Land at Broken Cross, S Lanarkshire, ML11 9PB (2 components)
Shipley Road, Goffsland Farm, Shipley, Horsham, West Sussex, England, RH13 8PA, United Kingdom (1 component)
The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.
BSB Transport Ltd Trondheim Way, Redwood Park Estate, Stallingborough, Grimsby, North East Lincolnshire, DN41 8FD. (4 components)
A Battery Energy Storage System. (3)
adjacent to National Grid Stalybridge substation SK15 3DA (3 components)
Land at Somerford Farm, SN16 9RN (4 components)
Calow Green, Calow, North East Derbyshire, S44 5XQ (8 components)
A stand alone Battery Energy Storage System. (2)
Cleve Hill, Seasalter Road, Graveney with Goodnestone, Swale, Kent CT5 4BP (1 component)
A new build 230MW/460MWh battery storage facility connected to the National Grid Transmission network at 132kV, located at Cleve Hill.
Fiddlers Ferry BESS, Widnes Rd, Warrington WA5 2UT (2 components)
The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries. (2)
Land at Smith Road, Wednesbury, WS10 0PD (2 components)
adjacent to Kilmarnock South Substation KA1 3TN (2 components)
Land, North of A683 & Heysham substation, Lancaster, Morecambe Bypass, Morecambe, Lancashire. (1 component)
2H duration Lithium Ion Battery Storage New Build CMU.
Land at Minety Substation, Stonehill Wood, Malmesbury, Wiltshire, SN16 9RP (4 components)
A Battery Energy Storage System. (4)
Station Road, Southfleet, Dartford, Kent, England, DA13 9PA, United Kingdom (1 component)
The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.
LAND SOUTH OF WAKEFIELD B SUBSTATION AND EAST OF NEIL FOX WAY, WAKEFIELD, WF1 5DB (3 components)
Land off Saundercroft Road, Broadclyst, Devon, EX5 2PF (1 component)
Battery Storage Plant
Lakeside Energy Storage facility, New Road, Long Drax, Selby, North Yorkshire, Y08 8FP (2 components)
This is a 99.9MW battery storage facility connected at 132kV. (2)
Thorpe Marsh Ash Fields, Ash Fields Road, off Marsh Lane, Thorpe in Balne/Barnby Dun, Doncaster, DN6 0EA (1 component)
New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.
Thorpe Marsh Ash Fields, Ash Fields Road, off Marsh Lane, Thorpe in Balne/Barnby Dun, Doncaster, DN6 0EA (1 component)
New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.
Thorpe Marsh Ash Fields Ash Fields Road off Marsh Lane Thorpe in Balne/Barnby Dun Doncaster DN6 0EA (1 component)
New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.
Land to the west of Pound Road, Axminster EX135UP (2 components)
Site at Whitehill Farm, Coatbridge Road, Gartosh, G69 8DT, United Kingdom (1 component)
New build battery storage
Land to the south of National Grid's Rainhill Substation, Lea Green Road, Rainhill, WA9 4QD (5 components)
Battery Project on Greenfield Site (4)
East Tarelgin Farm, Ayr, KA6 6NF (4 components)
Linton, Highnam, Tewkesbury, Gloucestershire GL2 8AA (2 components)
Energy facility comprising of battery energy storage sets and ancillary equipment. (2)