Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Storage (Duration 8h)

8 unique locations (109 components)

Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (74 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3416.01 MW
Eccles Birgham Farm TD12 4LU (9 components)
• 400MW battery storage located near to the SPT Eccles substation, split into four BMU's
• 50MW battery storage located near to the SPT Eccles substation
• 50MW battery storage located near to the SPT Eccles substation.
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
197.82 MW
Land at Pond Farm, Pond Lane, Charlton, SN16 9DS (8 components)

A Battery Energy Storage System. (4)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
116.20 MW
Land lying at Southfields Farm, Garsdon, Malmesbury, SN16 9PQ (3 components)

A Battery Energy Storage System. (2)

Active • 2028-29 (T-4), 2025-26 (T-4)
79.30 MW
Land at Somerford Farm, SN16 9RN (4 components)
• A Battery Energy Storage System (3)
• A Battery Energy Storage System.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
58.18 MW
Land at Minety Substation, Stonehill Wood, Malmesbury, Wiltshire, SN16 9RP (4 components)

A Battery Energy Storage System. (4)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
46.96 MW
Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire, PA2 8UY (6 components)
• BESS project to be installed within a future Greener Grid Park. (3)
• 50MW of BESS to be installed within a future Greener Grid Park. (2)
Active • 2028-29 (T-4), 2026-27 (T-4) ...
37.96 MW
Land 475m NW of Hillcrest Cottage, Shebster KW14 7QY (1 component)

New build BESS to be installed within a future Greener Grid Park.

Active • 2028-29 (T-4)
15.28 MW
Loading map...
Showing 8 locations