Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Storage (Duration 2h)

509 unique locations (1516 components) - Page 21 of 21

STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (2 components)
• Battery energy storage facility with a 2 hour duration and a maximum capacity of 14 MW, located in Buxton.
• Battery energy storage facility with a 2 hour duration and a maximum capacity of 14MW, located in Buxton
Active • 2025-26 (T-1), 2024-25 (T-1)
LAND AT DUNHAMS LANE LETCHWORTH GARDEN CITY SG6 1JH (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2024-25 (T-4)
Land at Boreham Street Farm, Boreham Street, Hailsham, Sussex, BN27 4SJ (1 component)

A Battery Energy Storage System

Active • 2025-26 (T-4)
Mill Hill Farm, Hazel Grove, SK12 1EG (1 component)

A Battery Energy Storage System

Active • 2025-26 (T-4)
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (8 components)
• A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
• A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
• A 20MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
• ... and 2 more unique descriptions
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Land directly South to Coventry Substation, Parrotts Grove, AldermanCoventry, CV2 1NQ (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Inactive • 2023-24 (T-1)
Salisbury BESS, The Avenue, Salisbury, Wiltshire, South West England, England, SP2 0BU, United Kingdom (2 components)
• The CMU is a Battery Energy Storage System with a planned 49.5MW active power output, consisting of containerised batteries.
• The CMU is a Battery Energy Storage System with a planned 49.9MW active power output, consisting of containerised batteries.
Active • 2025-26 (T-4), 2024-25 (T-1)
Land north east of Bustleholm Substation, M6, Walsall, WS5 4SJ (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Inactive • 2023-24 (T-1)
Overlea Farm , New Mills, High Peak, Stockport SK22 4QJ (1 component)

A Battery Energy Storage System

Active • 2025-26 (T-4)
Loading map...
Showing 9 locations