Storage (Duration 4h)

42 unique locations (172 components) - Page 1 of 2

Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (49 components)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 3)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 4)
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2549.84 MW
Thorpe Marsh Ash Fields Ash Fields Road off Marsh Lane Thorpe in Balne/Barnby Dun Doncaster DN6 0EA (10 components)

New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.

Active • 2028-29 (T-4)
584.36 MW
Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire PA2 8UY (2 components)

BESS project to be installed within a future Greener Grid Park.

Active • 2028-29 (T-4)
268.39 MW
Land east of Gainsborough Road Bole Nottinghamshire DN22 9EY (4 components)

New-build generating CMU comprising battery storage and associated plant to be constructed adjacent to the existing West Burton B CCGT, Nottinghamshire. Metering of output is Net of auxillary load.

Active • 2028-29 (T-4)
208.70 MW
Eccles Birgham Farm TD12 4LU (9 components)
• 400MW battery storage located near to the SPT Eccles substation, split into four BMU's
• 50MW battery storage located near to the SPT Eccles substation
• 50MW battery storage located near to the SPT Eccles substation.
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
197.82 MW
170.15 MW
Land at Pond Farm, Pond Lane, Charlton, SN16 9DS (8 components)

A Battery Energy Storage System. (4)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
116.20 MW
Thornton Greener Grid Park, Thornton, Melbourne, York, YO42 4RZ (2 components)

BESS project to be installed within a future Greener Grid Park. (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
88.23 MW
Land off Carlisle Road (B7078), JJ's Farm, Coalburn, Lesmahagow, South Lanarkshire, ML11 0JU (4 components)
• 40MW battery storage located near to the Coalburn North 400kV substation.
• 50MW battery storage located near Coalburn North 400kV substation.
• 50MW battery storage located near to the Coalburn North 400kV substation.
Active • 2028-29 (T-4), 2027-28 (T-4)
72.65 MW
East Tarelgin Farm, Ayr, KA6 6NF (4 components)
• 18.5MW/74MWh of BESS to be installed within a future Greener Grid Park.
• 50MW/100MWh of BESS to be installed within a future Greener Grid Park.
• BESS to be installed within a Greener Grid Park
Active • 2028-29 (T-4), 2026-27 (T-4) ...
39.02 MW
Spring Lane, Gedling, Nottinghamshire, NG4 4PD (1 component)

New Build Storage Facility

Active • 2028-29 (T-4)
37.57 MW
Wadsworth Farm, Toronto, Bishop Auckland DL14 7RL (2 components)
• A 50MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
31.34 MW
Coal Aston, Dronfield, S18 3AA (2 components)
• A 45MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
28.21 MW
Selby, North Yorkshire, YO8 6PG (2 components)
• A 40MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
25.07 MW
Dounreay, Thurso KW14 7RE (2 components)
• A 34MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
21.31 MW
Persley Croft, The Parkway, Aberdeen, AB22 8AN (1 component)

The proposed BESS has a capacity of up to 49.9 megawatts (MW) The proposals are likely to consist of: ? 30No. battery storage cubes ? 14No. inverters; ? 7No. transformers; …

Active • 2028-29 (T-4)
19.79 MW
16.70 MW
Scalm Park, Wistow Common, Selby, Yorkshire, YO8 3RD (1 component)

New Build Battery Storage Facility

Active • 2028-29 (T-4)
16.70 MW
Hollybush, Ebstree Road, Trysull, Wolverhampton, WV5 7JE United Kingdom (1 component)

BESS stand alone projec connected to 49.9MVA import/export to Penn-Wolverhampton West n2 132kV OHL (NGED). The purpose of the BESS is to provide balancing services to the local electricity grid. …

Active • 2028-29 (T-4)
7.93 MW
Tillingdown Lane, Caterham, CR3 7JA (2 components)
• A 12MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
7.52 MW
7.51 MW
Tyrant Farm, Treowen, Newbridge, Newport, NP11 3BS (1 component)

New Build Battery Storage Facility

Active • 2028-29 (T-4)
5.22 MW
Part Of Franklin Hodge Building, Ramsden Road, Rotherwas Industrial Estate, HR2 6LR (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Off Bonnington Walk, Lockleaze, Bristol, BS7 9XF (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW