Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Storage (Duration 2h)

509 unique locations (1516 components) - Page 20 of 21

Gerard Hall Battery Site, Mill Lane, Nursling SO16 0YE (2 components)

New Battery Storage Site comprising brand new batteries & inverters

Active • 2025-26 (T-4)
Timsbury Manor, Romsey SO51 0NE (1 component)

Lithium ion battery operating as a power plant. Change of use from redundant quarry.

Inactive • 2022-23 (T-4)
West Marsh Road Spalding Lincolnshire PE11 3BB (14 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is … (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Land at Hawkers Hill, Motcombe, Shaftesbury, Dorset, SP7 9NP, (4 components)

This is a 20MW battery storage facility connected at 33kV. (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (8 components)
• A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
• A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
• A 20MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Land on Jameston Farm, Dalry Ayrshire KA24 4EY (1 component)

Array of lithium ion batteries in a power generation environment, proving power to National Grid. Change of use of land from agricultural to new build generation.

Inactive • 2022-23 (T-4)
Plot 10 Dunnikier Business Park Midfield Drive Mitchelston Industrial Estate Kirkcaldy Fife KY1 3LW (2 components)

BATTERY STORAGE UNIT WITH 13.5 MWh energy supply and 20 MW power capacity (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
LAND ON THE EAST SIDE OF CORONATION SQUARE ARDWICK M12 6EL (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2024-25 (T-4)
LAND AND BUILDINGS ON THE SOUTH EAST SIDE AND ON THE NORTH WEST SIDE OF CRANBORNE ROAD POTTERS BAR EN6 3JF (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2024-25 (T-4)
Harrop Lane, Hare Croft, Wilsden, Bradford, West Yorkshire,BD15 0BZ (3 components)

New build battery storage. (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Catridge Farm, Wick Lane, Lacock, Chippenham, SN15 2LU (1 component)

A Battery Energy Storage System

Active • 2025-26 (T-4)
Mill Hill Farm, Hazel Grove, SK12 1EG (1 component)

A Battery Energy Storage System

Active • 2025-26 (T-4)
Land at STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (1 component)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 16MW, located in Buxton.

Active • 2025-26 (T-1)
Land at Capenhurst Sub Station, Capenhurst, Cheshire, CH66 2HJ (5 components)
• A New Build Battery Energy Storage System (2)
• A New Build Gas fuelled power plant at Capenhurst substation
Active • 2025-26 (T-4), 2024-25 (T-4) ...
The Manorway, Stanford-leHope, SS17 9LL (5 components)
• A gas fuelled generating station (2)
• A Battery Energy Storage System
Active • 2025-26 (T-4), 2024-25 (T-1)
South of Carnegie Road, Liverpool, L13 3AT (1 component)

New build battery storage

Active • 2025-26 (T-4)
Land at Gagie Home Farm Holdings, Tealing, DD5 3PP (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2025-26 (T-4)
Abbey Home Farm, Burford Road, Cirencester, GL7 5HF (1 component)

A Battery Energy Storage System

Active • 2025-26 (T-4)
Felindre Pumping Station Substation, Pant Lasau Road, Llangyfelach, Morriston, SA5 7PA (1 component)

16MW/32MWh BESS on a future Greener Grid Park.

Active • 2025-26 (T-4)
Land at Ocker Hill Substation, Power Way, Tipton, DY4 0PW (3 components)
• A Battery Energy Storage System. (2)
• A New Build Gas fuelled power plant.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Beeston Park Farm, Ridge End Fold, Marple, Stockport, SK6 7EX (1 component)

A Battery Energy Storage System

Active • 2025-26 (T-4)
Loading map...
Showing 25 locations