Storage (Duration 3.5h)

7 unique locations (18 components)

Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire, PA2 8UY (6 components)
• BESS project to be installed within a future Greener Grid Park. (3)
• 50MW of BESS to be installed within a future Greener Grid Park. (2)
Active • 2028-29 (T-4), 2026-27 (T-4) ...
37.96 MW
Land south of Inglis Farm, Cockenzie, East Lothian, EH32 0JT. (1 component)

New build battery energy storage unit.

Active • 2028-29 (T-4)
36.57 MW
Land north west of Braintree Substation, Braintree Road, Cressing, Braintree, CM77 8EZ (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2025-26 (T-1)
15.48 MW
School Power, Rochester Road, Wouldham, Rochester, ME1 3TS (4 components)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV … (2)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid (2)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
4.87 MW
Dellsome Power, Hatfield Grid Station, Dellsome Lane, Colney Heath, St. Albans, AL4 0QT (3 components)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV … (2)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active • 2027-28 (T-4), 2025-26 (T-1) ...
3.68 MW
Glowhouse Power, 135 Clydesdale Place, Moss Side Industrial Estate, Leyland, PR26 7QS (2 components)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV …
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active • 2025-26 (T-1), 2024-25 (T-1)
2.58 MW
Poulton Power, Cocker Avenue, Poulton Industrial Estate, FY6 8JU (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network

Active • 2024-25 (T-1)