Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Storage (Duration 9h)

22 unique locations (135 components)

Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (74 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3416.01 MW
Foyers Power Station, Foyers, Inverness, IV2 6YB (16 components)
• Generating Unit 1 (3)
• Generating Unit 2 (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
852.09 MW
Deeside Power Station Zone 4 Weybridge Road Deeside Industrial Park Flintshire CH5 2UL (2 components)
• Gas Reciprocating Engines
• Grid Scale Battery Energy Storage.
Active • 2028-29 (T-4)
53.91 MW
Land East of Feckenham Substation, Astwood Lane, Feckenham B96 6HP (2 components)

New build BESS to be installed within a future Greener Grid Park. (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
45.92 MW
Land at Crown Farm, adjacent to Walpole Bank Road, Walpole, PE14 7JA (2 components)
• CMU ID 22KIN4, a new build battery storage CMU
• CMU ID 23KIN4, a new build battery storage CMU
Active • 2027-28 (T-4), 2026-27 (T-4)
32.75 MW
Three Cocked Hat Plantation Waplington Lane Allerthorpe East Riding Of Yorkshire (No post code, see cover letter) (1 component)

BESS project to be installed within a future Greener Grid Park.

Active • 2027-28 (T-4)
31.13 MW
Land north west of Bredbury Substation Welkin Road Bredbury, Stockport SK6 2BS (4 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
27.15 MW
Pikevy Farm, Glenrothes, Fife, KY6 3HD (2 components)

This is a 49.9MW battery storage facility connected at 33kV. (2)

Active • 2027-28 (T-4), 2025-26 (T-1)
20.72 MW
Land west of Roman Camp Road, Calderwood Broxburn West Lothian EH52 5PF (2 components)

Standalone battery storage system connecting at 33kV to the Broxburn substation (2)

Active • 2027-28 (T-4), 2025-26 (T-1)
19.47 MW
High Flat Farm BESS, Adjacent to East Kilbride 33kV substation G74 4GY (2 components)

Standalone battery storage system connecting at 33kV to the East Killbride substation (2)

Active • 2027-28 (T-4), 2025-26 (T-1)
19.47 MW
Land north west of Braintree Substation Braintree Road Cressing, Braintree CM77 8EZ (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
16.89 MW
LAND AT STUDLEY FARM, ATWORTH, MELKSHAM, WILTSHIRE, SN12 8LZ. (2 components)

Lithium-based battery energy storage system. (2)

Active • 2027-28 (T-4), 2026-27 (T-4)
16.74 MW
Land on the north side of Hickling Lane, Dunston, Norwich NR14 8PW (2 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2027-28 (T-4)
15.16 MW
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (8 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation. (6)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.22 MW
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (6 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.22 MW
Persley Croft, The Parkway, Aberdeen AB22 8AN (1 component)

CMU ID 23PER4, a new build battery storage CMU located at Persley Croft, The Parkway, Aberdeen AB22 8AN

Active • 2027-28 (T-4)
9.09 MW
Land At Drum Farm Keith Moray AB55 5NP (1 component)

Battery storage CMU

Active • 2027-28 (T-4)
9.06 MW
Land bounded by The Rake, Lower Jowkin Lane and Furbarn Road, Rochdale. OL11 5UT (1 component)

Rochdale (BES) Ltd is planning to install a battery storage system in an outdoor, fenced compound. Batteries will be installed in standard outdoor CATL modules with an internal racked system. …

Active • 2027-28 (T-4)
8.82 MW
Land west of Landulph Substation, Ellbridge Lane Hatt, Saltash, PL12 6NE (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2027-28 (T-4)
6.50 MW
Land west of Sellindge Substation, Church Lane, Sellindge, Aldington, Ashford TN25 6AF (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2027-28 (T-4)
5.68 MW
Loading map...
Showing 22 locations