Theme

Storage (Duration 6h)

3 unique locations (78 components)

Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (74 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3416.01 MW
Land East of Feckenham Substation, Astwood Lane, Feckenham B96 6HP (2 components)

New build BESS to be installed within a future Greener Grid Park. (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
45.92 MW
CryoBattery One Limited, 134 Manchester Road, Carrington, M31 4AY (2 components)
• The CRYOBattery? is the world?s first commercial-scale Cryogenic Energy Storage system. The technology uses surplus electricity to condense atmospheric air …
• The project is the world?s first commercial-scale Liquid Air Energy Storage (LAES) system. The technology uses surplus electricity to condense …
Active • 2028-29 (T-4), 2025-26 (T-4)
31.27 MW
Loading map...
Showing 3 locations