MW Combined Heat and Power at International Conference Centre (5)

BIRMINGHAM DISTRICT ENERGY COMPANY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
4.0 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 7 more)
National Indoor Arena, King Edward Road, Birmingham, B1 2AA (15 components)
  • • Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 18042602 (3)
  • • Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 081171171 (2)
BIRMINGHAM DISTRICT ENERGY COMPANY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
1.6 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 7 more)
Church Manorway, Erith DA8 1DL (33 components)

gas-fired CHP unit (5)

ENEL X UK LIMITED CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2024-25 (T-1), 2023-24 (T-1), 2022-23 (T-4) (and 7 more)
Repton Road, Measham, Swadlincote, DE12 7DT (9 components)
  • • Gas fired CHP unit (4)
  • • CHP unit
KIWI POWER LTD CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2024-25 (T-1), 2023-24 (T-1), 2022-23 (T-1) (and 5 more)
Laporte Road, Stallingborough, North East Lincolnshire, DN40 2PR (33 components)
  • • 2.8MWe back pressure steam turbine (3)
  • • 6.46 MWe Ruston Tornado Gas Turbine (Siemens SG200) (2)
ENEL X UK LIMITED CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2024-25 (T-1), 2023-24 (T-1), 2022-23 (T-4) (and 7 more)
Stoneykirk Road, Stranraer, DG9 7BU (9 components)
  • • Gas fired CHP unit (4)
  • • CHP unit
KIWI POWER LTD CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2024-25 (T-1), 2023-24 (T-1), 2022-23 (T-1) (and 5 more)
The Royal Marsden NHS Foundation Trust, Downs Road, Sutton, SM2 5PT (4 components)
  • • CHP (2)
  • • Gas Fired - CHP (2)
KIWI POWER LTD CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2024-25 (T-1), 2023-24 (T-4), 2019-20 (T-1) (and 1 more)
Showing locations 1 - 22 of 22